Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.

Slides:



Advertisements
Similar presentations
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Improvements to Project Development and Program Management of New Starts Projects FY 2008 Proposed Effective April 30, 2006.
Chapter 2 Analyzing the Business Case.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Corps of Engineers BUILDING STRONG ® Dam Safety Modification Studies Robert Taylor, P.E. Dam Safety Program Manager Great Lakes and Ohio River Division.
Systems Analysis and Design 9th Edition
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Engineer Circular Requests to Alter USACE Projects
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
Module 5 Civil Works Orientation Course - FY 11. Civil Works Project Delivery Process Step 10 Division Engineer's Transmittal Letter Step 6 Negotiate.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
2014 Work Planning Local Program Leadership Team.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Civil Works Orientation Course - FY 11. Objectives: This module will discuss: District Quality Control (DQC) Agency Technical Review (ATR) Independent.
SMART Feasibility Study Process
Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement Civil Works Orientation Course - FY 11.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Value Engineering at FHWA
Module 10 Step 3 Initial Study Funding (incl. Civil Works Budget Process) Civil Works Orientation Course - FY 11.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
1 CERP – PDT WORKSHOP COMPREHENSIVE EVERGLADES RESTORATION PLAN April 2002 Project Implementation Reports.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Module 29 Interagency & International Support Program Civil Works Orientation Course - FY 11.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Water Supply Planning Initiative State Water Commission November 22, 2004.
US Army Corps of Engineers BUILDING STRONG ® PLANNING GUIDANCE Planning Principles & Procedures – FY11.
Communication 2 Report Writing.
1 Lifecycle Management Work Group A briefing on Work Group progress by Wendy Blake-Coleman US EPA.
Civil Works Transformation Foundations of SMART Planning
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
Module 20 STEP 10 Division Engineer’s Transmittal Letter
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
US Army Corps of Engineers BUILDING STRONG ® Planning Products & Milestones Planning Principles & Procedures – FY11.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
What Can Possibly Go In The Civil Works Process? Module 28 Civil Works Orientation Course - FY 11.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Request to Alter USACE Projects
BUILDING STRONG ® TELLING THE PLANNING STORY Planning Principles & Procedures – FY11.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® SMART PLANNING TO SUPPORT FLOOD RISK MANAGEMENT USACE Flood Risk Management and Silver Jackets.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
RECOVER PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® PCoP Webinar Series Section 7001: Preparing the 2017 Annual Report to Congress on Future Water.
Contracting for Evaluation Products and Services by James B. Bell
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Strengthening the Medical Device Clinical Trial Enterprise
TEXAS NODAL (ERCOT REVISIONS)
STUDY TITLE Presenter Name Presenter Title Duty Location
Module 8: Effective Innovation Review and Selection Process
Implementation Strategy July 2002
Contracting by Negotiation Process Map – Part 15 (1 of 3)
Revolutionize USACE Civil Works
Engineering Processes
Right of Way Certification
Presentation transcript:

Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11

Objective: — Writing the report — The basic components of a report — The key parts of a report — Who reads your report — Understand the key decision meetings: – Alternative Formulation Briefing (AFB) – Feasibility Review Conference (FRC)(if (when necessary) – Other In Progress Reviews (IPR) and/or Issue Resolution Conferences (IRC)

REFERENCES Principles & Guidelines –Section VII - Displays General Content and Format ER Chapter 4, Appendix G Planning Manual - Chapter 14

ER EXHIBIT G-5 FEASIBILITY REPORT CONTENT 1. Study Authority. 2. Study Purpose and Scope. 3. Concise Discussion of Prior Studies, Reports and Existing Water Projects. 4. Plan Formulation. 5. Description of the Selected Plan. 6. Plan Implementation. 7. Summary of Coordination, Public Views and Comments. 8. Recommendations.

Sponsor(s) Public Stakeholders (For and Against) Congress HQ USACE ASA(CW) OMB WHO’S YOUR AUDIENCE?

WHAT ARE THE CHARACTERISTICS OF A GREAT REPORT? Easy to read –Plain language –Map and graphics TELL A GOOD STORY –Beginning, middle, end –Chronology Complete and concise-not verbose

HOW LONG SHOULD THE FEASIBILITY REPORT BE? _____ 0-25 pages. _____ pages. _____ pages _____ more than 100 pages?

THE REPORT AS A DIARY Document your process as it occurs, not after the fact. Prepare the report as you go.

Key Decision Meetings — FSM – Feasibility Scoping Meeting (Previously Discussed – Module 14 ) — AFB – Alternative Formulation Briefing — IRC – Issue Resolution Conference — IPR – In Progress Reviews — FRC – Feasibility Review Conference

Alternative Formulation Briefing (AFB) — Earlier Washington involvement than FRC — Permit early release of draft report — AFB is mandatory — AFB after alternatives are evaluated and tentatively selected plan identified — ER Appendix G describes required pre-conference documentation

AFB Participants — OASA(CW) (occasionally) — HQUSACE — Division ( Facilitates AFB) — District Study Team and ATR Team — Non-Federal Sponsor — Independent External Peer Review Team (when applicable) — Federal and/or State Resource Agencies — Stakeholders — Congressional Representatives (occasionally)

When to hold an AFB — District has identified the recommended alternative — Costs and benefits estimated — Mitigation plans and costs developed — Real Estate requirements estimated — Technical review - up to date documentation — Bottom line --- District is seeking Vertical Team review & buy-in — District can request approval to release the draft feasibility report to the public concurrent with HQ review of draft report

Benefits of AFB — Ensure project is formulated consistent with policy — Major issues are addressed prior to release of draft feasibility report — AFB Guidance (PGM) issued by RIT (within 15 days of AFB) — Full vertical team concurrence on selected plan — Advance approval for release of the draft feasibility report for public review

Meeting Results — Project Guidance Memorandum: – Identify technical requirements to produce a successful feasibility report – Clarifies policy issues and provides guidance on the way forward for resolution – Agreement on project cost sharing – Agreement on project specific terms of local cooperation

Feasibility Review Conference — Few and far between — Needed only for unresolved issues arising from review of the draft feasibility report after the AFB

In Progress Review (IPR) Issue Resolution Conference (IRC) — Can be held whenever appropriate: – Progress briefings on large studies – For critical or controversial decisions – Other circumstances as needed

Project Management Plan (PMP) - Phase II (PED/Construction) — Understanding among Customer, District, Division and HQUSACE — Internal District Contract — Reduces Uncertainties — Provides a basis for managing delivery of the project during PED, P&S, RE Acquisition, & Construction

Project Management Plan — Establish scope, schedule, and budget — Identifies Interface with Customer — Technical Performance Required — Quality and Management Controls — Approved by District or Division — Not Required to be submitted to HQUSACE

Completion of the Feasibility Report Key Actions Completed Prior to Submittal of the Final Feasibility Report - ATR Documentation - Alternative Formulation Briefing and/or Feasibility Review Conference - Project Guidance Memorandum Compliance Documentation - Project Management Plan for PED & Construction - NEPA and Public Review Conducted

— Final Feasibility Report — NEPA Documentation — Mitigation Plan (if needed) — M-CACES for Recommended Plan — PGM Compliance Memorandum — ATR Certification and Documentation — Non-Federal Sponsor’s Self-Certification of Financial and Real Estate Acquisition Capability — Feasibility Report Summary — Legal Review Certification Final Feasibility Report Submission to Division