1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Advertisements

Microtron,TL1 and Booster Diagnostics Status Hussein AL-MOHAMMAD RF & DI Group SESAME 12 th TAC.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
AWAKE electron source New Electron Source WP at CERN
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Booster and Transport Lines F. Willeke for T. Shaftan 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Instrumentation Progress Om Singh Instrumentation Group Leader ASAC Review – October, 14-15, 2010.
BPM System Status P. Cameron 13 Aug 07. Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status.
1 BROOKHAVEN SCIENCE ASSOCIATES Diagnostics & Instrumentation Om Singh - Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
SESAME TL2 and SR Diagnostics
Report Technical Director Storage-Ring-Installation Completed
Cryomodule test stand at ESS site
Diagnostic & Control Status
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Booster and Transport Lines
LAPP BPM Read-out Electronics
BE-BI Software for LINAC4
XFEL Vacuum System Commissioning
Electron Source Configuration
Beam Current Monitoring with ICT and BPM Electronics
Advanced Research Electron Accelerator Laboratory
Compact linear accelerator FLUTE: status update
Electron Beam Systems ETC and Methodology
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Undulator Cavity BPM System Status
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Electron Beam Systems ETC and Methodology
Breakout Session SC3 – Undulator
LCLS Control System Personnel Linac & BC2 Controls progress
Control System Overview Hamid Shoaee LCLS Control System Manager
Rack installation and local tests for the MEBT Chopper Rack
Isotope Readiness Review Run Plans
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012

2 BROOKHAVEN SCIENCE ASSOCIATES Acknowledgements Om SinghTimur Shaftan Igor PinayevKurt Vetter Bernie KosciukYong Hu Ray FlillerSergei Seletskiy Dick HseuhTony Caracappa Mike Johanson

3 BROOKHAVEN SCIENCE ASSOCIATES Overview  Diagnostics Technical Support for Installation  Diagnostics for Linac To Booster Transport Line  Integration Model of LBT.  Illustration of LBT Diagnostics Part 1 & 2.  Illustration of LINAC BPM / PUE.  Installation of LBT Diagnostics Part 1  Integration of LBT Diagnostics Part 1  Electronics, Racks, Controls Interface  Injector Diagnostics Installation Schedule  Summary / Status

4 BROOKHAVEN SCIENCE ASSOCIATES Diagnostics Technical Support for LBT Installation Group Leader – Om Singh Project Engineer – Dan Padrazo Project Engineer- Bernie Kosciuk Engineer – Bel Bacha Engineer – Tony Caracappa AP – Igor Pinayev AP - Sergei Seletskiy Technical Supervisor- Wayne Rambo Technical Support – Jack Tallent, Chris Danneil, Marshall Maggipinto, Artie Munoz, Al Borelli, Dennis Poshka,George Stenby(MOU), Dave Tupper(JS), Bill Brannigan(JS)

5 BROOKHAVEN SCIENCE ASSOCIATES Diagnostics Supported for (LBT / LINAC) Monitor TypeTotal QTY Part-1 QTY Part-2 QTY ResolutionMeasured Beam Parameter FCT211.6pC/bunchFill Pattern, Bunch Charge ICT211.6pC/trainInjected Bunch Charge, Efficiency BPM- (LA) 1130µBeam Position BPM- (SA) 52330µBeam Position Energy Slit11Beam Energy Spread Flag- LA- (40mm x 90mm) 22OTR-50µ YAG- 30µ Energy Spread, Beam Size, Position Flag-SA- (40mm) 752OTR-50µ YAG- 30µ Beam Size, Position Faraday Cup nC Gross Charge per Train(0-150 Bunches) BPM – (LINAC)5Beam Position

6 BROOKHAVEN SCIENCE ASSOCIATES Integration Model LBT Part 1 & 2 LBTL-Part 1 LBTL-Part 2

7 BROOKHAVEN SCIENCE ASSOCIATES 2 Part 1 Diagnostics Monitor TypePart 1 QtyIdentification BPM-(SA)2LB-P1, LB-P3 BPM-(LA)1LB-P2, Flag-SA5LB-VF1, LB-VF1BD1, LB-VF2BD1, LB-VF3BD1, LB-VF3 Flag-LA2LB-VF2, LB-VF1BD2 FCT1LB-FT1 ICT1LB-IT1 Energy Slit1LB-SL1 Faraday Cup2LB-FC1BD1, LB-FC2BD2 Illustration LBT Diagnostics-Part 1

8 BROOKHAVEN SCIENCE ASSOCIATES Illustration LBT Diagnostics-Part 2 2 Part 2 Diagnostics Monitor TypePart 2 QtyIdentification BPM-(SA)3LB-P4, LB-P5, LB-P6 Flag-SA3LB-VF3, LB-VF4, LB-VF5 FCT1LB-FT2 ICT1LB-IT2

9 BROOKHAVEN SCIENCE ASSOCIATES BPM Supported in LINAC LIN-P1 LIN-P2 LIN-P3 LIN-P4 LIN-P5 LINAC BPM

10 BROOKHAVEN SCIENCE ASSOCIATES LA BPM Assembly SA BPM Assembly LA BPM Chamber- populated w/Button Feed-thru Assembly ( ) TL Button/Feed-thru assembly Pre-Installation Work (LBT-BPM Chamber/PUE) Fixture using single wire test 40mm x 90mm Elliptical

11 BROOKHAVEN SCIENCE ASSOCIATES Pre-Installation Work (Testing Energy Slit/ Flags) Test Rack used for Diagnostics Electronics and Controls. Test Stand using SP-1005 Girder top for SA Flag testing ( ) Energy Slit & LA Flag mounted on Production Version SP-1006 Girder, captured in portable clean room ( )

12 BROOKHAVEN SCIENCE ASSOCIATES Pre-Installation Work (FCT/ICT) In-Flange Bergoz FCT- Cleaned and prepared for install. FCT-CF6”3/ UHV-20:1-H FCT-Test Fixture for Pre test prior to install In-Flange Bergoz ICT – Cleaned and prepared for install. ICT-CF6”-60.4-UHV :1-H Beam Charge Monitor Chassis BCM-IHR Module

13 BROOKHAVEN SCIENCE ASSOCIATES Tunnel Installation Work (LBT Part 1 & 2) LBT Girder Install Part 1( ) LBT Component Install Part 1(1-4-12) LBT Part 2 Diagnostics Cables Pulled ( ) LBT Part 2 ( )

14 BROOKHAVEN SCIENCE ASSOCIATES Cable Description / Specification  LMR-240FR – Low Loss Coax Cable (RF BPM / ICT)  Attenuation  Jacket Diameter.240”  Custom trim to relative timing specification of +/-25pS, with a delta phase specification of Mhz.  LMR-400FR – Low Loss Coax Cable (RF BPM / FC)  Attenuation  Jacket Diameter.400”  LMR-900FR – Low Loss Coax Cable (FCT)  Attenuation  Jacket Diameter.900”  SIO2 – Silicon Dioxide Low Loss Coax Cable (RF BPM)  Attenuation  Jacket Diameter.141”  Semi-Rigged, fired glass hermetically sealed assembly  Commercially fabricated as a straight length and a relative timing specification of +/- 25ps, with a delta phase specification of Mhz

15 BROOKHAVEN SCIENCE ASSOCIATES BPM Cable Work LMR-240FR Cable install ( ) Pneumatic Crimp tool Mobile Cart for Cable Time / Terminate ( ) SIO2 Cable Assembly (1Meter)

16 BROOKHAVEN SCIENCE ASSOCIATES BPM / PUE / PTC Module Installation LINAC PTC Module Install ( ) Patch Panel Interface to PTC for LINAC LBT-P1 BPM SA Chamber Assembly at SP-1002 Girder w/SIO2 Cables Installed LIN-P5 BPM PUE Assembly w/LMR-240FR Cables ( )

17 BROOKHAVEN SCIENCE ASSOCIATES LBT Flags Installation SA Flag Assembly at SP Girder LA Flag Assembly at SP-1006 Girder Tunnel patch panels for flag Pneumatics / PLC / Controls Tunnel patch for Energy Slit / Flag at SP-1006

18 BROOKHAVEN SCIENCE ASSOCIATES LBT Beam Dump / Faraday Cup Install Dump 1 at SP-3000 Girder ( ) Dump 2 at SP-4000 Girder ( )

19 BROOKHAVEN SCIENCE ASSOCIATES LBT Electronics Rack Layout cPCI CPU board cPCI Acqiris digitizer

20 BROOKHAVEN SCIENCE ASSOCIATES PLC Controls for Flags (Rear View) Cable Route into Rack Penetrations (Top View) BPM receiver LINAC (Front View) Diagnostics Electronics / Cable Management (RG-Q) Custom patch Panel /SR for LMR Cables (Top View)

21 BROOKHAVEN SCIENCE ASSOCIATES Injector Diagnostics Installation Schedule

22 BROOKHAVEN SCIENCE ASSOCIATES  Implemented Resources loaded Work Plan  Diagnostics Component Tunnel Installation - Complete  Diagnostics Cable pull, Time, Termination - Complete  Diagnostics Electronics Install in Rack RG-Q1,2,3,4 - Complete  Post installation Diagnostics Sub-System Functional testing - Complete  System testing in progress, expected to be complete Summary / Status