February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.

Slides:



Advertisements
Similar presentations
Water Distribution Systems – Part 1
Advertisements

Describe a water supply distribution system
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Anne Arundel County Department of Public Works
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Hydraulic Optimization of the Northern Water Supply System Presentation by: Tom Charles, P.E., DEE Jim Kriss, P.E. Jennifer Wendrowski, E.I.T. September.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
A Preliminary Analysis of the Impacts of Climate Change on the Reliability on West Side Water Supplies Richard Palmer and Margaret Hahn Department of Civil.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Surface Reservoir Storage Operations 2011 Public Utilities Department Public Utilities Department ( (Water Operations Branch)
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
1 Fork Union Sanitary District Financial Overview January 6, 2010 (Updated for May 5, 2010)
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Water System Planning Study
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Safe Drinking Water Permit and Capacity Requirements Developer Services Summit November 16, 2010 Engineering - Asset Planning Vince Monaco.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the 7 th Power Plan November 18, 2014.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Land Needs Simulator: Overview and Recommended Assumptions Presented to: RPS Policy Committee Presented by: ECONorthwest January 9, 2007.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the Seventh Power Plan October 14,
Public Information Meeting Wastewater Treatment January 26, 2016.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
What are they and how are they calculated? May 2015.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Island County Comprehensive Plan 2016 Review and Update Buildable Lands Analysis Results 1.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Lecture (11): Water Distribution Systems
Richland Creek Water Supply Program Briefing
Land Use Urban Service Boundary is the framework for managing growth.
Water & Wastewater Capacity Charge Work Shop
Overview of the CoJ Water & Sanitation Master Plan
2017 Fee Calculation Methodology – A Case Study
Rate Increases: Reasons Methods.
An-Najah National University Faculty Of Engineering
Outline of Presentation
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Redundancy and Emergency Interconnectivity (REI) Plan
City Council Meeting February 16, 2010
Class III Estimate for Regional Consolidation
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Future Water Supply Evaluation
City of Sunrise Wastewater Reuse Program
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Presentation transcript:

February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.

2  Purpose of the plan  Existing water system overview  Service area growth and future water needs estimate  Water distribution system analysis  Summary of recommended improvements & capital improvement program

3  Long term guidance document – Identify current system deficiencies – Plan for facility upgrades – Plan for service area growth and expansion  Comply with state drinking water program requirements

44

5  20-year and saturation development horizons considered for water facility planni ng  Anticipated growth areas within 20-year horizon – Existing City Limits – Tonquin Employment Area (TEA) – Brookman Annexation Area – West Urban Reserve

6  Annual Average Growth – 1.25% through 2019 – 0.15% through 2024  Saturation in 10 years

7  Use 2010 Concept Plan Projection s – TEA - 20-year % developed – Brookman - saturation in 20 years

8  Initial development in 10 years  ¼ developed in 20 years  Land uses mirror existing city  10 net units per acre residential

9  Future water demands forecast based on recent water use trends and projected growth  Residential water demand estimates – 213 gpd/unit  Non-residential water demand estimates – 437 gpd/acre – 45 gpd/job

10  Updated water demand estimates YearAverage Daily Demand (mgd) Maximum Day Demand (mgd) Current Saturation4.39.0

11  Additional 4 mgd needed to meet max day demands at saturation development  Future supply anticipated from Willamette River Water Treatment Plant (WRWTP)  Supply development timeline influenced by WRWTP partners  Emergency supply from city wells and Portland

12  Storage & Pumping – Adequate capacity to meet projected demands through the 20-year planning horizon  Pressure Zones – Service pressure goal = 40 to 80 psi – Areas of Brookman and West Urban Reserve to be served from proposed future pressure zones  Distribution Piping – Hydraulic model of system pressure and flow Identify system deficiencies Test facility alternatives

13  Short-term improvements (next 10 years) - $19.9 million – Willamette River Water Treatment Plant expansion – Resilience plan – SCADA system upgrade – Distribution piping  Long-term improvements (through saturation) - Additional $16.3 million – System expansion – Pipe replacemen t

14