2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.

Slides:



Advertisements
Similar presentations
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Advertisements

Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Water System Regulation and Planning Regina Grimm, P.E.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Leak Detection at C.C.W.A.. History of C.C.W.A. CCWA produces up to 39 million gallons a day of potable water. We have a potable water storage capacity.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Federal, state and local government entities working together to meet the health, welfare and public safety needs of Wyoming’s citizens. January 11, 2011.
Simple Tabletop Exercise Objectives:  Evaluate cyber security protocols and procedures  Consider to what degree reliance on SCADA Systems is appropriate.
Simple Tabletop Exercise Objectives:  Evaluate chemical supply alternatives  Determine interdependencies between the utility and other infrastructures.
Joe Crossland Finance Director Office of Drinking Water.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration ~NPMS ~ National Pipeline Mapping System
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
1 Investing in your water … investing in your future California American Water General Rate & Conservation Case Applications.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Water Treatment & Distribution System Overview.
Lecture 1 Water Distribution Systems
Water System Planning Study
Money Talks: Stretching Precious Dollars Drinking Water State Revolving Fund December 11, 2013.
Water Supply Planning Initiative State Water Commission November 22, 2004.
GIS / Hydraulic Model Integration 2008 ESRI UC Will Allender, GISP Planning and Engineering Asset Systems Planning August 6, 2008.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Community Water Supply Efficiency Improvements Potential Savings for the 6 th Power Plan September 30 th, 2008 Regional Technical Forum.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Overview Asset Management (AM) is a systematic process of operating, maintaining, upgrading and disposing of assets cost- effectively while maintaining.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the 7 th Power Plan November 18, 2014.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Water System Consolidation and Restructuring Scott Torpie Washington State Department of Health Drinking Water Advisory Group November 3, 2014.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the Seventh Power Plan October 14,
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
1 Information Hearing The San Bruno Explosion: Pipeline Safety In California Panel IV – Maintenance, Inspection & Financing of Gas Transmission Pipelines.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
Water Filtration Plant Improvements Project Summary
CROSS CONNECTION CONTROL PROGRAM
Lecture (11): Water Distribution Systems
Sustainable Water Infrastructure through Innovative Financing
Drinking Water State Revolving Fund and Performance Based Infrastructure Janet Cherry, PE Office of Drinking Water.
Kings Bluff Raw Water System Parallel Raw Water Main Project
Perris Water Filtration Plant Membrane Upgrade – Phase I
An Introduction to the 2015 Needs Assessment and Survey Paige Igoe Washington State Office of Drinking Water Official name is Drinking Water Infrastructure.
City of Noblesville Wastewater Utility
Finance Options: Funding Water Infrastructure Projects George Bryan South Carolina Department of Health and Environmental Control State Revolving Fund.
Jim Flechtner, PE Executive Director April 26, 2018
OHWARN Workshop Disruption of Service Rule Update
City of Valdosta Utilities Department.
Association of State Drinking Water Administrators
FEE INCREASES Public Work Shop June 2, 2018.
Lake Margaret Water System Status Summary
City Council Business Meeting
Indiana Finance Authority (IFA)
Presentation transcript:

2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water

Office of Drinking Water’s Mission To protect the health of the people of Washington State by ensuring safe and reliable drinking water.

What is the Needs Assessment? 20-year forecast of capital investment needs. Required by Congress every four years.  Includes all 11 large utilities ( over 100,000 population)  Includes 44 medium-sized utilities (3,300 to 100,000 population) Framework:  Project-by-project bottom-up approach  Statistically valid  Rigorous documentation

Why is it Important to Utilities? Future annual Drinking Water State Revolving Fund (DWSRF) allotments will be determined by the Needs Assessment. Small change in national share makes a big difference in the annual DWSRF allotment. Recent Needs Assessment results:  2007: 2.55 percent of national need  2011: 2.33 percent of national need

DWSRF Appropriation

DWSRF Loans

Why is it Important to Us? We may “set aside” some of our annual SRF allotment for important activities:  Provide source water protection mapping and data storage.  Fund our source water protection, preconstruction, and consolidation/feasibility study grant programs.  Pay third-party technical assistance contractors.  Fund our treatment optimization program.  Subsidize the cost of LHJ surveys, technical assistance, special purpose investigations, and emergency response to purveyors.

ODW Operating Budget

Strategy Schedule utilities into three groups:  April – May  June – July  August – September Assign an ODW main point-of-contact to work with each water utility. Communicate by phone and in writing with each water utility, and request the utility assemble their records.

Strategy (cont.) Meet at the utility and review/collect inventory and project information. Update 2011 Needs Assessment survey information (for systems that participated in the last one). Assemble inventory and project information, confirm with the utility, and submit to EPA.

Inventory Information Needed Inventory of Existing InfrastructureComment Distribution and transmission mainsLength (feet) broken down by size (pipe diameter) Reservoirs (raw water storage and finished water storage) Elevated (stored volume is above the ground) or ground-level (bottom of tank is in contact with the ground); and volume of each reservoir Hydropneumatic (pressurized) storageVolume of each tank Well or spring (each source)Rated production capacity (MGD) of each source Well or spring pump (each pump)Rated capacity (MGD) of each source pump ASR well (each well)Rated withdrawal capacity (MGD) of each well Raw water source pump (each pump)Rated production capacity (MGD) of each source pump Booster pump stationRated capacity of each station (MGD) Customer service connectionsNumber broken down by size (diameter) Customer service metersNumber broken down by size (diameter) Emergency power (gen sets)Rated kW of each unit Backflow valves owned by the utilityNumber broken down by size (diameter) Distribution system control valves (PRVs)Number broken down by size (diameter) Treatment – complete systemRated treatment capacity (MGD) of each treatment plant Treatment – limited to chemical injection (e.g., disinfection, fluoridation) Rated treatment capacity (MGD) of each treatment system SCADAYes, utility has SCADA; or No, utility doesn’t have SCADA

Project Information Needed Specific projects planned through 2035Comment Specific projects identified in 2011 Needs AssessmentSee next slide. Pipeline replacement program Length and size of pipe; phasing (if appropriate). Provide documentation of need; include cost estimate and estimate date. New or replacement source, ASR project, reservoir, booster pump station, pumps, or treatment (complete or chemical injection) Project need cannot be to primarily driven by growth or provision of fire flow. Provide documentation of need; include cost estimate and estimate date. Membrane replacement or filter media replacementRated capacity (MGD) of membrane plant and replacement frequency. Upgrade to existing treatment plant New treatment element (e.g., add UV or corrosion control) to an existing treatment process. Addition of new treatment (no treatment exists at present) Example: adding disinfection or fluoridation treatment; rated treatment capacity (MGD). New emergency power facilities (no emergency power exists at present) Rated kW per new unit.

For 2011 Participating Utilities Identify capital projects: – Started before January 1, – Not started before January 1, and the utility is still committed to completing the project:  Scope of project unchanged.  Scope of project changed since – Not started, and the utility decided to abandon the project.

2011 Project Summary Examples City of Washougal S:\EPH\DW\Field Operations\Needs Assessment\Individual Water System Files\Washougal, City of\2011 Survey Information City of Cheney S:\EPH\DW\Field Operations\Needs Assessment\Individual Water System Files\Cheney, City of\2011 Survey Information City of Anacortes S:\EPH\DW\Field Operations\Needs Assessment\Individual Water System Files\Anacortes, City of\2011 Survey Information

Questions and Comments