UVM UTILITY SYSTEM MASTER PLANNING IDEA CONFERENCE International District Energy Association Sal Chiarelli, Director of Physical Plant, UVM February 2006.

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Energy Saving in Hospitals: Hong Kong Initiatives
Let’s Get Energized Saving Energy At School Sites.
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Installation of New CHP system at the Old Aberdeen Campus.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Integration of CHP Into Waste Water Treatment Processes London 5 th November 2014 Peter Bense.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
VT Department of Forests, Parks & Recreation Wood Energy in Vermont January 2005 VT Department of Forests, Parks & Recreation.
Co-generation Cogeneration is an attractive option for facilities with high electric rates and buildings that consume large amounts of hot water and electricity.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
ISA April 23rd, Reducing Site Energy Costs with Combined Heat and Power Generation.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Engineer Fahad Hasan Associate Yousuf Hasan Associates, Consulting engineers District cooling.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
“Energy Efficiency Guide for Industry in Asia”
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Generating electricity from natural gas: The way forward for Nigeria A presentation by: NNPC FSTP Class E, study group 3.
COGENERATION Allison M. Selk 12/8/04 CBE 562.
Ever-greenenergy.comEver-Green Energy “For the average coal plant, only 32% of the energy is converted to electricity; the rest is lost as heat.” -Page.
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
POWER GENERATION TECHNOLOGIES
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Cogeneration.
Cogeneration by Michael Bokor. Definition Sustainability Capable of being continued with minimal long-term effect on the environment. In the terms of.
Physical Plant Department Physical Plant Department Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities, Data Center,& IT Regional Seminar Series Mike.
Economic Impact of Medical Education Expansion in Nevada & Recommended Approach FUTURE 1.
Performance Contracting The Honeywell One Source Solution.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 Progress Toward Sustainability at Williams College.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
1 Steam to Hot Water Conversion The University of British Columbia Paul Holt Director, Generation & Distribution.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
Technology details, potential and experiences of Trigeneration
Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research.
Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802) fax
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Copyright, CEERE, University of Massachusetts at Amherst Combined Heat and Power Solutions Beka Kosanovic, PhD. Northeast CHP Application Center.
Physical Plant 2015 All Hands Meeting Sal Chiarelli, Director of Physical Plant, UVM October 8, 2015.
Puerto Rico Electric Power
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
CHP Project Costs Screening Public Utility Commission of Ohio Public Utility Commission of Ohio Combined Heat and Power: Financial.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Church Presentations By Peter Boogaart Holland, MI
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
UMCP Learning Objectives
Hyde Park Central School District
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
campus carbon footprint
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Energy Conservation CERD /12/2017
Presentation transcript:

UVM UTILITY SYSTEM MASTER PLANNING IDEA CONFERENCE International District Energy Association Sal Chiarelli, Director of Physical Plant, UVM February 2006

A Little Bit About UVM 9,000

Dudley Davis Student Center

Physical Plant IDEA 2006

Background UVM’s Infrastructure: –Centralized heating system –Localized cooling system –Purchased power with over 125 meters –Limited investment in infrastructure

What Are Some Of Today’s Issues The growth on campus Energy costs Systems are outdated and obsolete Chilled water is not centralized Air conditioning is an expectation Utilities are critical for Research System reliability

Physical Plant Goals Convince UVM’s Administration to invest more in infrastructure to meet the needs of the future Develop a realistic utilities plan Capitalize on planned construction/excavation Reduce incremental utilities costs Reduce downtime of utilities

Some Other Objectives Invest in the future - UVM will be here forever Develop chilled water system Develop Combined Heat and Power (CHP) Maximize the use of the steam system Minimize demand charges from local utilities Invest in distribution and central systems. Design for contingencies Use fuel to the maximum to benefit the environment Use systems as an educational model Current construction creates opportunities

Campus-Wide Peak Electrical Demand: Current Year (Yr 2003)11.5 MW Projected Year (Yr 2010)16.0 MW Over 35% increase

Financial Outlook 2003 Energy Cost (Fuel Oils, Natural Gas, Water and Electric) ~ $10 Million 2006 Projected Energy Cost ~ >$13-15 Million

Physical Plant Operating Budget FY05- $25.2 Million

Sightlines Database Average: $6.70 /GSF Institution Shown: Duquesne University Indiana University Pennsylvania State University Rensselaer Polytechnic Institute Rutgers University Southern Methodist University Tufts University University of Denver University of Massachusetts Wesleyan University

Tri-generation Vision Generate energy for heating, cooling and electricity from a central source

Creating and Sharing The Vision Administrative Hearings/Meetings Board Presentations Using Visuals Identifying Potential Losses (risk assessments) Long Term Outlook Environmental University

Cooling System Our Approach: –Build centralized system in multiple phases to lower costs –Expand plant in the future to provide cooling for new as well as existing buildings

–Lower life cycle costs –Operating cost reduction of about 30% –Allows optimum system configuration for the CHP System –Reduction of peak electrical power –Substantially lower costs for the future –Less construction time for future buildings –Allows cooling of historical buildings –Lower emissions - better environment-regionally Major Advantages of Centralized Cooling System

Combined Heat and Power (CHP) Proposed CHP is for a 4.5 MW unit

–Increase overall efficiency –Reduces overall emissions –Helps local electric company as their power purchase need is reduced. –Protects UVM and city from potential brownouts –Has a potential to reduce annual energy costs to UVM by $2.0 million dollars –Offsets the need for the future steam boiler Major benefits of Combined Heat and Power

Efforts Pay Off (So Far)

Deferred Maintenance Utility Infrastructure Non-Operating Physical Plant Investment Projected

WM Group Engineers

Our relationship with UVM Involved since the early seventies –Created a central heating plant UVM is different than most facilities –As the university will be here for hundreds of years, the infrastructure decisions are based on vision rather than just bean counters

Site Utilities Analysis and Design Heating site distribution system analysis and design CHW systems master plan Cogeneration analysis Comprehensive Utility Master Plan Chiller plant expansion

Why comprehensive utility master planning? Infrastructure includes over fifteen utilities for a campus Most of the time communication between different consultants designing their specialty utility does not exist Relocation of relatively newly installed utilities for a new building is quite common

Site Utilities High voltage electrical Low voltage electrical Emergency Power Communication & life safety Natural gas Nitrogen Steam/hot water Chilled water Condenser water Fuel oil Sanitary Sewer Storm water Fire water Domestic water Domestic hot water Laboratory waste

Problem: Typically there is little or no coordination between campus projects and campus utilities Each project is performed in a “vacuum” without consideration of the overall campus master plan In most cases a master plan does not exist or is not implemented

Project Goal: 1.Incorporate all individual utility maps into a single electronic site utility map 2.Map to be used for: –Mapping existing conditions –Estimating remaining useful life –Identify areas of deficiencies –Planning future utilities expansion based on anticipated future campus growth

Campus Utilities: Civil: Krebs & Lansing Storm Sewer Sanitary Sewer Water – Domestic, Fire Protection, Irrigation Natural Gas Mechanical: WM Group Engineers Steam & Condensate Chilled Water Fuel Oil

Electrical: UVM, BED, Wolbach, WM Group Power Distribution Emergency Power Lighting Telecommunications: UVM - Telecom PBX Controls: UVM - PPD Building Management Systems Security/Fire Campus Utilities (cont’d)

Approach: 1.Receive latest background from UVM - Based on Lockwood map 2.Collect latest existing utility info 3.Generate working background - Create presentation standard (i.e. scale, view ports, title block, etc.) - Create layer convention (i.e. layer designations, color, text height, insertion points, etc.)

4. Create FTP site 5. Each utility accesses background (via FTP site) to create map of utility based on existing, demo, proposed, and future. 6.WM Group to act as “Quarterback” to coordinate all consultants to create a “Master Utility Plan” 7.All consultants to update drawings based on their latest surveys Approach (Cont’d)

8.Identify condition, remaining life, etc. of the existing systems 9.Prepare a report of the existing conditions 10.Living document to be updated as required 11.Expandable to include GPS coordinates and site specific information Approach (Cont’d)

Distribution Phasing

Communication between the various utility consultants is a key to infrastructure planning success You need to have a “Quarterback” from New York with a Type A personality to lead the team! Technology is changing and the use of GPS with infrastructure planning is a must for all Universities Summary

Questions & Answers

Thank you