Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE.

Slides:



Advertisements
Similar presentations
Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Construction Project Coordination Presented by: Philip H
Organization of Primary Entities
Construction Contracting
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Job Order Contracting ( JOC) Chicago Department of Aviation Capital Improvement Program Panel member: Joseph S. Dote, Sr. Vice President R.M. Chin & Associates,
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Procurement Process Economic Stimulus. Items to Be Discussed Professional Services Information Design Build vs. Conventional Where to Find Advertisements.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Topic1b: Project Life Cycle
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Alternate Procurement & Funding in Washington State Erin L. Anderson Stoel Rives LLP February 12, 2008.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
CONFIDENTIAL Montgomery County Board of Supervisors Christopher D. Lloyd October 25, 2010 Public Private Partnerships for.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
1 Chapter two ROAD TO DESIGN BUILD. 2 ROAD MAP  THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP)  CM  PM  DB IS THE LATEST STAGE: NEW PERSPECTIVE.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
Construction Management At Risk Process
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Interstate 270 Innovative Congestion Management Progressive Design-Build Contract.
Scott Raines, Director of School Planning and Construction “Investing in West Virginia’s Future”
Procurement & Strategic Sourcing
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
Construction Oversight
CM at Risk v. Design-Bid-Build
PROJECT DELIVERY METHODS
Joint Parking Task Force Update Procurement & Strategic Sourcing
Project Delivery Systems
Two-Dam Independence Project Update
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Richland Creek Water Supply Program Program Update
Presentation transcript:

Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE

2 Risk OWNER Prepares Design  Constructibility Reviews by CM During Design Contractor Selected Through Professional Services Code  Limited to Quality Contractors  Qualifications Based Selection  Historical Performance of Contractor Considered CM Firm Responsible for Construction  Guaranteed Maximum Price  Generally Prohibit Self-Perform

3 Risk Contract Structure CM FIRM (Prime Contractor) Designer OWNER Constructibility SubContractors

4 Advantages of Risk Time  Eliminate Bidding & Contract Execution Time  Bidding Prior to Completion of Design  Flexibility to Re-Bid or BAFO Cost  Approximately Same Costs (Assignment of Risk)  Requires CM Fee  Claims Reduced Risk  Construction Contract Between CM & Contractor  Shifted from Owner to CM Firm Innovation  Excellent Use of Contractor & Designer Linkage Technical  Qualifications Based Selection  Address Non-Traditional Aspects  Allows for Significant Changes During Construction

5 Risk Process Owner hires designer Owner hires CM firm CM Firm provides construction input (cost, constructability, schedule, etc) throughout design development CM Firm is asked by Owner to give GMP Construction is added by Task Order May not ever have a Task Order

6 Program Advancement Framework for building shelf Allows corridor segmentation Multiple construction projects (Sanibel had 5 different Task Orders for project components) Fast implementation

7 Risk Implementation Modify Design Project Scope Amend Work Program/CIP to add CM Phase  Cost of CM Fee during design - $250,000 to $500,000 - Based on Actual Work Assigned Procure CM Services  Phase 1 Constructibility reviews during design  Subsequent phases included in scope, subject to authorization  Program subsequent phases based on fund availability and priorities

8 Risk Advantages Provides ability to advance some or all of construction phase Provides quality-based selection for contractor Creates framework for design and construction innovation

9 Sanibel Island Bridges – Case Study Lee County planned conventional Design-Bid-Build PD&E indicated 2 conventional bridges “B&C” could last years PD&E indicated Bascule Bridge “A” could be renovated and last 15 years Lee County hired two designers in July 02: 1) Replace Bridges “B&C” 2) Renovate Bridge “A” December 02 – First Span Bridge “B” fell in water Lee County re-evaluated all three bridges and found major deterioration – needed replacing ASAP Lee County advertised for Risk – February 03

10 Sanibel Island Bridges – Case Study Lee County announced replacing all three bridges:  Bridge “A” – 65’ High Rise  Bridges B & C – Same type as current  Hired Jacobs as CM Firm to expedite construction  Modified Bridge “A” contract  From: Modify Bascule Bridge  To: Replace with new 65’ High Rise Bridge Jacobs issued Task Order  Constructability Review of plans  Pre-Qualify / Short List contractors Sanibel Island filed law suit to stop High Rise Bridge construction (Permits not issued by Coast Guard) Jacobs advertised Bridge “B” & Bridge plans. Received Bids.

11 Sanibel Island Bridges – Case Study Jacobs submitted GMP to Lee County w/10% Contingency (Owner Owns) Issued Phase I Contract for Bridge “B” w/Permit Application Drawing Drove several “Test Piles” while waiting on Permits Gained 7-12 months on schedule Gambled on Permits being issued as submitted Requested several BAFO from Contractor to lower cost due to high bids

12 Sanibel Island Bridges Risk  Phased construction of three bridges  BAFO after contractors bids provided  Modified program based on finances available  Staged permit approvals

13 Sanibel Island Bridges

14 Sanibel Island Bridges

15 Sanibel Island Bridges

16 Sanibel Island Bridges

17 Sanibel Island Bridges

18 Sanibel Island Bridges

19 Sanibel Island Bridges

20 Sanibel Island Bridges