INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8 Petroleum and natural gas industries — Well integrity for the operational phase.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

ISO ESP Systems Task Group Leader, Shauna Noonan
SOGAT 2012 The Shah Gas Development Project
2013 Safety Driven Performance Conference 9-10 October 2013
Transition from Q1- 8th to Q1- 9th edition
Chambers Li API Beijing office
RP 65 and other API Activities on Carbon Capture and Storage Co-authors: R. Sweatman, S. Crookshank. M. Parker, S. Meadows, K. Ritter, B. Bellinger Presented.
1 Safety Instrumented Systems ANGELA E. SUMMERS, PH.D., P.E. SIS-TECH Solutions, LLC We’re Proven-in-Use.
ISO 9001 : 2000.
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Environmental Management Plan. Background Environmental Impact Assessment has made commitments to: –Meet defined standards –Implement defined mitigation.
Hazard Analysis and Critical Control Points
Product Lifecycle Management
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
(H.L.) HAZARD ANALYSIS CRITICAL CONTROL POINTS
Process Safety Management
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
API Subcommittee 17 Industry Standards for Subsea Equipment
Key changes from OHSAS 18001:1999
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Gas Exploration Team Hail 7 Casing Design. Overview Wellbore Schematic Design and load assumptions Design Factors Casing Strings & Connections Details.
Committee on Refinery Equipment 2007 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Laboratory Biorisk Management Standard CWA 15793:2008
9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external.
Basics of OHSAS Occupational Health & Safety Management System
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Centre for Petroleum Production Facilities CPPF SINTEF / MARINTEK / IFE / IRIS / UiS / NTNU In co-operation with the petroleum industry Copyright CPPF.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Food safety Training Course Co-financiado:. Thermopar Bimetallic thermometer Digital Infra-red.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Industry Response - Deepwater Horizon
Progress report Study Group 3.2 SPONSOR Daniel Falabella (Argentina) DEPUTY Mohd Nazmi (Malaysia) S.G. LEADER Abderrahame Taberkokt (Algeria) Mar del Plata.
Proactive leak detection (using infra red techniques)
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
API 11V Task Group 15 November, 2007 Houston, USA.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
19th January 2012 Don Wells (Hess)
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
의료용 S/W 기술문서 심사 방법 원 찬 요 유엘 코리아 발표자 소개 년 2 월 한양대 전자공 졸업 ~ : ㈜ 금성사 ( 현 LG 전자 ) 연구원 ~ : ㈜ 메디슨 규격팀 팀장
Visit us at E mail: Tele:
OHSAS 18001:2007 개요 보건안전경영시스템. 2 OHSAS 18001:2007 개정 목표 ISO 9001:2000 and ISO 14001:2004 과의 통합 고려 Keep the same clauses order and most of the changes.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
The Rotation Sleeve System Triangle Equipment AS in co-operation with Ericsson Saab Avionics AB The EXPRO Group.
20 Principles for Managing Behavioural Safety & Process Safety
PREEV PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION
BEST PRACTICES IN PROCESS SAFETY
UK Link Programme Update to PNUNC August 13th, 2013
Deadlegs not only a hazard in football
HSE Case: Risk Based Approach.
Quality Management Systems – Requirements
Shell Upstream HSE Case, Managing Risk Glen Worobets
H A C C P HAZARD ANALYSIS CRITICAL CONTROL POINTS 1 December 2018
SPE DISTINGUISHED LECTURER SERIES
Fertilizer Industry Safety Information Analysis and Sharing Program
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8 Petroleum and natural gas industries — Well integrity for the operational phase.

Participating Work groups Well integrity management & handover –      Gary Limb (ConocoPhillips) Lead  –      Simon Spark ( Tullow Oil ) –     Nina Ringoen( Centrica ) –      Joe  Anders ( BP ) / Mike Payne BP > replaces Joe  Define well types & risk based monitoring –      Paul Hopmans ( Shell )  ( Iso standard  Convener )  –     Andre Luiz Rocha Alves Petrobras –      Gavin Mundie ( Centrica ) –      Crawford  Hair ( Chevron - Grant Lintern (Woodside) added Well barriers & annular pressure management –      Hilde Brandanger ( Statoil )  –      Alex Crabtree ( Hess ) lead –      Pier Alberto Magarini (Eni ) Well review & test criteria –      Nigel Snow ( Maersk )Lead –      Mike Murrey ( ExxonMobil ) –      Remco  Donders (Total)

Other participants ISO contacts 'edykhuis@ziggo.nl'; 'Ries.Langereis@c-a-m.com‘; Reeve, Neil TN GSNL-PTE/DTST; OGP focal point'Alf.Reidar.Johansen@ogp.org.uk'; Participating companies to review. Petro China Adco / Zadco Abu Dahbi; Petronas Malaysia Billiton Petroleum Development Oman Gazprom Qatar Petroleum

Referenced standards (So far ) API 14 A / B / D/ H API 6 A API 90 Norsok D 10 Iso 17776 Hazard identification Iso 14224 reliability and maintenance data for equipment ISO 31000 risk management

ISO standard content Scope / Definitions /References Well Integrity Management System Organizational Structure Competence Data Management Handover Assessment Well Integrity Assurance Process Performance indicators KpI’s Management of Change Barrier Principle Barrier Principle/Philosophy Barrier Definition (WBE/SCE) Barrier Schematics Barrier Performance Matrix Barrier Reliability/survivability (safety case) ESD/Related Safety Systems Risk management Risk factors and assessment Matrix Corrosion\ Erosion Management Conductor\Structural\Reservoir Compaction Risk Based Maintenance Process   Annulus Pressure Management Annuli Pressure Monitoring Process Definition/Calculation of MAASP/ MAWOP Sustained Pressure Management Integrity assurance Closed in/temporary suspended wells Acceptance criteria / Leak Rates Integrity Fault Mitigation Integrity Deviation/Waver Process Incident/ response planning   Lifecycle management. Well Review/ Health Check Process Life Cycle Extension Abandonment criteria for end of well life

Definition of Well integrity Well integrity process is: Application of technical , operational and organizational solutions to reduce risk of uncontrolled release of well bore fluids through out the life cycle of a well, to avoid harm to people , environment and assets and the required barriers and assurance task in place to prevent this . This well integrity standard addresses the operate phase of the well from well construct hand over to abandonment only.

Team 1 topics ( Gary ) Organisation R&R Information management Well hand over Well design basis Traceability of SCE materials People & competence Procedures Management of change KPI’s metric’s Assessment health check ( system)

Team 2 topics (Paul ) Risk matrix Performance standards Mitigation of faults Emergency response plan Deviation process Reliability process Condition monitoring all wells that are not abandoned Corrosion proposal Nigel Risk based monitoring , inspection & maintenance, flow wetted and non flow wetted components Reservoir compaction assurance task and risk

Team 3 topics (Alex) Barriers Barrier schematic’s matrix Safety systems / ESD ‘s Annular pressure management Methods of monitoring of annular pressure Risk acceptance criteria definition Acceptance criteria table Mitigating measures

Team 4 topics ( Nigel ) Well review process Well review scope Triggers for Well review Well review documentation process Technical health check End of well life review Valve testing & barrier verification Leak rates Block and bleed Barrier verification test Testing methods Function testing Interface seal testing Well head maintenance ( OEM spares definition ) Annular pressure test SCV testing

Timeline plan for development of ISOTC67/SC4M standard 1 st edition 2010 5 – 8 Well integrity for the operational phase I Note: 15 th afternoon after SPE start and continue in Grand Palace Noordwijk hotel, continue on Monday Tuesday in Rijswijk, details to follow.