Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting - -23 rd July 2007 – LIGO-G070542-00-Z.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Hiro Yamamoto at LCGT f2f ICRR on September 28 th, 2010 LIGO-G v1 LCGT-G v1 LIGO and LCGT collaboration Hiro Yamamoto / LIGO Lab Based.
Virgo Open Data Plans October 27, 2011 Benoit Mours (LAPP-Annecy) On behalf of the Virgo Collaboration.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
Gravitational Wave Detectors: new eyes for physics and astronomy Gabriela González Department of Physics and Astronomy Louisiana State University.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of Detector Characterization Activities Keith.
LIGO-G W News From Joint Run Planning Committee Roberto Passaquieti & Fred Raab 23May2007.
Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
3/19/08G D S5 Calibration Status Brian O’Reilly For the Calibration Committee LSC March 2008 Brian O’Reilly For the Calibration Committee LSC.
LIGO-G Z Peter Shawhan, for the LIGO Scientific Collaboration APS Meeting April 25, 2006 Search for Gravitational Wave Bursts in Data from the.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
LIGO Scientific Collaboration1 LIGO-G Z S5 Report to the LSC Reported by Vern Sandberg LIGO Scientific Collaboration Meeting March 2006,
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
1 GEO outlook Benno Willke (presented by Bernard Schutz) LSC meeting, MIT Nov 2006.
LIGO-G Z LIGO Scientific Collaboration1 LSC-Virgo Meeting Closeout Session Dave Reitze.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO-G Z LIGO at the start of continuous observation Prospects and Challenges Albert Lazzarini LIGO Scientific Collaboration Presentation at NSF.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
LIGO-G What comes next for LIGO? Planning for the post-detection era in gravitational-wave detectors and astrophysics Gabriela González, Louisiana.
Searching for Gravitational Waves from Binary Inspirals with LIGO Duncan Brown University of Wisconsin-Milwaukee for the LIGO Scientific Collaboration.
Searches for Compact Binary Coalescences in LIGO and Virgo data Gabriela González For the LIGO Scientific Collaboration and the Virgo Collaboration APS.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G M Collaboration With Virgo Gary Sanders LSC Meeting Baton Rouge March, 2001.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
LIGO- G D Experimental Upper Limit from LIGO on the Gravitational Waves from GRB Stan Whitcomb For the LIGO Scientific Collaboration Informal.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G Z DMT Status for UL Analysis K. Riles - University of Michigan 1 DMT Monitors -- Status Update for Upper Limits Analysis.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Detector Characterization Issues -- S2 Analysis & S3 Planning.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Introduction to Detector Characterization Sessions Keith.
LIGO-G ZRai Weiss LSC Session on Scientific Monitoring March 21, 2006 Committee formed by Peter Saulson to: Consider the value and effectiveness.
Peter Shawhan The University of Maryland & The LIGO Scientific Collaboration Penn State CGWP Seminar March 27, 2007 LIGO-G Z Reaching for Gravitational.
LIGO-G Z How to organize the global network? Introduction to a “town meeting” Peter R. Saulson Syracuse University.
LIGO-G Z LIGO Scientific Collaboration1 Welcome to the Hannover L-V Meeting Status of the LSC Dave Reitze University of Florida.
PX444 – The Distant Universe Lecture 13 The History of Star Formation.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G Z LIGO Scientific Collaboration1 LSC-Virgo Meeting Closeout Session Dave Reitze.
LIGO-G Z Report on the S2 RunK. Riles / S. Whitcomb 1 Report on the S2 Run Keith Riles (University of Michigan) Stan Whitcomb (LIGO–Caltech)
LIGO-G Z Searching for gravitational wave bursts with the new global detector network Shourov K. Chatterji INFN Sezioni di Roma / Caltech LIGO.
LIGO-G Z Status of the LIGO-TAMA Joint Bursts Search Patrick Sutton LIGO Laboratory, Caltech, for the LIGO-TAMA Joint Working Group.
GW – the first GW detection ! Is it a start of GW astronomy ? If “yes” then which ? «Счастлив, кто посетил сей мир в его минуты роковые !...» Ф.Тютчев.
Gravitational Wave Data Analysis  GW detectors  Signal processing: preparation  Noise spectral density  Matched filtering  Probability and statistics.
All The future of DC work. GEO DC workshop June Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the.
1 8 th E. Amaldi Conference, New York City, June, 2009 Anand Sengupta California Institute of Technology on behalf of the LSC and Virgo Collaborations.
LIGO R&D1 Proposed Changes in LSC Publication Policy Committee »Jim Hough, Nergis Mavalvala, Dave Reitze, Kip Thorne »Input from Alan Wiseman Charge »to.
July 4 th, 20061/5 Highlights from the LIGO-Virgo F2F Highlights from the LIGO-Virgo F2F and consequences for the DA groups A.Viceré.
Dawn II, July 8, 2016 GaTech Organizing the international community: issues, open questions, opportunities Dave Reitze LIGO Laboratory, Caltech LIGO Laboratory.
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
October 2006, LIGO Hanford Observatory
Igor Yakushin, LIGO Livingston Observatory
Status of Virgo GWDAW Dec 13-16
GEOSS Data Sharing Principles
On Behalf of the LIGO Scientific Collaboration and VIRGO
NA61 news and plans News from other labs/experiments
BUSINESS OWNER MEETING
Jim Hough for the GEO collaboration
Stan Whitcomb LSC meeting Livingston 21 March 2005
Virgo Update – LSC meeting
Stan Whitcomb LSC meeting Hanford 15 August 2005
Searching for GRB-GWB coincidence during LIGO science runs
Planning for the S4 Run Keith Riles (University of Michigan)
Update on Status of LIGO
Presentation transcript:

Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting rd July 2007 – LIGO-G Z

R. Passaquieti - F. Raab: Report From JRPC 2 Join Run Planning Committee (JRPC) Activity ●Committee members and co-chairs appointed by 13Mar07 ●Luncheon meeting in March LSC/VIRGO meeting in Baton Rouge ●Received charge 2Apr07: »Settle the S5-VSR1 joint running coordination »Investigate post-S5 to S6 operating scenarios ●Bi-weekly JRPC telecons: »were held on 13Apr07, 27Apr07, 11May07 and 15June07. »Most run coordination issues has been discussed and settled »Investigations from DAC has been triggered »Progress has been made on scenarios ●1 st plenary session JRPC report by F. Raab in May 21-25May07 LSC/VIRGO meeting in Cascina.

R. Passaquieti - F. Raab: Report From JRPC 3 Consensus on Joint S5/VSR1 Run Coordination ●LIGO has an S5 run coordinator, Vern Sandberg ●Hanford, Livingston and GEO have local run coordinators, which rotate on a schedule determined by each local site ●In Virgo R. Passaquieti act as VSR1 run coordinator ●Virgo is invited to attend the LIGO S5 Run Coordination Telecon, at 19:15 UTC, together with representatives of all LSC working groups and LIGO-Lab and GEO run managers

R. Passaquieti - F. Raab: Report From JRPC 4 Consensus on S5/VSR1 Run Interruptions ●The Virgo “science mode” interruptions schedule, during VSR1, follows the scheme adopted by LIGO: »MAINTENANCE: 4-hr weekly time window. »H1, H2 and L1 synchronize maintenance each Tuesday from 08:00 to 12:00 PT ; »European detectors synchronize each Wednesday from 09:00 to 13:00 CET »Criterion : to optimize coverage »COMMISSIONING: up to 25 hours/month at each site »coordinated by LIGO and Virgo run coordinators »Criterion: to optimize amount of time with 2-3 of the large detectors operating in coincidence, while providing a good degree of coverage

R. Passaquieti - F. Raab: Report From JRPC 5 Consensus on Calibrations & Hardware Injections ●Long time-consuming calibration checks are done as part of “commissioning” time allotment »LIGO & Virgo do not expect to need such calibration time during the 4 months beginning May 18 ●Hardware injections will be done during “science mode”, with appropriate flags recorded; not expecting to consume much integrated time ●Simultaneous hardware injections are highly desired by analysis groups but will not be required before the end of S5 »Virgo requires major modifications to real-time software. »People from the collaboration are interested to know how time sets are checked

R. Passaquieti - F. Raab: Report From JRPC 6 Post-S5 to S6 operating scenarios ●DAC was asked to consider GEO-only coverage »Consensus: triggered GEO-only paper would be publishable only if Supernova is extremely nearby (optimistic estimate: range within about 1kpa, detection efficiency from about a few/thous. to about 30 %) ●A subcommittee was formed to investigate and bring a preliminary recommendation to full committee (R. Adhikari (chair), M. Punturo, K. Riles, A. Vicerè, B. Willke). Subcommittee consensus: »highest priority: enhance rapidly the sensitivities of the largest interferometers. »secondary priority: provide the best coverage possible. »some science/engineering running desired by large detectors in 08. »preliminary schedule developed on this consensus view. »Request to DAC to discuss the significance of any benefits and downsides of delaying the enhancement of one of the larger detectors (see DAC presentation for preliminary results) ●F. Raab, K. Riles and E. Goetz are providing plan to run H2 in astrowatch with students. »Preliminary considerations »A shift schedule of 2 shifts per day, requires 6 students minimum (if no SciMons). »A shift schedule of 1 shift per day, requires 4 students minimum ( if no SciMons).

R. Passaquieti - F. Raab: Report From JRPC 7 Procedure to end S5 ●Significant time required to release detectors after S5 »Required calibration checks »Documentation work »Post-run commissioning ●F. Raab has proposed a planning schedule to LSC Operations Committee (LSC- OC): »end S5 science running with 1 year of triple coincidence by 30Sep07; »use the following three weeks for post-S5 measurements and documentation; »start venting for eLIGO by 4th week of October.

R. Passaquieti - F. Raab: Report From JRPC 8 Latest Predictions for End of 1 Year of Triple Coincidence According to the last projections, by D. Sigg, the 1-yr LIGO triple-coincidence could be potentially achieved by end of September 2007

R. Passaquieti - F. Raab: Report From JRPC 9 Preliminary schedule as presented at 21-25May07 LSC/VIRGO meeting in Cascina (last updates) GEOVirgoH1/L1H2TAMA Summer 07 ? (30Sept07) S5 Join S5 (?) Dec 07runningoffline Astrowatch late 08some short engineering or science runs June 09Start GEO HF work at S6 start start S6 With LIGO start S6 Feb 2011GEO HFAdv VirgoAdv LIGO LCGT R&D Need 1 yr coincident data