Water for Life Project Apatut, La Union, Philippines

Slides:



Advertisements
Similar presentations
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Advertisements

The Engineer as Global Citizen November 16, 2010 Steve Adams President ENGINEERS WITHOUT BORDERS - USA Portland Professional Chapter (EWB Portland)
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
ISLA POPA II, PANAMA WATER SUPPLY PROJECT July 10 th 2014.
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
GRANT MANAGEMENT SEMINAR
Engineers Without Borders-USA Mid-Atlantic Professionals Chapter Water for Life Project Apatut, La Union, Philippines Project LeadsTechnical LeadsEWB-USA.
Engineers Without Borders Princeton University Amanda Li ‘16, Corrie Kavanaugh ‘17, Hana Ku ‘17, Josh Umanky-Castro ‘17, Kasturi Shah ‘16, William Guiracoche.
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
ENGINEERS WITHOUT BORDERS USA ALAMO PROFESSIONAL CHAPTER.
District 6380 Rotary Foundation Grant Management Seminar.
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.
1 ASEI Sanitation Project ‘A Vision For Change’ Presented at the 2008 ASEI Sanitation Symposium February 9, 2008 Sharanpal (Paul) Sikand Jayant (Jay) Patel.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
Engineers Without Borders–USA (EWB-USA) National Organization Overview Barry Borges, President EWB – High Plains Professional Chapter Idaho Society of.
Fast for Hope World Community Service in Action Haiti --- Many needs, Many Opportunities. A Presentation by District 5960 Fast for Hope
ENGINEERS WITHOUT BORDERS – NORTHEASTERN UNIVERSITY CHAPTER MENTOR: TIMOTHY J. MCGRATH, PH.D., P.E. Water Storage and Distribution Bbanda, Uganda.
South Central Florida Professional Chapter Reliable Water Sources for Corail Lamothe, Haiti.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
EWB-NCSU Bolivia Water Supply Project. Why Do They Need Additional Water Supplies? School Students Add to Population Rainfall – Avg. 8.5 in/yr – 0.7 in/month.
District 6200 Rotary Foundation Grant Management Seminar.
Training of Process Facilitators Training of Process Facilitators.
SPWSTAC 2006 From POU to Centralized Arsenic Treatment: A Small Water System Case Study 2006 NGWA Naturally Occurring Contaminants Conference J. Mitchell.
Engineers Without Borders CCNY Chapter Project in Milla Tres, Honduras August 2012.
Mission and Vision Our MISSION is to support community-driven development programs worldwide by collaborating with local partners to design and implement.
1 02/02/13 Future Vision Midterm Information. 2 Future Vision A New Grants Model June 30, 2013 – No more DSGs or MGs July 1, 2013 all Rotary clubs throughout.
1 Part 2 Creating a Project. 2 Successful Grant Projects Real community needs Frequent partner communication Implementation plan Sustainable Proper stewardship.
Dominique Poulin Environmental Health First Nations and Inuit Health Branch Health Canada Health Canada’s Implementation of the Drinking Water Safety Program:
EWB-USA Program Sustainability. Goal of Presentation: To assist project teams and partnering communities in making projects that are sustainable, from.
How to Complete a Matching Grant Application. Learning Objectives Overview of the MG process Preparing to complete an application Completing application,
Quality Assurance Review Team Oral Exit Report District Accreditation Bibb County Schools February 5-8, 2012.
EWB-USA Principles of Development. Our Mission EWB-USA supports community-driven development programs worldwide by collaborating with local partners to.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
District 5810 Grant Qualification John D. Moser District Grant Chair The Rotary Club of Frisco.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
FVP Future Vision Plan Lisätietoa FVP:sta Eija Hatakka-Peltonen.
Student Services Fees February 7, 2009 “Building a better world, one community at a time” Engineers Without Borders – University of Minnesota.
1 District 7750 Grants Training November 9, 2013.
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
Engineers Without Borders Oregon State University.
Engineers Without Borders-USA Mid-Atlantic Professionals Chapter Water for Life Project Apatut, La Union, Philippines Amanda Jacobs Project Lead.
Quality Assurance Review Team Oral Exit Report District Accreditation Rapides Parish School District February 2, 2011.
EWB-USA’s Community-Driven Development Approach. Presentation Outline Questions for You Why We Use a Community-Driven Approach An EWB-USA Example EWB-USA’s.
San Diego State University Chapter Established 2007.
Educational Master Plan Update Associated Students of Foothill College (ASFC) November 19, 2015 E. Kuo FH IR&P.
Bidders Conference PI-SNAP-Ukraine-01 Kyiv, Ukraine _________________________________ February 12, 2015 Matthew Krause Partnership Development Lead Feed.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
Presidents-elect Training Seminar | 1 R. I. District 3011 Humanitarian Service through Effective Service Projects PDG
San Diego State University Chapter Established 2007.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
Building a better world one community at a time. ENGINEERS WITHOUT BORDERS USPHS Engineers as Professional Mentors to Student Chapters of Engineers Without.
Foundation Qualification Training – District 7080 November 28 th, 2015.
Global Grants for International Projects, Terms and Conditions THE ROTARY FOUNDATION TRAINING SEMINAR, TALLINN Global Grants for International.
Neighborhood Planning Process Lacoochee/Trilby Neighborhoods.
How to Find a Water Project for The Community Engineering Corps J. Alan Roberson, P.E.Lindsey Geiger, ENV SP Director of Federal RelationsAssociate Engineer.
Rural Water Projects in Guatemala Water for the Americas Agua para las Américas.
1 Global Water is an international, non-profit, humanitarian organization focused on providing safe water supplies, sanitation & hygiene facilities for.
Fulfilling the Need 1 A modern water supply and distribution system.
Grant Management Seminar 1 District 6540 Grant Management Seminar Doing International Grants.
Building a better world ARTHUR ENNS – DEVELOPMENT DIRECTOR.
Environmental Health Service Learning and Water Quality in Gales Point, Belize International Health and Human Service Learning Program Belize 2009 College.
Implementing the Transportation/Land Use Connection Program
Global Grants Breakout
Global Grant Management Seminar
Johnny François Regional Office Manager, Les Cayes
Session 2-B Applying for and Implementing a Grant
Presentation transcript:

Water for Life Project Apatut, La Union, Philippines

EWB-USA Vision: Our vision is a world in which the communities we serve have the capacity to sustainably meet their basic human needs, and that our members have enriched global perspectives through the innovative professional educational opportunities that the EWB-USA program provides. Mission: EWB-USA supports community-driven development programs worldwide by collaborating with local partners to design and implement sustainable engineering projects, while creating transformative experiences and responsible leaders.

EWB-MAP Established 2006 Rwanda Health and Healing Philadelphia regional chapter Mentor University chapters Local Service Projects Rwanda Health and Healing El Salvador Project FIAT Philippines Water for Life

Apatut – Community Overview Located approximately 200 miles northwest of Manila Approximately 750 residents Approximately 300 students at school Predominantly farming community Large variations in income, water access, and home quality across community

The Problem: Apatut residents obtain water from shallow wells that show high levels of fecal coliform in water quality tests 7 of 8 wells tested show contamination above allowable levels Community members suffering from illnesses associated with poor drinking water quality, such as diarrhea, dysentery and stomachache Access to clean, consistent source of water is not equitable across the community In some cases, wells built immediately adjacent to latrines Manual pumps – up to 12 families, lots are broken Shallow wells – water testing shows contamination Some electric pumps Storage tank creates “indoor plumbing”

EWB-MAP Project Goals Provide clean, potable water at school (primary goal of community) Provide clean, potable water at centralized faucets (Phase 1) and to every house in community (Possible Phase 2) Ensure equitable distribution of clean, potable water throughout the community Get community ‘buy-in’ by incorporating community feedback during design phase and community labor and financial donations during construction phase Facilitate project sustainability by providing financial and operation and maintenance training to Water Cooperative

March 2010 EWB-MAP Assessment Trip Meetings with Water Cooperative members, local Rotary Clubs, St. Louis College, Apatut residents Inspected ‘mountain spring’ – not a spring, ruled out as water source Collected water samples from shallow supply wells and ‘spring’ – shallow wells show contamination Repaired well pumps at school Completed surveying with St. Louis college Walked proposed pipeline run Conducted visual inspection of soils – classified as SM based on Unified Classification System Met with local well driller and local electric company representative Evaluated tank and well sites Completed health surveys Installed solar data collector to evaluate applicability of solar powered system components

Major System Components Well – 120 feet deep Pump – submersible, 5 HP Electric Service – new transformer and service line Tank – 21,000 gallons, concrete block Pipeline – 4,000 feet Tapstands – 3 for community, 1 for school Water Treatment – chlorination and/or sand filtration

Deep Well Well Site Need 26 GPM minimum Pump Testing to be completed after well install Rotary or Hammer drilled Approximately 120 feet deep based on driller estimates Overburden Construction 6” diameter PVC Well to be developed after install

Storage Tank Tank Capacity = 21,000 gallons Tank Site Well site on community land near gazebo Up mountainside behind gazebo is tank site Tank site on privately-owned land donated to project Tank Site

Pipeline and Tapstands 4,000 feet of pipe 2” and 3” PVC Road and stream crossings 3 community tapstands 1 tapstand for the school

Water Treatment Unable to test water until well is drilled Local well drillers believe water will be safe to drink straight from the well Required to disinfect by Philippine government Bag filter and in-line chlorine disinfection

Sustainability Measurements Health: measured via health surveys 2 and 5 years after system completion Goal: Improved health conditions based on original health surveys Water Quantity: measured via flow meters at tank and tapstands Goal 1: Supply sufficient to meet current and future demands Goal 2: Water equitably distributed and used by all residents Water Quality: tested by certified labs Goal: 100% of samples with concentrations below Philippine National Standards for all tested parameters Financial Stability: determined using financial documents from Water Cooperative Goal 1: Water Cooperative able to afford maintenance, repairs, and upgrades Goal 2: Water Cooperative able to successfully and routinely collect fees Technical Stability: determined using repair and maintenance logs in O&M manual Goal 1: Inspection and maintenance conducted on a routine basis Goal 2: No service outages are experienced as a result of poor maintenance

Challenges Obtaining Reliable Information Time Window for Construction During Dry Season Communication with Host Community Permits Funding Keeping all partied engaged and involved through it all!

Timeline/Next Steps 2010 Assessment Trip – Now Final design plans and reports completed and submitted to EWB-USA EWB-USA Technical Advisory Committee review and design approval Secure landowner Memorandum of Agreement Submit for well drilling permit (Sept 2011 permit projection) Continued fundraising efforts Summer 2011 Finalize and submit RI Grant Application (July 1) Continue to refine pricing and coordinate design/construction items October – December 2011 Drill well, perform water testing and confirm well viability as required by EWB-USA and RI.

Timeline/Next Steps (cont.) January 2012 EWB-USA approvals for remainder of Phase 1 Implementation February –April 2012 Remainder of Phase 1 implementation – storage tank, distribution system, tap stands. Post Implementation System monitoring and assessments as required by EWB-USA Planning and implementation of possible Phase 2

Funding Phase 1 Budget: Well Drilling – approx $37k Remainder of Phase 1 Implementation – approx $67k Funding Status: Current account balance - $27.3k Committed funding from Hatboro and Corporate Sponsors to be used in RI grant process – 13k Filling the Gap: RI Matching Grant app to be submitted in July 2011 for further funding. Project is set up on RI website for outside funding Solicit Philadelphia District and clubs to join the effort. EWB-MAP is continuously applying for additional grants. EWB-MAP is planning additional fundraisers for this summer. EWB-MAP travel members getting assistance from employers to defray travel expenses (Baker).