Company Confidential Registration Management Committee Counterfeit Parts Jason Dickstein, General Counsel Aviation Suppliers Association What Does “Counterfeit”

Slides:



Advertisements
Similar presentations
Company Confidential Registration Management Committee (RMC) 1 Roles & Responsibilities San Diego, California January 20, 2011 R. Darrell Taylor Raytheon.
Advertisements

Company Confidential Registration Management Committee 1 AS9110 Alignment to Federal Aviation Regulations (FARs) and Original Equipment Manufacturers(OEMs)
Environmental Management System (EMS)
1 NDAA 2012 Section 818 Further Implementation for Trusted Suppliers March 27, 2014 Fred Schipp Naval Surface Warfare Center, Crane Division
1 “APPROVED PARTS” PRESENTED BY DON E. GARDNER AVIATION SAFETY INSPECTOR CHARLOTTE FSDO #33 (704)
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
Company Confidential Registration Management Committee AS9104/1 Impacts to CB’s & Organizations Bob Cruse, ANAB Vince May, ANAB Tim Lee, The Boeing Company.
Registration Management Committee (RMC) Other Party (OP) Assessor AS9104/2 - Oversight Training January 24, 2008 – Phoenix, Arizona Roles and Responsibilities.
Company Confidential Registration Management Committee (RMC) 1 Other Party Management Team (OPMT) Resolutions Stanley Faust Spirit AeroSystems Other Party.
Company Confidential Registration Management Committee 1 Bogus Certifications Tim Lee Chair IAQG OPMT The Boeing Company Date: July 16, 2014.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
AAQG Sector Report William SchmiegeOctober 11, 2013.
RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee 2012 RMC Auditor Workshop Minneapolis, MN Revised 7/17/12.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Quality Management System
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Prepared by: Tim Lee – Chair IAQG OPMT The Boeing Company October 10, 2013 International Aerospace Quality Group (IAQG) Other Party Management Team (OPMT)
Registration Management Committee (RMC) Auditor Training and Workshop Minneapolis, MN July 30-31, 2009WELCOME! Americas Aerospace Quality Group AAQG Registration.
Company Confidential Registration Management Committee (RMC) OP Assessors Need to Know 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
AS9104/3 AUDITOR REQUIREMENTS - WHAT HAS CHANGED?
DoD Public Meeting: Detection and Avoidance of Counterfeit Electronic Parts Storme Street Director, Government Relations, Policy BAE Systems, Inc. March.
Company Confidential Registration Management Committee 1 Auditing the Implementation of Counterfeit Electronic Parts Control Plan Requirements Bill Zint,
Company Confidential Registration Management Committee (RMC) The OP Assessor Process San Diego, CA January 19, 2012 Melvin L. Jeppson ATK Propulsion Systems.
The OP Assessor Process
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures - Client and CB Agreement July 17, 2014 Tim Lee Chair - IAQG.
FDA Regulatory review in Minutes: What Product Development Executives Need-to-Know. Specifically, frequent causes of recalls and related areas that investigators.
Company Confidential Registration Management Committee (RMC) & Auditor Workshop 11 ‘Top Ten’ Things Auditors Should Know About 9104/1 Boston, MA July 22,
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential Registration Management Committee (RMC) What’s Next for Oversight? 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
MARPA and You Working Together to Make PMA Successful March 31, 2011 Gorham Conference 1 Modification and Replacement Parts Association (MARPA)
Company Confidential Registration Management Committee (RMC) & Auditor Workshop 11 ‘Top Ten’ Things Auditors Should Know About 9104/1 OP Assessor Workshop.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
Company Confidential Registration Management Committee (RMC) 1 NASA’s Joint Audit Planning Committee (JAPC) Complements Other Party Audits Atlanta, GA.
1 DPCP Internal Auditor Basic Training Internal Audit Procedures.
1 SAE AIR5359A Requirements for Registration of Quality Systems to AS9100 Nik Sutton Boeing IDS This briefing contains non technical data reviewed by Export.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Company Confidential Registration Management Committee 1 Industry Controlled Other Party (ICOP) Oversight Market Surveillance AS9104/2A Supplemental Oversight.
Company Confidential Registration Management Committee (RMC) Audit Calc Program Palm Beach, Florida January 16, 2014 Tim Lee The Boeing Company.
Company Confidential 1 JAPC Update Buck Crenshaw, JAPC Deputy –Chairman Tony Gutierrez, JAPC Manager 20 January 2010.
Page 1/18 October 15, 2004Beijing General Assembly Forum IAQG Expectations Kinsuke Hara Director - Quality Mitsubishi Heavy Industries, Ltd Nagoya Aerospace.
31-May-16 chart 1 International Aerospace Quality Group Registrar Management Schemes SEPTEMBER 2002 Barb O'Dell.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
RMC Workshop Long Beach, CA 16 – 17 July 2014 Registration Management Committee Agenda.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
Registration Management Committee (RMC) Aerospace Auditor Workshop July 30 – 31, 2009 Minneapolis, MN AAQG RMC 101 Industry Controlled Other Party Structure.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
AAQG Sector Report William SchmiegeOctober 10, 2013.
Company Confidential Registration Management Committee International Aerospace Quality Group Other Party Management Team (OPMT) Wichita State University.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July 2015 The OASIS Feedback Process Empowering Communication.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures July 22, 2015 Tim Lee Chair - IAQG OPMT The Boeing Company RMC.
Company Confidential Registration Management Committee (RMC) 1 Sanctioned Training – The Training Provider Approval Body Perspective Atlanta, GA July 23,
Registration Management Committee (RMC) Other Party Assessor Workshop January 16, 2009 – Orlando, Florida AS/EN/SJAC Oversight Process Tim Lee The.
Company Confidential Registration Management Committee 1 July 17, 2014 Bryan Blunt IAQG OASIS Administrator OASIS Tools for Continuous Improvement / Next-Gen.
Company Confidential Registration Management Committee (RMC) Independent Oversight Assessments 1 Other Party (OP) Assessor Workshop Palm Beach Gardens,
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Lessons Learned.
Registration Management Committee (RMC) Auditor Training and Workshop Minneapolis, MN July 30-31, 2009 Americas Aerospace Quality Group AAQG Registration.
Visit us at E mail: Tele:
External Provider Control
NAVSEA Material Fraud and Counterfeit Materiel Manager
Instructions for MRR in support of Q301
COUNTERFEIT PARTS DEFINED RISK FACTORS HISTORY WHAT IS BEING DONE
C.A.S.E. Presentation to FAA Leadership Washington, DC
NEEDS & EXPECTATIONS: INTERESTED PARTIES TO ISO & AS9100
AEROSPACE QUALITY MANAGEMENT SYSTEM STANDARD AS / EN / JIS Q9100
Suspected Unapproved Parts Program Office Aviation Safety Inspector
Statistical Product Acceptance
Industry Controlled Other Party Aerospace Auditor Expectations Kristy Heffernan Director - Quality Integrated Defense Systems The Boeing Company.
Witness Assessment AS9104/2A
How to conduct Effective Stage-1 Audit
Presentation transcript:

Company Confidential Registration Management Committee Counterfeit Parts Jason Dickstein, General Counsel Aviation Suppliers Association What Does “Counterfeit” Mean? Why is this an Issue?

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Information Jason Dickstein, Attorney Washington Aviation Group, PC Clients include these trade association - all three have MOUs with IAQG and AAQG for industry support and awareness: Aviation Suppliers Association (ASA) Modification and Replacement Parts Association (MARPA) Aircraft Electronics Association (AEA)

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Outline Counterfeiting Law U.S. Government Creating an Opportunity for Increased Anti-Counterfeiting Scrutiny Practical Tips for Auditing a Counterfeit Aircraft Parts Program

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee The FAA World of Parts FAA Approved Parts Unapproved Parts Counterfeit Parts

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee What is Counterfeiting? Lanham Act Unauthorized use in commerce of a trademark so as to cause –confusion, –mistake, or –deceit FAA or DoD approval may not be dispositive of counterfeiting questions There are many other fraud laws and parts laws in addition to this law

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Trademark Law Protects distinctive marks from use by others in commerce that leads to confusion, deception, or mistake –EXAMPLE: “palming off” something you created as if it were another manufacturer’s product –EXAMPLE: “reverse palming off” another manufacturer’s product as if it were something that you created –EXAMPLE: misuse of your registrar’s logo (the logo is likely a certification mark)

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Trademark Hypothetical OEM “X” sells a part described as Jason’s Parts obtains Air Force source approval to create a replacement that has the part number J OEM “X” wants to know if this part from Jason’s Parts is a counterfeit?

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Several Cases Have Addressed This Issue A single letter prefix or suffix that distinguishes OEM parts from aftermarket parts is inadequate –Could be confused for an OEM revision identifier Parts must be uniquely identified in a fashion that will make it possible to establish the source of such part even in the event of failure FAA Order permits multi-character prefixes and suffixes that identify source –So Jason might be an acceptable part number

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee The U.S. Defense Industry is Experiencing Counterfeiting Issues Commerce and GSA have issued reports Congress held hearing on this subject in November 2011 –Many of the counterfeits identified were discrete electronic parts that had been purchased by OEMs –Nearly every counterfeiting fact pattern from the reports includes a purchase from an ‘unknown suppler’

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Boeing Testified Before Congress Boeing noted that they had verified that all parts supplied did conform to appropriate physical properties –Congress took the position that even if the parts can be shown to conform to all physical properties, counterfeits are nonetheless considered “non-conforming” –Passed 2012 National Defense Authorization Act –Requires the Secretary of Defense to implement a program to “enhance contractor detection and avoidance of counterfeit electronic parts” –Program will essentially shift the burden for detecting counterfeit parts onto contractors by requiring them to establish policies and procedures to ensure counterfeit electronic parts do not enter the supply chain –A trusted supplier program will be part of this (Section 818 of the 2012 NDAA)

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee 2012 National Defense Authorization Act Passed 2012 –Requires the Secretary of Defense to implement a program to “enhance contractor detection and avoidance of counterfeit electronic parts” –Program will essentially shift the burden for detecting counterfeit parts onto contractors by requiring them to establish policies and procedures to ensure counterfeit electronic parts do not enter the supply chain –A trusted supplier program will be part of this (Section 818 of the 2012 NDAA)

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Tips for a Counterfeit Program How does the business ‘know’ their suppliers –Programs like FAA AC help ensure adequate quality systems for distributors using 3 rd party audit verification –Registrar auditor regularly conducting AC audits –FAA does not give a certificate number or logo to distributor to use – Ahttp:// A –594 companies participating in program

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Tips for a Counterfeit Program A Robust Receiving Inspection Process –Clear standards –Inspector training –Closed loop process for investigating red flags

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Unusual Finish/No Inspection Stamp

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Tips for a Counterfeit Program The receiving inspectors should look at the Parts – Not Just the Paperwork –Inspectors should look for visual discrepancies –Ensure the parts match the paperwork

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Vibrapeened Part Number

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Tips for a Counterfeit Program Inspectors should read the documentation –Inspectors should identify and investigate incongruities

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee No Documentation (OOP)

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Documentation Review Tips Check whether inspectors –ensure part numbers match the part number listed on the documentation –ensure serial numbers match the serial number listed on the documentation –ensure the part that arrived matches the purchase order description –Look at the signatures – do they appear to be robo-signed and is this normal?

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Different Finish

RMC Workshop Minneapolis, MN 19 – 20 July 2012 Registration Management Committee Thank You Jason Dickstein, ASA Counsel Washington Aviation Group, PC 2233 Wisconsin Avenue, Suite 503 Washington, DC Tel: (202) – Fax: (202)