Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y1© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Workshop 04.

Slides:



Advertisements
Similar presentations
Participating in the Education for Sustainable Development Innovations Course – for Universities in Africa -
Advertisements

Illinois Transition Planning Institute Facilitator Prep. Webinar Preparing for Your Role as a Team Facilitator: Part I April Mustian, Illinois State University;
Continuous Improvement Professional Learning Community Framework What does it look like? What does it look like? Module Two.
Developing the Learning Contract
Leaders Facilitate Teamwork
Develop an Information Strategy Plan
OUR STRATEGIC PLANNING JOURNEY. The Department of Medicine Strategic Plan  Our roadmap for the future  It will shape and guide what the Department of.
Parents as Partners in Education
Quality, Improvement & Effectiveness Unit
CLAC 2006 Frederick P. Schmitt Teamwork Strategies, Inc “ Effective Teamwork is a Competitive Advantage”
Change with a Purpose Review Session 6 th November 2006.
TRANSFORMING CAPABILITY SUPPORT MATERIALS LEARNING DESIGN Learning Design Development Plan DEVELOPMENT PLAN COMMITMENT: LINE MANAGERS SHOULD: AGREEDREVIEWED.
© American Bar Association Effective Strategic Planning Henry F. White, Jr. Executive Director & Chief Operating Officer American Bar Association 10 th.
Learning and Development Developing leaders and managers
MODULE 4: Planning Improvements to our Group TOOLS Re-scripting Drama 5 Vision Tree 6 This module builds upon all the reflections and lessons learned by.
Hollis Day, MD, MS Susan Meyer, PhD.  Four domains for effective practice outlined in the Interprofessional Education Collaborative’s “Core Competencies.
Welcome to Project High Five: Culture Collaboration Commitment Communication Community.
INTEGRATED LEARNING: STAGE 4 (SECONDARY COGS) Principles and process.
CLAIMING THE FUTURE THE ASSOCIATION OF THE FUTURE.
Exploring Foundational Principle: “Provide assessment and evaluation in mathematics that supports student learning.”
Workshop 01 Discovering Our Interprofessional Teamwork
February 8, 2012 Session 3: Performance Management Systems 1.
Intro to Role of the Coach What Do We Mean By “Coach” What Are Keys To Doing It Well? How Do We Share This Role?
Innovative Schools toolkit
Transition Definition: movement, passage, or change from one position, state, stage, subject, concept, etc., to another change: 
Developing an IS/IT Strategy
Communication Degree Program Outcomes
Washington State Teacher and Principal Evaluation 1.
ISLLC Standard #1 ISLLC Standard #1 Planning School Improvement Name: Planning School Improvement that Ensures Student Success Workshop Facilitator.
ISLLC Standard #2 Implementation
School Leadership Module Preview This PowerPoint provides a sample of School Leadership Module PowerPoint. The actual Overview PowerPoint is 73 slides.
12/9/11 ISP Forum Questions and Answers about the ISP Process Revisions 1.
1 Student Engagement Retreat #3 May 24, Review and Updates First retreat (1/18/11) Inventory of activities Placement of activities on a continuum.
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
1 CCR Conference Summer 2014 Building Capacity of Content Teachers through A Comprehensive Literacy Initiative.
Facilitation Principles and Techniques. 2 The Inside Facilitator Authorized by the Project Champion Invites project team members Announces the facilitator.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
WELCOME GOOD MORNING. Scores are higher than other institutions entering AQIP…a good thing. Institution avg. (4 or 5).
Curriculum Design Workshop [Insert facilitator(s) name here] [Insert workshop date here]
Learning, Engagement, and Responsiveness Faculty of Business Workshop.
Toolkit Spotlight Toolkit: Strategic Launch Template.
Computers in Libraries Computers in Libraries, March 15, 2005 Changing the Landscape Making the Future Library Now!
Developing personal and team effectiveness using IT
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Developing a Framework In Support of a Community of Practice in ABI Jason Newberry, Research Director Tanya Darisi, Senior Researcher
District Leadership Module Preview This PowerPoint provides a sample of the District Leadership Module PowerPoint. The actual Overview PowerPoint is 73.
Organizational Design, Diagnosis, and Development Session 14 The Management of Change.
Workshop 06 – Testing the Interprofessional Care Team ‘Destiny’ ver 16D12M14Y1© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Workshop.
Instructional Leadership Supporting Interventions.
Urban Mathematics Education Leadership Academy Session 2 May , 2009 Irving, TX.
Workshop 02 – Our Teamwork Effectiveness ver 16D12M14Y1© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Workshop 02 Our Teamwork.
Connections and Actions Utilizing coaching skills to enhance mathematics instruction Astrid FossumLee Ann Pruske Laura MalyCynthia Rodriguez MTL Sessions,
Workshop 03 – Ideal Collaborative Team Functioning ver 16D12M14Y1© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Workshop 03 Ideal.
Curriculum Mapping Educating for the Future.
Module 2 From Curriculum to Compelling Learning. 2Module 2. From Curriculum to Compelling Learning Module 2 | Session 1 By the end of the session, you.
The Patient’s Role in the Interprofessional Care Team Orientation The Patient’s Role in the Interprofessional Care Team From the Patient’s Perspective:
MAPS for the Future An Introduction to Person- Centered Planning Katie Shepherd, Fall 2009.
A Template for Stakeholder Dialogue. Purpose To move its students to greater success with college and career readiness and in other state priorities the.
1 Interprofessional Health Care Team Meetings OBJECTIVES: Identify key principles and characteristics of effective interprofessional team meetings Identify.
Middle Managers Workshop 2: Measuring Progress. An opportunity for middle managers… Two linked workshops exploring what it means to implement the Act.
Team Assignment Importance of the assignment Assignment details Team Allocations Presentation details Submission Requirements Feed forward into Assignment.
Planning for Curriculum Framework Implementation.
FORGE AHEAD Program Transformation of Indigenous Primary Healthcare Delivery : Community-driven Innovations and Strategic Scale-up Toolkits Module.
Supported by DHHS/HRSA/BHPr/Division of Nursing Grant#D62HP06858
Workshop Two MDI.
An introduction to middle leadership
Developing your Action Plan
Skill Will Matrix A straight forward technique for analysing how members of a team need to be led and managed to secure their optimum performance within.
BUSINESS AND LEADERSHIP DEVELOPMENT
Pyramid of Purpose Template
Presentation transcript:

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y1© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Workshop 04 Moving the Collaborative Team to a Design

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y2© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Goals 〉 To reflect on the ‘dream’ for team functioning arrived at in Workshop #3 〉 To identify where current practices fit the ‘dream’ 〉 To identify what changes are needed to move the ‘dream’ to a full reality 〉 To assess the fit of the ‘dream’ with patient’s ideal 〉 To explore the roles of team members to achieve the ‘dream’ design 〉 To consider the fit of the ‘design’ into existing organization and service structures 〉 To create a beginning design for the interprofessional patient-centred collaborative practice ‘dream’ within the team

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y3© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Workshop Agenda [ ]Review the ‘dream’ model from Workshop #3 [ ]Group Work: ‘Inventing’/assessing the fit [ ]Sharing group work [ ]Group Work:’ Juggling’ to Achieve Model [ ]Sharing Group Work [ ]Group work: ‘Visualizing’ the Design [ ]Sharing Group Work [ ]Group work: Designing Roles of Team Members [ ]Sharing Group Work [ ]Group Work: The Model’s ‘Fit’ [ ]Sharing Group Work [ ]Reflection/summary/orientation to next session

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y4© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration The Team’s Chosen IPCP Model 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y5© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Moving from ‘Dream’ to ‘Design’ * 〉 Inventing – how could our team work? 〉 Juggling – between what we are used to and what would be our best approaches 〉 Visualizing – if we created our dream design, what would it look like? 〉 Fitting – seeing how our dream design can fit into the service and organization *Cooperrider, D., & Srivastva, S., (2000). Appreciative inquiry in organizational life. In D. Cooperrider, P.E. Sorensen, & D. Whitney (editors). Appreciative inquiry: Rethinking human organization toward a positive theory of change. (Chapter 3). ISBN Retrieved from

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y6© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Inventing 〉 Your interprofessional patient-centred collaborative team ‘dream’ allowed you as a group to invent your new model of teamwork

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y7© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Sharing Visions of the IPCP Model 〉 All small groups are asked to share their vision for what the IPCP model will look like in practice 〉 All participants will consider which aspects of the visions should be retained for depicting how the model will work 〉 Agreed upon vision will be retained for the next stage in the design development.

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y8© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Vision for the IPCP Model in Practice 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y9© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration What Needs to be Juggled? As a group you have considered... 〉 What are your positive teamwork strengths? 〉 Where does your teamwork need to change to fulfill your dream?

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y10© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Juggling Ideas Hence, designing the ‘dream’ requires a ‘juggling’ between these two aspects... Juggling both will move your team to a new height of practice

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y11© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Group Work – Juggling Using your flip chart with your small group: 〉 Discuss what does not need to be changed in your current practice to shift from current practice to the ‘dream’ Note: Ensure that you do not lose the strengths of your current teamwork during this process 〉 Discuss what needs to be enhanced to achieve the vision for the IPCP model 〉 Be prepared to share your work with the total group

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y12© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Sharing Ideas to Arrive at the ‘Dream’ 〉 Share each small group’s set of ideas 〉 Consider which ones are duplicates 〉 Discuss which should be retained as key to the ‘dream’ 〉 Move the others to a ‘parking lot’ for later consideration 〉 Move to an integrated set of ideas for further work on the ‘dream’

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y13© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Strengths and Areas for Enhancement 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y14© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Visualizing the Design 〉 When your dream IPCP practice is present, what will it look like? 〉 What are its components? 〉 How will each team member work? 〉 How will patients and family members work with the team?

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y15© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Small Group Work – Visualizing Use your flip chart and take each of the ‘shared’ integrated ‘dream’ ideas and visualize: 〉 How you would actualize each one within your IP patient-centred collaborative team? 〉 Make any adjustments required to ensure the actions that will be needed reflect all members of the team (including patients/family members) 〉 Ensure your group has explored the actions needed for moving the IPCP model into a design

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y16© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Sharing Actions to Visualize the IPCP Model 〉 A representative from each of the small groups will share its set of actions to achieve the vision 〉 All participants should consider the actions and decide which must be retained and which can be placed in the ‘parking lot’ for now 〉 Finally create a collaborative set of actions to move on to the next decision making stage

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y17© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Actions to Move the IPCP Model Forward 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y18© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Small Group Work – Roles of Team Members Using a new sheet on your flip charts: 〉 Consider the roles (in a general context) of all members of the team (including patients and family members) 〉 To assist you in this work, consider the actions you have identified for the ‘dream’ to move to ‘design’ Return to your worksheets from Workshop #1 & #2 〉 What working relationships need to be integrated? 〉 How will your principles for working with each other be included? 〉 How will collaborative leadership be integrated? 〉 How will disagreements be addressed? 〉 How will work be allocated across the team?

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y19© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration 〉 Create three columns on your flip chart and record: o Column 1 = enter the integration action o Column 2 = what roles need to be considered? o Column 3 = what teamwork strength is already in place to support each action & what needs to be developed? 〉 Be prepared to share work with the total group Small Group Work – Roles of Team Members cont.

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y20© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Sharing Work - Moving Towards Design Elements 〉 Listen to each group’s ideas regarding bringing actions into reality 〉 Choose those that resonate with the ‘dream’ 〉 Save the others in the ‘parking lot’ for future consideration 〉 Review the ideas shared around roles to achieve the actions 〉 Come to agreement on the roles needed

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y21© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration IPCP Team Roles 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y22© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration The Fit Within Other Systems 〉 Your team is but one grouping within your service and organization 〉 The fit can act as a pilot to help meet your organization’s values and strategic plan 〉 Your team can become the ‘IPCP champions’ in the organization

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y23© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Small Group Work – Fitting Using your flip charts: 〉 Take each of the agreed upon actions and and work on what needs to happen to make the actions become a reality Consider three aspects: 〉 What changes are needed at the organization level? 〉 What changes are needed at the service level? 〉 What changes are needed within the team members?

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y24© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Action Adjustments to Fit 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y25© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Where are You Now in Creating Your IPCP ‘Dream’? 〉 Developed a vision to move the IPCP model into action 〉 Determined what roles are needed for all members in the IPCP model 〉 Considered the actions needed to design the IPCP model 〉 Adjusted the action to ensure a ‘fit’ within the organization.

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y26© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Where are You in Creating Your Design for Your IPCP ‘Dream’? 〉 (to be completed)

Workshop 04 – Moving the Collaborative Team to a Design ver 16D12M14Y27© TEAM C – Toolkit to Enhance and Assist Maximizing Team Collaboration Next Workshop: Creating the Destiny – Making it Happen Workshop #5 will 〉 Reflect on what the ‘dream’ design is for the team and create a ‘destiny map’ using actions and roles from Workshop #4 〉 Reflect on how the team members, including patients and family members, will integrate their roles into the destiny steps, plotting the actions and roles along a time trajectory for implementation 〉 Identify what needs to be in place to move each action into performance and consider what resources are available. A strategy will be needed to secure any missing resources 〉 Adjust the destiny map to make it happen within the available fit and consider how the team will know when each destiny step is being practiced Ahead of the next workshop: 〉 Review all work completed to date 〉 Volunteers to create case study templates of composite patients Workshop #5: Creating the Destiny: Making it HappenNext workshop is (date)