Ismar The NEAREST Consortium Agreement Nearest Kick-off meeting Bologna, 11 October 2006.

Slides:



Advertisements
Similar presentations
Characteristics of projects in EU research programmes
Advertisements

IP rights in FP7 PROTECT Study Visit 10th June 2008 (Alicante) IPR-Helpdesk is a constituent part of the IP-BASE project which is financed by the CIP Programme,
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
NORDRESS Consortium Agreement highlights. All participating institutions have signed the CA This presentation gives a brief overview of the main items.
 Presented by Debra A. Pippen-Johnson 1.  In this session we will discuss the Authority’s administrative responsibilities related to a family’s move.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
FP7 Model Consortium Agreements Warsaw, 12 th December 2007 Willem Wolters, Universities Team of Experts (UNITE) and Wageningen International Helpdesk.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
Management Structure and Responsibilities SUST-RUS
Training & research for academic newcomers A project of the King Baudouin Foundation © 2013 Gabriella Calderari1.
Advanced Grid Research Workshops through European and Asian Co-operation Intellectual Property Rights in EC projects Bruno Le Dantec
EU: Bilateral Agreements of Member States
EU: Bilateral Agreements of Member States. Formerly concluded international agreements of Member States with third countries Article 351 TFEU The rights.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Oficina AproTECH de AETIC: Información y asesoramiento en la preparación de propuestas de I+D+I FP7: Project Management issues, Roles and.
Cern.ch/knowledgetransfer. Knowledge Transfer | Accelerating Innovation Charlyne Rabe CONTRACTS FOR TECHNOLOGY TRANSFER Charlyne RABE KT Legal Advisor.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Mexico - April 15, Intellectual Property Rights in EC projects Katerina Tsakona FORTH Bruno Le Dantec GEIE ERCIM
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
INDUSTRYLINK Workshop Poznan, 23 May 2005 Ingrid Ciabatti TECNOTESSILE EXPERIENCE OF PROJECT REALISATION.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
Laurence DUMOULIN LEGAL TEAM , a v e n u e V i c t o r H U G O L L U X E M B O U R G Tel. (+352) Fax (+352)
October 25, 2005, Pathways to successful EU- research projects Pathways to successful EU- research projects – workshop based on experience.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Contracts FP6. PRESENTATION OUTLINE è Legal Framework è Participation è Contract Structure è Collective Approach l signature and entry into force l collective.
1 WIPO – Geneva – April 2005 European Commission – Research DG D. Dambois European Patent Attorney IPR disputes in international.
Bent Egebart - Corsortium agreements The Commission demand it, but do not check it (?) The Community is not a party to these agreements.
International Trade Regulations: the Law of the WTO Professor Mohammad F. A. Nsour Class 3 1.
NOV-3733-SL-9316 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
© 2004 The IPR-Helpdesk is a project of the European Commission DG Enterprise, co-financed within the fifth framework programme of the European Community.
Volvox The EC Contract Angela Pettit – Contracts Officer.
Intellectual Property Rights Economy and Ownership of Results in IST Projects The Research Council of Norway Niels Peter Thorshaug.
Participation and dissemination Rules and Contracts FP6.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
EGEE is a project funded by the European Union Overview of contract and FP6 procedures Fotis Karayannis EGEE SEE Fed. Representative in PMB, GRNET Zoi.
Megan Richards 6FP - Contract 18 March 2003 Sixth Framework Programme CONTRACTS.
Megan RichardsHeysel 6FP launch conference 11,12, 13 November /11/2002 Rules for Participation and contractual issues for Integrated Projects in.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
© 2004 The IPR-Helpdesk is a project of the European Commission DG Enterprise, co-financed within the fifth framework programme of the European Community.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
HORIZON 2020 Amendments to the Grant Agreement. Consequences The amended provisions become an integral part of the GA All other provisions remain unchanged.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
1 Details of the Sword Contract Kick-off meeting Autonomous Province of Trento Trento, December 18-19, 2014 SWORD (School and WOrk-Related Dual learning)
Article 4 [Obligations of Applicant] 4.1. As a sole and exclusive owner of the Application, Applicant warrants that.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
Dispute Resolution Between ICT Service Providers in Saudi Arabia
Administration of a FIDIC Contract - Project Control
Updating the Regulation for the JINR Programme Advisory Committees
WP1 - Consortium coordination and management
National Contact Points (NCP) Training
Agenda 5.11 General Regulations
SPCs and the unitary patent package
Institutional changes The role of Bilateral Oversight Boards
INTELLECTUAL PROPERTY RIGHTS (IPR) IN FP7
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Financial and Administrative presentation on PARTICULATES project
European Company Law Dorota Wieczorkowska
Presentation transcript:

Ismar The NEAREST Consortium Agreement Nearest Kick-off meeting Bologna, 11 October 2006

Ismar What is the Consortium Agreement (CA) The CA is an agreement made between the project partners (the Contractors) to cover any aspect necessary for a smooth consortium management and an effective implementation of the project, including intellectual property provision. The CA must comply with the rules of the EC Contract The EC is not a party to the CA and plays no active role in the choices made by the Parties of the clauses they deem appropriate to the purpose of their collaboration and interests The conclusion of a CA is mandatory under the FP6 (with few exceptions)

Ismar Purpose of the NEAREST CA The purpose of this Consortium Agreement is to facilitate the fulfilment of the research work and related services and activities allocated to the Parties under the Contract (and as described in more detail in Contract, Annex I) by setting forth the terms and conditions pursuant to which the Parties agreed to function and cooperate in the performance of their respective tasks under the Contract.

Ismar Main Contents of the CA Purpose, nature and duration of the agreement Management Structure Responsibilities and Authority Financial and payment provision Confidentiality clauses Liabilities clauses Intellectual Property Rights Publication, press release Accession and Termination

Ismar Management Structure Steering Commettee Coordinator Advisory Board

Ismar Steering Committee Steering Committee is the supervisory body for the project execution and decision making body in all relevant project matters The Steering Committee shall be responsible for: (a)supporting the Co-ordinator in fulfilling obligations towards the Commission, (b)co-ordinating the research teams, allocating specific responsibilities for each project tasks execution, so that all work meets functional requirements, (c)decide in disputes between the Parties concerning Intellectual Property Rights, (d)providing Project management in relation to the activities of the Advisory Board on technical, and/or exploitation/ dissemination issues, as applicable, (e)agreeing on press releases and joint publications by the Parties with regard to the Project, (f)agreeing on procedures and policies for Dissemination of Knowledge from the Project which is not to be used by the Parties, (g)checking the progress of the works on a six-monthly basis by assessing the intermediary reports by the Parties, and (h)advising and directing the Parties on the developments necessary for the Project

Ismar Advisory Board The Advisory Board is a body set up by the Steering Committee to deal with specific issues related to Technology or Scientific problems, including Exploitation or Dissemination matters. In particular the Advisory Board will advise on the adequacy of the developments of NEAREST and its experiments at sea with respect to the past experience and policy of mitigation of geo-hazard under construction in Europe. The Advisory Board will be composed by at least 3 well-known experts, selected among those initially identified during the project kick-off meeting. The Steering Committee has the power to modify the Advisory Board composition.

Ismar Meetings The Steering Committee shall meet at least half-yearly in principle at the request of its chairperson or at the request of a quarter (¼) of the Parties. Extraordinary meetings may be called at any other time at the request of its chairperson or at the request of a quarter (¼) of the Parties ( ¼ means 3 out of 11 partner). Ordinary and extraordinary meetings of the Steering Committee shall constitute a quorum if more than two third ( ⅔ ) of the Parties are present or duly represented by proxy. ( 2/3 means 7 out of 11 partner) The Steering Committee may take decisions through its chairperson consulting with all members via teleconference and/or via , phone, etc. These decisions must be ratified by an ordinary meeting and shall be made available to all Parties. The Advisory Board meetings will be arranged on occurrence of Steering Committee meetings. In principals an Advisory Board meeting will take place once a year

Ismar Rules of Voting In the cases of definition, allocation of tasks and changes in work sharing relevant budget review matters, the structure and restructuring of the Project, the alteration of the Consortium Agreement, and the premature completion/ termination of the Project. Decisions of the Steering Committe need a two third ( ⅔ ) majority of all Parties, ( 2/3 means 7 parties) In the cases of making proposals to the Parties (other than the Defaulting Party) to serve notices on a Defaulting Party and to assign the Defaulting Party's tasks to specific entity(ies) (preferably chosen from the remaining Parties). the exclusion of Parties and the acceptance of new parties. decisions shall be taken unanimously by all of the non-Defaulting Parties. In all other cases decisions will be taken by the majority vote of the Parties present or duly represented by proxy.

Ismar Rules of Voting (Article5.2.5) A Party may only issue its veto in the case of a decision to accept a new party in the Consortium if a substantial threat to its commercial or strategic interests is likely to exist which cannot be resolved by any other measure, or in case that any decision of the Steering Committee may substantially affect its allocated tasks or costs..( ADDITION in blue colour NOTAPPROVED) In reaching an amicable agreement the views of the concerned Party shall be taken into consideration.( ADDITION in blue colour APPROVED) CSIC proposes to delete this sentence: A veto may be overruled by the Steering Committee by unanimous vote of all the non-objecting Parties as far as these Parties represent more than two third ( ⅔ ) of all Parties. DELETE NOT APPROVED

Ismar Payment (Article 6.2) The Co-ordinator shall receive all payments made by the Commission. Except for the part of the advance payments withheld for the Common Liability Reserve (if any), the Co-ordinator will transfer, in accordance with the Contract and the budget allocation decided by the Steering Committee, the appropriate sums to the respective Parties without unjustified delay, from the receipt thereof from the Commission. The Co-ordinator shall notify each Party promptly of the date and amount transferred to its respective bank account, as listed in Annex C, and shall give the relevant references. Banking transaction costs related to handling of any financial resource shall be borne by the receiving Party APPROVED

Ismar Specific Authorisation of the Co-ordinator (Article5.3.4) (a)To the extent that serious concerns regarding the financial soundness of one or several Parties exist, the Co-ordinator has the authority to require the appropriate letter of comfort (except to Public bodies) to prove that the corresponding Party is able to fulfil the financial obligations with regard to the Contract and this Consortium Agreement. Until this is provided, the Co-ordinator is entitled to refuse the disbursement of the financial contributions of the Commission to this Party. (b) Furthermore, the Co-ordinator has the right to retain any payment if a Party is late in submitting or refuses to provide deliverables as defined in Section 4.3 of the Consortium Agreement and Contract, Annex II.7. ADDITION in blue colour APPROVED

Ismar Application for a Patent (Article ) In respect of a country either specified by the Commission or agreed upon by the Parties, a Party shall notify the other Parties (via the Co-ordinator, if this is practical) if it does not intend to seek adequate and effective protection (as required by the Contract) of certain of its Knowledge from the Project or if that Party intends to waive such protection. If another Party (or Parties) informs the notifying Party in writing within one calendar month of such notice that it wishes to obtain or maintain such protection, the notifying Party shall assign to such other Party(ies) all necessary rights which it owns. The terms of such assignment shall be negotiated among the Parties concerned ADDITION in blue colour APPROVED Such assignment shall ensure that the Access-rights of all Parties will be unaffected. For the avoidance of doubt, the Party which assigned its rights shall have at least the same Access-rights as the non-involved Parties.

Ismar Entitlement for execution of the Project( Article ) After conclusion of an agreement in accordance with Contract, Annex II.35, the receiving Party is entitled to Use the Pre-existing Know-how, Knowledge or Software for performing the Project work. CSIC proposes to delete the following sentence: If a Party applies Pre-existing Know-how of another Party without the grant of access, a penalty will be decided by the IPR-Council on a case by case basis depending on the value of the infringed rights. DELETION APPROVED

Ismar Procedure (Article 12.2) CSIC proposes to modify the following sentence in this way : If a dispute regarding a publication cannot be settled amicably within two (2) calendar months the Project Coordinator_ Steering Committee shall decide the issue within a month from the date on which the dispute has been referred to the Steering Committee. Should any member of the Steering Committee be involved in the dispute, it shall refrain from participating in the final decision. The Parties agree to be bound by the final decision issued by the Steering Committee. MODIFICATION APPROVED

Ismar Publication to qualify for a degree (Article 12.4) CSIC proposes to modify the following paragraph in this way : Where a person carrying out work on the Project on behalf of a Party (the "Relevant Party") needs to include Pre-existing Know-how or Knowledge of another Party in a publication to qualify for a degree, approval for Use shall be obtained from the appropriate Party owning such rights or affected by the Use. To ensure that the planned date of publication can be met the approval of the relevant parties shall be sought at least three _ two (2) months before the latest date on which (pursuant to the qualification procedures) the contents of the planned publication can be altered. However, except as stated below, no such publication will be made under the above procedure - (i)without a majority agreement of the Parties and (ii)provided no Party who would be adversely affected by the publication has vetoed such publication. ALL MODIFICATIONs APPROVED

Ismar Parts to be validated Parts whose conten has to be to confirmed Annex A Recipients of Notice ( data updated) Annex B Banks details Parts to be filled in ( if necessary) Annex C Exclusion of Pre-existing know-how from Right Access Decision:No exclusion of Pre-existing know-how from Right Access to be considered at the beginning of the project Annex C deleted

Ismar Signature procedures The last version of the documents with all modifications agreed will be sent by the Coordinator to all “recipients of notice” as soon as it will be ready, in pdf format. Each Party will print 12 copies of the its respective page containing the “Declaration of Accession to the NEAREST Consortium Agreement” Each copy of the “delacaration page” has to be signed in original by the authorised person within the organization ( already indicated in the form and in the cover page of the CA. A date and a stamp or seal has also to be put on each signed doc All the 12 signed copy has to be sent by courier to the Coordinator (ISMAR-CNR Via Gobetti, 101- I Bologna, ITALY) The coordinator will collect all documents and will prepare 12 copies (each containing the signatures all the 11 Parties). Each Party will receive by courier one complete signed copy of the CA. The 12th copy will be sent to the European Commission