Training Purposes Only JEM SAIBO MAINT 31407 JMU-081195 (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Chemistry safety Part 2.
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
Basic Operations Irizar Bodies
Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Installing the UV Lamp.
Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Refrigerators.
Wet Sprinkler Systems Identifying components of, and inspection and testing procedures.
Training Purposes Only JEM MICROBE-I JMU (Ver. 1.2) 1 Notice : This technical data is furnished on the condition that it will be used by and.
INTRODUCTION TO THE SERVICE RIFLE AND MAINTENANCE 1.
Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Presented by: Sana’a AL-Sulami Teacher assistant Nursing department.
Training Purposes Only JEM SPACE SEED JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by.
ACADs (08-006) Covered Keywords Switchgear, motor control, ground, circuit breaker. Description Supporting Material
Startup Training – TPS3 15. Siemens TPS3 Startup Training 2 Topics Covered  Visual Inspections  Verify environmental requirements are met  TPS3 15.
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Marubot Football League Service Manual.
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
GeneXpert Installation and Xpert MTB/RIF Set-up
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
General Industrial Battery Safety Changing and Charging Storage Batteries (g)  Battery charging installations shall be located in areas designated.
ICE PLUG MONITORING SYSTEM Ice plug is an efficient method of providing isolation on liquid filled (water, heavy water) pipes to perform maintenance and.
Autoclave Machine.
Aerobus Safety & Security Proactive Measures to assure Aerobus passenger and system Safety & Security.
Training Purposes Only JEM FACET JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and disclosed.
Training Purposes Only JEM FPEF OV JMU (Ver. 1.3) 1 JEM FPEF OV Fluid Physics Experiment Facility (FPEF) Overview Notice : This technical.
Trindel Insurance Fund
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Available at: Lesson 3.6 – Program Line Follower in Autonomous Mode Program Line Follower in Autonomous Mode.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
The Bell Camera1 Trainer Training The Bell Camera.
POWER WINDOWS COLUMBIA BASIN COLLEGE Automotive Technology.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
Reliability MANUAL CARTRIDGE UNLOAD Super DLT1 Presented By Quantum Technical Services.
Training Purposes Only JEM MEIS INC JMU (Ver. 1.0) 1 JEM MEIS INC Marangoni Experiment Inc19/20 Notice : This technical data.
Training Purposes Only JEM MS MT INC JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used.
Training Purposes Only JEM CERISE JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Training Purposes Only JEM PLT Support Material JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used.
MAINTENANCE OF VIDEO GAME Competency : Installing of video game.
Training Purposes Only JEM RAD SILK JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
WEAPONS HANDLING PROCEDURES WITH A SERVICE RIFLE 1.
TERMINAL LEARNING OBJECTIVE ACTION: Perform Operator Maintenance CONDITION: Given a COFT, COFT IUH, and classroom instruction STANDARDS: Conduct maintenance.
Mechanical Equipment.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
Lab Safety Symbols Glassware safety Check the condition of glassware before and after using it. Inform your teacher of any broken, chipped, or.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
1 JEM PAYLOADS Off Console Plan Yoshio Toukaku / JAXA Kensuke Teranishi / JAMSS January 31, 2013 Notice : This technical data is furnished on the condition.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
Payload Operations Integration Working Group (POIWG) Increment 31/32 Overview January 24-26, 2011 Charles (Casey) Joyce Robotics.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Tools of the Biologist. In order to observe, discover, and explore, scientists use many different pieces of lab equipment. A.Measuring Length 1. Meter.
Electric Shock and Death during Overhead Crane Entry Bell Installation Grave Accident Case in Manufacturing Sector 교육미디어
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
JAXA Rodent Experiment Requirements Futoshi MATSUNAGA (JAXA IS)
1. Eyepiece – 10x magnification Rotates to move pointer 2. Body Tube – carries image to ocular lens in eyepiece.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
UTH-65A VER. CAUTIONS ! PLEASE USE THE OUTLET PREPARED BY A QUALIFIED SERVICEMAN AND MUST CONFIRM IT BEFORE APPLY[SING AN ELECTRIC CURRENT.
REPAIR DOOR PANEL OR FENDER
LOCKOUT/TAGOUT/VERIFY
The Control of Hazardous Energy (Lockout-Tagout)
The Control of Hazardous Energy (Lockout-Tagout)
Personal Protective Equipment
Presentation transcript:

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA). Saibo Rack Maintenance JEM SAIBO MAINT Instructor:Takashi Yamasaki Toru Mori

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 2 Objectives  Saibo Rack maintenance overview  Key points during Saibo Rack maintenance operations  Saibo Rack Maintenance Operations List two objectives of Saibo Rack maintenance operations Explain which equipment crew must attach to CB before turning on CB UV Lamps to prevent electro magnetic interference. Explain which equipments crew must not touch in CB Operation Chamber to prevent crew exposure to broken glass. Perform Saibo Rack maintenance operations according to ODFs without instructor’s assistance. After this lesson the trainee will be able to:

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 3 Lesson Outline Contents: - Saibo Rack Maintenance Overview - Key Points during CB Maintenance Operations - Key Points during CBEF Maintenance Operations - Appendix Page:

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 4 CBEF Clean Up CBEF Function Checkout CB Activation CB Function Checkout CB Deactivation CB Stow CB Setup :Crew operations :Ground operations LEGEND: :Crew/Ground cooperative operations Saibo Rack Maintenance Overview - Function Checkout - Clean Up Objectives of Saibo Rack maintenance Saibo Rack maintenance operations flow CB Clean Up CB Stow CB Setup Clean CB and Valve Check Video Cable Installation CBEF Activation Canisters Installation Function Checkout CBEF Deactivation Canister Retrieval Video Cable Stow Clean CBEF Incubators Clean Bench Maintenance Operations Cell Biology Experiment Facility Maintenance Operations

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 5 Saibo Rack Maintenance Overview Equipments found in Saibo Rack Maintenance Operations  CB Shield - Prevent Electro Magnetic Interference while UV Lamps are ON. (- Block JEM Cabin lights to make fluorescence observation efficiently.)  CB Relief Valve - Release air in CB Air-tight Chambers if JEM cabin should depressurize.  BZK Wipe - Benzalkonium chloride antiseptic towelettes are alcohol-free wet wipes used for general antiseptic cleansing.  Meas Exp Unit B (CBEF Canister) - Canister is a container of samples and equipments.

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 6 Key Points during CB Maintenance Operations CategoryEquipmentKey Points Crew Safety Excessive EMI Radiation ShieldInstall CB Shield before using UV Lamps to prevent Electro Magnetic Interference. Crew entrapmentAir-tight Chamber When CB is in ‘Stowed Configuration’ fill gaps between the OC and Outer Chassis with Gap Protectors to prevent crew entrapment. Crew Exposure to Broken Glass Operation Chamber Verify no broken glass in Operation Chamber before opening OC front panel. OC Lamp, UV Lamps Do not touch OC Lamp or UV Lamps with bare hand. Oil from hands may cause breakage. Time Critical OperationN/A Dos and Don’tsAir-tight Chamber Pull out/stow Air-tight Chamber slowly at about 10 cm per minute to avoid damage to bellows. OC CameraRaise OC Camera (Lens and Flexible Arm) above the inner plate before stowing the Operation Chamber. Difficulty in OpsN/A Possible Mis-OpsN/A NOTE: Underlined key points have been covered by CB Advanced Training.

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 7 NOTE: Underlined key points have been covered by CBEF Advanced Training. CategoryEquipmentKey Points Crew Safety Electrical ShockSample Tray, Centrifuge Before attaching/detaching the Canisters to/from the Sample Tray/ Centrifuge, turn power to Canister off by switches on the Sample Tray/Centrifuge. Entanglement with rotating device Incubator Unit 1G Verify visually through the Observation Window that the Centrifuge is not rotating before opening the door of the Incubator Unit 1G. CentrifugeWhen attaching/detaching the Canisters to/from the 1G Centrifuge, lock turntable of the Centrifuge. Time Critical OperationN/A Dos and Don’tsIncubator UnitDo NOT touch inside Incubator Unit with bare hand to keep it clean. Sample Tray, Centrifuge Be careful not to pinch fingers when releasing drawer locks of slide rails on Sample Tray/Centrifuge. Difficulty in OpsN/A Possible Mis-OpsN/A Key Points during CBEF Maintenance Operations

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 8 Appendix - CB Gap Protector - CB UV Lamp Illumination - CB Software Modes - CB Schematics - Meas Exp Unit B - Meas Exp Unit B Schematic - Acronyms

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 9 CB Gap Protector

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 10 CB UV Lamp Illumination This is a not real situation. Before turning on UV Lamps, install CB Shield to prevent Electro Magnetic Interference. NOTE:

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 11 Standby Mode Start up Mode Main Startup Mode Standby Mode Main Control Mode Main Environment Set Up UV Sterilization UV Sterilization Mode Adsorption DC DC Gas Processing Mode Ventilation OC OC Ventilation Mode Exhaust OC OC Exhaust Mode Control Mode Adsorption OC OC Gas Processing Mode Microscope Control Telescience Control Telescience Control Mode Microscope Control Mode Microscope Set Up (*1) (*1): Only in Telescience Control Mode, ground commands become enable. CB Software Modes

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 12 CB Schematics

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 13 CB Schematics (Cont’d)

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 14 CB Schematics (Cont’d)

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 15 CB Schematics (Cont’d)

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 16 CB Schematics (Cont’d)

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 17 CB Schematics (Cont’d)

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 18 Meas Exp Unit B

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 19 Meas Exp Unit B Schematics Meas Exp Unit B

Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 20 Acronyms BZK Wipes CB CBEF EMI OC ODF UV Benzalkonium Chloride Antiseptic Towelettes Clean Bench Cell Biology Experiment Facility Electro Magnetic Interference Operation Chamber Operations Data File Ultra Violet