Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
Design of Standing-Wave Accelerator Structure
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
High power RF capabilities From Two 50 MW Klystrons Variable iris Variable Delay line length through variable mode converter Gate Valves Two experimental.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Update on SLAC experiments with High Gradient Accelerators and RF Components M.Franzi, V.A. Dolgashev, S. Tantawi June 6, 2016.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
5/24/2001R. D. Ruth, LineDrive, May The High Energy Potential of a Linear Collider R. D. Ruth Stanford Linear Accelerator Center.
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Multi-stage pulse compressor
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
Have a chance to operate your own beam at CERN
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
Testing Infrastructure, Program and Milestones
Shuji Matsumoto Accelerator Lab., KEK
CLIC Klystron based. Updates 2017.
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
SuperB project. Injection scheme design status
CLIC source update CLIC main beam injectors reminder
Electron Source Configuration
Status of the CLIC Injector studies
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
CEPC SRF Parameters (100 km Main Ring)
Presentation transcript:

Test Facilities Sami Tantawi SLAC

Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor, 300 MW peak, powered by two X-band 50 MW klystrons – One 400 ns/200 ns, variable pulse length pulse compressor, 300MW/500 MW peak, powered by 2 X-band 50 MW klystrons – 65 MeV injector with a ~0.3 nC charge/bunch – Shielding enclosure suitable for up to 1 GeV Klystron Test Lab (4 RF stations, 4 modulators, 2 shielding enclosures) RF Stations – ASTA: Stations 6 and 8, two 50 MW klystrons that can be combined and 63ns/132ns/264ns-up to 1.5 us pulse compressor that can produce up to 550 MW at the smallest pulse length and 100 MW at the longest pulse length. Shielding enclosure Two experimental outputs ( can run two experiments at the same time) Second generation RF complements Cost effective testing due to versatility and new design of a gate valve ( original idea by Alexi Gudiev) – Station 4, 50 MW klystron: Dedicated for testing standing wave accelerator structure Has a stand alone shielding enclosure – Station 2, 50 MW klystron Dedicated for pulsed heating testing No sheilding Modulators – Station 1, ~500 kV, ~200 A modulator – Station 13, ~500 kV, ~200 A modulator – Station 3, 500 kV, ~xxx A modulator Radiation Shielding – A shielding enclosure suitable for up to 100 MeV (ASTA Bunker) – A shielding enclosure suitable for up to 5 MeV ( station 4)

Pulsed Heating Experiment Station 2 at the klystron test lab, a dedicated 50 MW Klystron station for material testing Will be retrofitted with a closed cycle cryocooler to be able to perform tests from room temperature to 4.2K Cavity r = 0.98” |E||E| TE 013 -like mode |H||H| Q 0 = ~44,000 (Cu, room temp.) material sample axi s

July 8, 2008SLAC Annual Program ReviewPage 4 Standing-wave Accelerator Structure Testing Dr. Yasuo Higashi and Richard Talley assembling Three-C-SW-A5.65-T4.6-Cu- KEK-#2 The structures are housed inside an a dedicated lead inside box suitable for up to 5 MeV A dedicated station with one 50 MW klystron A shielding enclosure built specially for testing short accelerator structure Very productive due to international participation( SLAC, KEK and frascatti structure testing program.

TE 01 TE 02 TE 01 For NLC/GLC, Use Dual Moded Delay Line to Reduce Delay Line Length in Half

July 8, 2008SLAC Annual Program Review Page 6 The Two-Pack/Dual-Moded SLED-II at NLCTA Combined Klystron Power Output Power (Gain = 3.1) Pulse compressor already tested up to 500 MW Has two X-band 50 MW klystrons Can feed accelerator structures inside the NLCTA enclosure The delay line were retrofitted with a variable mode converter to change the pulse length beween 400 to 200 ns. The input of the delay line have been changed to allow the insertions of active switches. Will be used for active pulse compression experiments during the next half a year, and then will become another station at NLCTA

July 8, 2008SLAC Annual Program ReviewPage 7 ASTA RF system From Two 50 MW Klystrons Variable iris Variable Delay line length through variable mode converter Gate Valves Two experimental stations inside the enclosure, one with compressed pulse and the other without the benefit of the pulse compressor Designed for economical testing of TW, SW accelerator structures, and waveguides. Versatile structure for future applications Will be retrofitted with an electron gun to test gradients within a year Wil find other applications and may be demanded for other applications ( may be not related to high gradient work)

ASTA Pulse Compressor Cold Tests Test with a single mode in the delay line Test with a dual-mode in the delay line ( the Miller cup is tuned for two modes) With input pulse modulation one gets a gain of about 3 at 266 ns and a gain of about 2 at 399 ns

Ultra-Power RF Components Te10 to TE01 Mode converter Overmoded 3dB hybridPhase Shifters TE01 over moded Bend

Vacuum RF Components TE01 mode Pump-out TE01 Gate Valve

ASTA Pulse Compressor Bent overmoded Waveguide

ASTA (Continued) The uncompressed arm has a variable phase shifter and a gate valve The ASTA pulse compressor with variable delay delay-lines( Miller cup)

ASTA Two feeds for the two experimental stations inside the ASTA bunker The ASTA pulse compressor with variable iris

Conclusion TS 2 ( Pulsed Heating station) and TS 4 (Standing wave accelerator structure station) are running regularly and are extremely productive ASTA is being processed, at the moment 150 ns. Next the law lever RF system and feedback system are going to be commissioned. In two weeks, the load and installation of the PETS will take place At the end of November, one part of the transmission line is going to changed Commissioning of Two pack is next

SLAC Two-Beam Test Work in Progress Ron Ruth et. al.

The SLAC Linac Housing

Sector 19, ……, Sector 1 Sectors 2,3,4 Delay loop 300 ns Combiner Ring 600 ns The system have been separated for clarity. The linacs are in the same tunnel. The rings are stacked vertically. A A Drive Beam Accelerator 1 GeV 10 A ~150 structures Drive Beam Decelerator 1 GeV => 0.1 GeV 80 A High Gradient Linac 100 MeV/m, 300m, 30 GeV Linac Klystron Gallery

In the Tunnel Two Beam Looks Relatively Passive Drive Beam Deceleration ( 80 A, 1 GeV – 3MeV/m) Main Beam Acceleration ( 1 A, 8 GeV MV/m) 240 MW/m

Accelerator/Decelerator structures 86 cm  -mode accelerator structure 100 MOhm/m with 50 % efficiency Detuning element TE 01 Transport line ( 200 MW) RF loads 4 Matched inputs 4 3-cell standing-wave decelerator structure

Basic parameters of a possible facility Linac Current 10 A Final energy 1 GeV Drive Beam Accelerator Structure 1 m long Drive Beam gradient 6.8 MV/m Number of structures 160 Drive Beam pulse length 300x8 + extra nsec One delay loop x2 (300 nsec circumference) One combiner ring x4 (600 nsec circumference) Main Beam acceleration gradient 100 MV/m loaded

TBA Delay Loop (300 ns) Drive Beam Accelerator 80 m 15 m TBA Combiner Ring (600 ns) High Gradient Linac– 300 m long 30 GeV Overview of the SLAC Two Beam Test Facility

Current RF Distribution Drive beam structure (1 m) Quadrupole focusing

e+e+ e-e- HER LER Drive Beam Acc. High Gradient Linac Drive Beam Decel. Sectors 2-4

CLIC vs CTF3 Drive beam vs S LAC T wo B eam T est SLAC Two Beam Accelerator CTF3CLICSTBTIssues Energy GeV Stability, emittance Current A Stability, Normalized (geom) emittance  m-rad 100 (0.3)100 (0.02)100 (0.05) Emittance Generation preservation Pulse length ns RF breakdown rate, statistics Train length in linac ss Stability, loading, losses RF Frequency GHz Structure cost optimization Energy extraction % 5090 Decelerator Stability Compression factor 2 x 42 x 3 x 42 x 4 RF combination system effects

Conclusion CTF3 is a key test facility to demonstrate the feasibility of aspects of a two-beam system. – Full beam loading, efficient acceleration – Beam combination with RF deflectors – Initial component designs STBT is required as a “10%” test of a Two-Beam System – Stability of Drive beam Acceleration – Stability of Drive Beam Deceleration – Long pulse Main beam acceleration at high gradient – Emittance preservation and beam loading effects – RF Combination system effects, circumference feedback etc. – A Myriad of different full system effects and problems can be tested SLAC infrastructure and expertise provide a unique venue for the key development and tests which would be required if the world pursues a two-beam accelerator to address physics at a scale extending up to 3 TeV.