Optimal Power System Control (OPSC)

Slides:



Advertisements
Similar presentations
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Advertisements

Electrical Engineering Department
CONTROLS OF SUPER CRITICAL BOILERS
Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Advanced Boiler Control for Biomass and Chemical Recovery Boilers
CIMExcel Software Inc. Slide 1 Mineral Processing Operations Simulator (MPOS) MPOS can be used for multiple purposes including, DCS system checkout, tuning,
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
CIMExcel Software Inc. Slide 1 Performance Solutions for the Mineral Processing Industry Advanced Mineral Processing Control (AMPC) Mineral Processing.
CIMExcel Software Inc. Slide 1 Performance Solutions for the Mineral Processing Industry for Pit to Plant Optimization Optimal Mineral Processing Control.
Energy Efficiency and Intelligent Power Plants Rameshbabu R S 10 th May, 2006 The Center For Bits And Atoms MIT.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Advanced Boiler Control for Biomass/Solid Fuel Boilers
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
CIMExcel Software Inc. Slide 1 Advanced Drystock Control (ADC) to reduce the ‘residual’ basis weight, moisture, and caliper profiles CIMExcel Software.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
OPSC CIMExcel Software Inc. Slide 1 Optimal Power System Control (OPSC) Hydroelectric Fossil Biomass/Solid Waste/Cogeneration Nuclear Wind Combined Cycle.
CIMExcel Software Inc. Slide 1 Performance Solutions for the Mineral Processing Industry Optimal Mineral Processing Control (OMPC) Mineral Processing Operations.
CIMExcel Software Inc. Slide 1 Optimal Mineral Processing Control (OMPC) for Pit-to-Plant Optimization.
Bob Green Garland Power and Light
FREQUENCY CONTROL DURING BLACK START OPERATIONS
CIMExcel Software Inc. Slide 1 Advanced Mineral Processing Control (AMPC) Increases Stability and Reduces Variability. Increases Ore Throughput and Metal.
CIMExcel Software Inc. Slide 1 CIMExcel Software Inc. Greg Yorke, Ph.D, P.Eng. Control Systems Engineering Company located in Vancouver Modeling, Simulation,
CIMExcel Software Inc. Slide 1 Advanced Power Plant Control - Hydroelectric For improved stability, improved LFC performance in interconnected or island.
Active Power and Frequency Control
Cihangir Gençoğlu , Joint Transmission System Operator – Utility Regulator Renewable Energy Workshop, Istanbul Integrating Intermittent Renewable.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Three-Phase ac Voltage Generation
POWER GENERATION TECHNOLOGIES
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Frequency Control Turbine Governor Droop NERC Requirement
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
21 st May 2015 SMARTGREENS 2015 Lisbon, Portugal Lane Department of Computer Science and Electrical Engineering West Virginia University Analyzing Multi-Microgrid.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
3/31/20091 Electric Power Grid Performance Presentation by Anthony J Spurgin Independent Consultant San Diego, CA
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
CIMExcel Software Inc. Slide 1 Energy Management System Energy Management System Powerhouse / Cogeneration OptimizationAdvanced Boiler Control Energy -
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
ECE 576 – Power System Dynamics and Stability
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
Banc d’(Bench) Essais pour(Tests for) Régulateurs(Regulators) Turbines et(Turbines) Alternateurs(Alternators)
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Plug-in Vehicles and the Electric Grid Mark Kapner, PE Senior Strategy Planner Austin Energy
Renewables and System Services Ann Scully.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
A Trust Based Distributed Kalman Filtering Approach for Mode Estimation in Power Systems Tao Jiang, Ion Matei and John S. Baras Institute for Systems Research.
ECE 476 Power System Analysis Lecture 15: Power Flow Sensitivities, Economic Dispatch Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Managing Reliability and the Markets with PI
Marc Langevin, eng., Ph.D. Marc Soullière, tech. Jean Bélanger, eng. * A Real-Time Regulator, Turbine and Alternator Test Bench for Ensuring Generators.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Role of Renewable Energy and Implication of RPS in a Sustainable Electric Generation Portfolio NARUC Electricity Committee 2007 Annual Conference New York,
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
Generation: Control & Economic Dispatch 2016 System Operator Seminar.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
7. FREQUENCY CONTROL AND REGULATING RESERVES
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Gas Turbine Power Plant
Black Start Overview.
Grid Integration of Intermittent Resources
Economic Operation of Power Systems
Automatic Generation Control (AGC)
Power House Optimization (PHO)
Presentation transcript:

Optimal Power System Control (OPSC) for improved system stability, optimal AGC performance, and improved tie-line control, in interconnected or island operating mode (continental, area, sub-area, mini/micro grids) Sub-area: BCTC Northern Southern Interior Lower Mainland - Interior Vancouver Island Area: NPCC NB, NS Quebec ME, NH, VT, MA, RI, CT Ontario New York discrete-time model reference control of area frequency and tie-line power provides optimal AGC for participating units integrated with the ISO realtime economic dispatch and contractual inter-area tie-line flows analyzes and schedules the tie-line net export power to maintain stable frequencies restores normal system operation at scheduled tie-line exports after major disturbances OPSC CIMExcel Software Inc. Slide 1 1

Optimal Power System Control monitors the power generation from all power plants, and all tie-line power flows and analyzes the LFC performance of all participating AGC units in the area Hydroelectric Wind Nuclear Fossil Biomass/Solid Waste/Cogeneration Combined Cycle Gas Turbine OPSC CIMExcel Software Inc. Slide 2 2

Power System Dynamics Model The ith area is connected to the jth area by the kth tie-line (m areas and n tie-lines) Mi = inertia of the ith area (s) ωi = frequency of the ith area (pu) Gi = generation of the ith area (pu) D0i = frequency independent load of the ith area (pu) Di = damping factor of the frequency dependent load of the ith area (pu) Ei = net export power from the ith area (pu) Mi d/dt ∆ωi = Gi - D0i - Di ∆ωi - Ei ∆ωi = ωi - ωset Ei = ∑p Tp ( pth tie-line connected to the ith area ) calculate Mi and identify Di from a major disturbance. Formation of multiple internal islands (A,B,C,,, ) with modal area frequencies at the kth discrete-time step: DA ∆ωA(k+1) = (GA0/γAGi0)(GA(k) - D0A(k)) , with modal area frequencies, ∆ωi(k) = αi (GA0DA/Gi0Di) ∆ωA(k) DB ∆ωB(k+1) = (GB0/γBGi0)(GB(k) - D0B(k)), with modal area frequencies, ∆ωi(k) = αi (GB0DB/Gi0Di) ∆ωB(k) DC ∆ωC(k+1) = (GC0/γCGi0)(GC(k) - D0C(k)), with modal area frequencies, ∆ωi(k) = αi (GC0DC/Gi0Di) ∆ωC(k) Net Export Power Flows: Ei (k) = Gi(k) - D0i(k) - (GA0/γAGi0)(GA(k) - D0A(k)) ( ith area net export in the Ath island ) Ei (k) = Gi(k) - D0i(k) - (GB0/γBGi0)(GB(k) - D0B(k)) ( ith area net export in the Bth island ) Ei (k) = Gi(k) - D0i(k) - (GC0/γCGi0)(GC(k) - D0C(k)) ( ith area net export in the Cth island ) Tie-line Power Flows: T = A-1E where A is a r X r matrix (r < s, where s = areas in the internal island). CIMExcel Software Inc. Slide 3 3

Optimal Power System Control for AGC P1set(j) Eset net export (inter-area contracts) OPSC Algorithm Optimal AGC Load Allocation PS(j) + PAGC(j) Piset(j) APPC power mode Pi(j) ωG set - Pmset(j) ωG(j) Enet export(j) pu power setpoints for participating units Filter - Sampler Filter - Sampler l = m+n ~ 10 seconds Spinning Reserve Optimization Modes uniform weighted efficiency weighted-efficiency ∑ Pl(k) l = m+1 ωG(t) Enet export(t) Filter - Sampler Realtime Demand, Import, Export Pm+1(k) ISO Realtime Economic Load Allocation pu power for non-participating units Pl(k) Pm+n(k) ~ 5 minutes ISO Realtime Pricing Time-of-day Scheduling and Spinning Reserve OPSC CIMExcel Software Inc. Slide 4 4

Comparison of the Classic and OPSC Approaches for AGC-LFC Classic Approach General: Control of area frequency and tie-line power 2-4 second update interval Most Power Plants are in Frequency Control Mode Participating AGC units with ‘speeder’ before PID Power Plants do not measure/feedback on power Power Plants do not achieve the AGC setpoint Power Generation Monitoring: None Demand Monitoring: Sometimes used for feedforward Power System Total Power Generation: Not used for AGC Optimal AGC Unit Load Allocation: No Spinning Reserve Considerations Frequency Bias Setting: Tuned each year Integral Control Action: Implicitly with governor ‘speeder’ Economic Dispatch: Integrated with ISO functionality Recovery from Major Disturbances: Generally not used in automatic mode Power System Dynamics Model and Simulator: OPSC Approach General: Control of area frequency and tie-line power 10 second update interval - immediate reset on events Optimal if all Power Plants are in Power Control Mode Participating AGC units with APPC control algorithms Power Plants measure/feedback/feedforward on power Power Plants achieve the AGC setpoint Power Generation Monitoring: Each unit with a Power Generation Observer Demand Monitoring: Not required for OPSC Power System Total Power Generation: Used explicitly for AGC in the OPSC algorithms Optimal AGC Unit Load Allocation: Used in the OPSC algorithms (site/units) with 4 modes 10 second Spinning Reserve Considerations Frequency Bias Setting: Set by desired closed loop response of OPSC algorithm Integral Control Action: Explicitly at the AGC center - with anti-reset windup Economic Dispatch: Integrated with ISO functionality Recovery from Major Disturbances: Used in automatic mode Power System Dynamics Model and Simulator: Power System Simulator for identification, testing, and what-if analysis CIMExcel Software Inc. Slide 5 5

OPSC Performance for a Mini/Micro Grid The generation units for this mini/micro grid include, five 20 MW small hydro units, a 50 MW wind site, a 50 MW biomass cogeneration site, and a 20 MW diesel unit. The demand includes a 100 MW mining site, 50 MW of industrial, and 30 MW of residential. OPSC sends power setpoints to the small hydro units approximately every 10 seconds. The OPSC performance is shown above in response to the significant variations in demand and wind generation. OPSC CIMExcel Software Inc. Slide 6 6

NERC Sub-Area - (Ontario - IESO) Sub-area: BCTC Northern Southern Interior Lower Mainland - Interior Vancouver Island Area: NPCC NB, NS Quebec ME, NH, VT, MA, RI, CT Ontario (IESO) New York The generation capacity of this NERC Sub-Area is approximately 30 GW and includes, Nuclear (10.5 GW) Coal (5.3 GW) Gas (CCGT 4.7 GW) Hydro (7.1 GW) Wind (1.1 GW) Other (2.3 GW) Multiple interconnections with Manitoba, Minnesota, Michigan, New York, and Quebec. The demand varies in the timeframes, 10 seconds, 5 minutes and 24 hours. OPSC CIMExcel Software Inc. Slide 7 7

Optimal AGC Load Allocation - NERC Sub-Area OPSC CIMExcel Software Inc. Slide 8 8

Optimal Power System Control - NERC Sub-Area - AGC Off OPSC CIMExcel Software Inc. Slide 9 9

Optimal Power System Control – NERC Sub-Area - AGC On (Hydroelectric sites on AGC – participating units in efficiency optimization mode) OPSC CIMExcel Software Inc. Slide 10 10

Optimal AGC Load Allocation – Efficiency Mode OPSC CIMExcel Software Inc. Slide 11 11

Optimal Power System Control – NERC Sub-Area (AGC On - Export Trip and Recovery) OPSC CIMExcel Software Inc. Slide 12 12

Optimal Power System Control – NERC Sub-Area (AGC On - Import Trip and Recovery) OPSC CIMExcel Software Inc. Slide 13 13

Optimal Power System Control – NERC Areas Tie-lines CIMExcel Software Inc. Slide 14 14

Optimal Power System Control – NERC Areas Tie-line and Area Export Schedule 3 Internal Islands are formed as a result of tie-line schedule: Internal Island A: ECAR MACC NPCC Internal Island B: MAIN MAPP Internal Island C: ERCOT FRCC SERC SPP WECC CIMExcel Software Inc. Slide 15 15

Optimal Power System Control – NERC Areas stable area frequencies are possible for these scheduled tie-line flows Internal Island A: ECAR MACC NPCC Internal Island B: MAIN MAPP Internal Island C: ERCOT FRCC SERC SPP WECC CIMExcel Software Inc. Slide 16 16

Optimal Power System Control – NERC Tie-lines CIMExcel Software Inc. Slide 17 17

Optimal Power System Control – NERC Areas CIMExcel Software Inc. Slide 18 18

OPSC Analysis and Engineering Services for all Power Plants which participate in AGC for the area (continental, area, sub-area, mini/micro grids) and for all area tie-line power measurement locations, and for the area AGC center. Analysis Data Acquisition System setup, interfacing to PLC and systems. Signal analysis and filtering. Estimation of the parameters for the Power System Model. Analysis of the scheduling algorithm for the area tie-line net export power. Design of the Power Plant AGC-LFC Performance Tests. Testing Testing for the Power Plant AGC-LFC Performance. Baseline Performance monitoring and analysis for interconnected and island operation. Simulator Configuration for the Power System Simulator and the OPSC control algorithms. Comparative Simulation Performance Analysis of existing and OPSC control algorithms. Integration of the Power System Simulator at the area AGC center. Installation of the OPSC software For each AGC Power Plant, install the Power Generation Observer. For each tie-line location, install the Filtering algorithms. At the AGC center, in parallel to the existing AGC algorithms with bumpless transfer. OPSC source code programming and testing. Performance Trials and Acceptance Testing Island Mode - AGC response. Island - Interconnected Transition mode. Interconnected with Scheduled Tie-line Changes. Forced Island Mode. Recovery from Forced Island Mode. CIMExcel Software Inc. Slide 19 19

Advanced Power Plant Control (APPC) for improved stability and improved LFC performance in interconnected or island operating mode using continuous and discrete-time non-linear model reference control technology. Hydroelectric Nuclear Wind Hydraulic Turbine Governor (Kaplan) Pitch Optimization Multi-Turbine Optimization Steam Turbine Governor Boiler Pressure and Mass Reactor Power PWR, BWR, Areva, CANDU, ACR Blade Pitch Multi-Turbine Optimization Fossil Biomass/Solid Waste/Cogeneration Combined Cycle Gas Turbine Steam Turbine Governor Boiler Pressure and Mass Superheater Temperature Combustion Control Burner Management Steam Turbine Governor Boiler Pressure and Mass Multi-Fuel Combustion Multi-Valve Turbine Flow Multi-Steam Header Cogeneration Optimization Steam Turbine Governor Boiler Pressure and Mass Combustor Control Combined Power CIMExcel Software Inc. Slide 20 20

Performance Analysis Toolkit High Speed NI-DAQ Signal Processing and Filtering Time Series Analysis Power Spectral Analysis Fourier Analysis CIMExcel Software Inc. Slide 21 21

Power and Frequency Measurement - Power Generation Observer CIMExcel Software Inc. Slide 22 22