Mesyuarat Pegawai Kanan JKR Malaysia 2011

Slides:



Advertisements
Similar presentations
Strategy Planning & BPM Consulting
Advertisements

Options appraisal, the business case & procurement
Align an IT Strategy to the Industry Vision
Test Automation Success: Choosing the Right People & Process
Sistem Sosial Dalam Organisasi
© Copyright Custell Pty Ltd The Relationship Lifeblood: Leverage the Relationship Improve Intimacy Create Value Reduce cost Partnering for.
Value for Money Edward Farquharson 12 May Agenda Development of the UK’s approach to ex ante VfM assessment Ex post VfM assessment Some observations.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
AACS Petrol &Convenience Business Acumen Program.
1 Change Management Overview. 2 Below are some facts based on research conducted on managing the resistance to change: 500 executives said that resistance.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Introduction to Project Management
Return On Investment Integrated Monitoring and Evaluation Framework.
VM SAVE International providing value ….. to the world VM Briefing SAVE International introduces “ Value Methodology ” Presentation version 1.
Viewpoint Consulting – Committed to your success.
Interoperability. Martin Sykes Information architecture programs suffer from EA's worst problem: They have a strategic and enterprisewide focus that.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Global Management Accounting Principles overview and opportunity for research.
Opportunities & Implications for Turkish Organisations & Projects
Centre for Strategic Manufacturing Measuring and Managing Team Performance Researcher: Kepa Mendibil Telleria Supervisor: Dr Jillian MacBryde DMEM Research.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Project Management What The Heck Is That?. Why Do We Need Project Management? Critical towards delivery of effective IT initiatives Ensures we align projects.
Charting a course PROCESS.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
KURSUS PENINGKATAN PENYAMPAIAN PERKHIDMATAN MELALUI MELIHAT SEMULA PRESTASI PENCAPAIAN DENGAN BERFOKUSKAN PELANGGAN PUBLIC SERVICE DELIVERY SYSTEM ( SISTEM.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Construction Category Management Planning Version 1.1 (May 2015)
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
Project Management Process Overview
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Project Management: Still More Art Than Science Presented By Donald W. Larson AC Bronze, CL June 6, 2007.
Zia Qureshi, Chief Executive Business Catalyst
BMT Sigma Capability Overview. BMT Group An international network of subsidiaries providing engineering, design and risk management consultancy Wholly.
Greening Government Operations Green Procurement Implementation Tools & Resources Canadian Public Procurement Forum October 1 st, 2007.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
IT Requirements Management Balancing Needs and Expectations.
TI Tata Kelola Sistem dan Teknologi Informasi BISNIS &
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
ENTERPRISE RESOURCE PLANNING
The Value Driven Approach
Job Analysis - Competency Modeling MANA 5322 Dr. Jeanne Michalski
Project Management 6e..
1 ARENA Workshop Renewables for Industrial Processes.
Proventures reconnect session on Project Portfolio Management (PPM)
Kathy Corbiere Service Delivery and Performance Commission
CHARTER – User Intelligence Groups Group Objectives Scope & Activities Key Areas For Success  Visibility of expenditure on goods and services across the.
Exploration of parallels in Lean and VM methodology in construction Steve Parker, Institute of Value Management.
12-CRS-0106 REVISED 8 FEB 2013 APO (Align, Plan and Organise)
12-CRS-0106 REVISED 8 FEB 2013 BAI (Build, Acquire, and Implement) CDG4I3 / Audit Sistem Informasi Angelina Prima K | Gede Ary W. KK SIDE
EPM Solution: Executive Overview and Discussion 1 with the Microsoft EPM Solution and Saving Money Improving Business Outcomes.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
Continual Service Improvement Methods & Techniques.
Project Management Institute, Northeast Florida Chapter Learning Materials PMI PMBOK(R) Guide A Guide to the Project Management Body of Knowledge Rita.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright © 2007 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture. October 24 th, 2007 CORE.
Rob Connatser NSS Instrument Work Packages and XLPM.
From Idea to Business Case
Project Management Ashima Wadhwa.
Project Management 6e..
Value Engineering What is VALUE Engineering.
Statistics Canada Internal Services Business Transformation Experience
PEKELILING KEMAJUAN PENTADBIRAN AWAM
PENGENALAN JABATAN PERKHIDMATAN AWAM ADALAH SEBUAH JABATAN DI BAWAH JABATAN PERDANA MENTERI JABATAN PERDANA MENTERI ADAT ISTIADAT NEGARA AUDIT BIRO KAWALAN.
Project Management 6e..
Project Management 6e..
Presentation transcript:

Mesyuarat Pegawai Kanan JKR Malaysia 2011 VALUE MANAGEMENT in RMK-10 Mesyuarat Pegawai Kanan JKR Malaysia 2011 30 Mei – 1 Jun 2011, Melaka

implementation of VM in RMK-10 content the VALUE CONCEPT overview of VM implementation of VM in RMK-10

the VALUE CONCEPT

value management key message COST CUTTING maximising PROJECT VALUE

value management value concept VALUE = Function (F) + Quality (Q) Cost (C) By Dell ‘Isola: Function Quality Cost = The specific work that a design or item must perform = The owner’s or user’s needs, desires and expectations = The life cycle cost of the product or project

value management value enhancement VALUE = (F) + (Q) (C) (i) (ii) Reducing cost but maintaining the function and quality Increasing either the function or quality or both but maintaining the cost (iii) Reducing the cost and at the same time increasing the function and quality (iv) Increasing the cost but at the same time improving function and quality at a higher proportion

value management how value is optmised? Understanding of business objectives, needs and expected outcomes Alignment of project deliverables with functions Elimination of unnecessary costs Innovative solutions sought

overview of VM

value management definition ‘VM is a proactive, creative way, problem solving service, using structured systems and multi disciplinary team orientated approach to generate alternatives with the relationship of function with value’ Source: Kelly and Male (1993)

value management standards USA UK/Europe Australia / New Zealand Value Standard & Body of Knowledge (SAVE International) UK/Europe British / European Standards BS EN 12973:2000 Australia / New Zealand AS/NZ Standards – Value Management & TAM 2000 (NSW)

value management terminologies VALUE MANAGEMENT VALUE METHODOLOGY Value Analysis Value Assessment Value Planning Value Engineering Value Review VALUE METHODOLOGY

value management terminologies

value management benefits Better investment decision Improved products or services Robust management style Vehicle for innovation and change Effective methods and tools Enhanced competitiveness Improved communication Positive human dynamics

value management VM challenges Misconception towards VM Misconduct of VM process and practice Negative attitudes and rejections Lack of VM experts and standards Lack of commitment and support No financial incentive for contractors (VECP)

implementation of VM in RMK-10

value management garispanduan UPE 1 2 Pekeliling UPE GARIS PANDUAN PELAKSANAAN PENGURUSAN NILAI Bil 3 Tahun 2009 (29 Disember 2009 - bagi project > RM50juta) 2 PANDUAN PELAKSANAAN PENGURUSAN NILAI DALAM PROGRAM/PROJEK KERAJAAN (24 Mei 2011 – www.epu.gov.my

value management Unit VM JKR 1 2 3 FUNGSI UTAMA: Membangunkan sistem, proses, tools, techniques bagi pelaksanaan VM di JKR 2 Membangunkan kompetensi dalaman bagi VM di JKR 3 Menyelaras pelaksanaan VE bagi projek Kerajaan yang dilaksanakan oleh JKR

(Design / Construction) value management VM implementation in RMK-10 1 VALUE ASSESSMENT (Asset Creation) EPU & Ministries Strategic Direction On Asset Creation 2 JKR & JPS Project functional performance and cost optimization VALUE ENGINEERING (Design / Construction) 3 Audit & Ministries Benefits realization review & lessons learned VALUE REVIEW (Operation)

(> RM 50 M - 1st Rolling Plan) value management VM labs for RMK-10 projects (> RM 50 M - 1st Rolling Plan) Total VA labs 156 Projects Labs completed 88 Projects Remaining labs 68 Projects (by 30 April 2011)

VA Labs Status (>RM50 m - 1st Rolling Plan) KEMENTERIAN JUMLAH PROJEK TELAH DILAKSANA BAKI Jabatan Perdana Menteri 33 19 14 Jabatan Perkhidmatan Awam 1 Kementerian Tenaga, Teknologi Hijau dan Air 12 4 8 Kementerian Dalam Negeri Kementerian Kemajuan Luar Bandar & Wilayah 15 3 Kementerian Kerja Raya 18 Kementerian Kesihatan 5 2 Kementerian Luar Negeri Kementerian Pelajaran 7 Kementerian Pelancongan Kementerian Penerangan, Komunikasi dan Kebudayaan Kementerian Pengajian Tinggi Kementerian Pengangkutan 6 Kementerian Perdagangan Antarabangsa & Industri Kementerian Pertahanan Kementerian Pertanian & Industri Asas Tani Kementerian Perumahan & Kerajaan Tempatan Kementerian Perusahaan Perladangan & Komoditi Kementerian Sumber Asli & Alam Sekitar 11 Kementerian Sumber Manusia Kementerian Wilayah Persekutuan Perbendaharaan Kementerian Sains, Teknologi dan Inovasi JUMLAH BESAR 156 88 68 Source From EPU - As at 30 April 2011

Projected VM schedule for RMK-10 RMKe - 11 2011 2012 2013 2014 2015 2016 2017 1 2 3 4 5 6 7 8 9 10 11 12 1st Rolling Plan (Total VA1 = 156 projects) (Total VE1 = 156 projects) (VR1) (VA1 = 88 ) (VA1= 68) 2nd Rolling Plan (VA2) (VE2) (VR2) 3nd Rolling Plan (VA3) (VE3) VA – Value Assessment VE – Value Engineering VR – Value Review

value management VM interventions in process flow JKR Design GN 2 & GN 3 GN4 Design Strategic Planning VA Planning VE (I) & (II) Tender Construct VECP Handover VR EPU & Ministries JKR AUDIT & Ministries

value management enhancement strategies EXECUTION OF VM STUDY Intervene at best opportunity of value study Clear scope and objective of study Prioritize client value system Enhance Asset & Facility Management Strategy Incorporate Project Management – Risk Management, Work Programme, Strategic Procurement etc

value management enhancement strategies MANAGEMENT OF VM STUDY Enhance facilitation skill & competency Enhance governance, process, tools & techniques Strengthen pre-study (orientation & diagnosis) Improve communication with participants Involve all required experts & stakeholders including users

value management outcomes VALUE FOR MONEY Cost Optimization Efficiency User Satisfaction Cost Optimization Effective Communication Robust Decision Making Efficiency Improved Prioritization Functional Team Building

value management to achieve

TERIMA KASIH

value management Value Assessment (VA) Business, users and key stakeholders’ needs Benefits or outcomes sought Required strategic functional performance Asset creation strategy or other business options Development of scope and cost Project development strategies (Timelines; Procurement; Risks etc)

value management Value Engineering I (VE I) Validate business needs Validate client value systems Validate strategic functions Optimize functions to facilities’ design Optimize spatial efficiency, structural system, energy efficiency performance Optimize cost through design options Strategies to implement project (Timelines; Procurement; Risks etc)

value management Value Engineering II (VE II) Optimize designs Optimize cost to element and component levels Optimize time, quality and build ability Validate spatial efficiency, structural system, energy efficiency performance Life Cycle Costing (LCC) on high value assets Finalize facilities’ designs Refine implementation plan

value management VECP (With Incentive Based Clause) Optimize cost to elements and/or component level Optimize time, quality, build ability Optimize facilities and energy efficiency system Life Cycle Costing (LCC) on high value assets Innovative construction and operational improvements

value management Value Review (VR) Objectives review of completed project Benefits or outcomes realisation review Operational efficiency improvement Lessons learned for future projects