The Waddell A-Truss Bridge

Slides:



Advertisements
Similar presentations
How to Make a Patch Pocket
Advertisements

How to build a bridge.
Wooden Bridge Construction
GATHER THE FOLLOWING SUPPLIES:
Tenon Cork Replacement Remove all the old cork plus any residue of the old glue Use the tenon itself to measure where to cut the replacement cork strip.
Designing and Building File-Folder Bridges
Packaging Design: Net This net is for an octagonal based prism. As with all technical drawings, the equipment goes a long way in helping you to draw a.
How to build a bridge!.
Drawing & Painting Final Exam Book-Making Instructions.
Truss Basics – Overview
Summit Tech. Ed. Dune Buggy Mrs. Greissel
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Cantilever Tower Project
Fiberglass Short Arm Cast Application and Removal
Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University.
Bridge Building Notes Physics.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Pneumatic Arm Assembly Instructions
Cut off the top off an aluminum can. Exploration Warning: Be very careful not to cut yourself on the sharp edges of the can.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Competency: Draw roof plans
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Much of the material from: COL Stephen Ressler, P.E., Ph.D.
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
Elevated Bridge.
Bridge Building.
Bridges Vocabulary. Bridge  A structure used to help people cross valleys, rivers and bodies of water.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Design Technology We all need Design technology as a part of life, its all about making things to help make life easier. In the next couple of weeks you.
MESA DAY BRIDGES. MESA BRIDGES Forces at Work Forces in a Bridge Building Better Bridges Rules Testing Procedures Materials Suppliers.
Ceiling Framing Unit 32.
Making a Home Made Estes Rocket By Roberto & Stefano Barbier.
Roof and Ceiling Framing
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
Our Bridge Presentation Group # 7 By: Kokul Shanmugharajah, Allen Lam and Branden Viarruel NEXT.
Bridge Construction. Your Truss Bridge Drawing Typical Bridge Joint 10mm x 10mm Tube6mm x 10mm Tube 4mm Bar.
ECYBERMISSION By Payton, Anna, Nikita, and Kira. Problem Lack of green energy. Percent of windmill usage is very low. Critical in the long run; The energy.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Gingerbread House Construction Instructions graham crackers 2.Knife 3.Cutting board 4.Hot glue gun 5.Base for house (paper plate)
Cardboard Bridge Construction Inventor Step 1 1.Open Autodesk Inventor Open the Card Board Bridge ipt file from the assignment log 3.Use.
Made by Nick Johnson Continue. Table of Content Start Lesson How to QuizTeachers.
Bridge Building Challenge Materials: 24 ft. of 3/32” balsa wood and one bottle of Elmer’s glue, scissors NO OTHER MATERIALS MAY BE USED Specifications:
How to dry mat your photos. Supplies White or black mat board Image Millimeter ruler T-square ruler Mechanical pencil Exacto Knife and Green Gridded cutting.
Balsa Bridge Construction
Build A Motor You must follow the directions step-by-step!
The Waddell A-Truss Bridge
Competency: Draw roof plans
How to make the basic car
Structural Considerations for Trusses
Competency: Draw roof plans
Basswood Lengths and Quantities 12” (305 mm) Bottom Horizontals
Hand-cranked Windmill Assembly Instructions
Day 1.
Stick Together & Civil Structures
Step-by-step assembly instructions
Balsa Glider Construction
Step-by-step assembly instructions
Bridge Construction.
STRAW TOWER SUMMARY/EVALUATION NOTES LESSON
Bridge Construction This is the week 5 PowerPoint presentation.
Design Brief Liam and Dorsa.
Challenge to hold the most weight
The Waddell A-Truss Bridge
Structural Stability and Strength
Competency: Draw roof plans
Competency: Draw roof plans
Civil engineering drawing
Balsa Glider Construction
Presentation transcript:

The Waddell A-Truss Bridge Designing and Building File-Folder Bridges as an Introduction to Engineering The Waddell A-Truss Bridge COL Stephen Ressler, P.E., Ph.D. Department of Civil & Mechanical Engineering U.S. Military Academy, West Point

Why File Folders? Inexpensive. Easy to cut, bend, and glue. Surprisingly predictable structural behavior. Can be used to build: Tubes and bars. Connections that are stronger than the attached structural members.

Let’s build this bridge... Waddel “A Truss” Bridge over Lin Branch Creek Trimble, MO http://structurae.net/structures/data/index.cfm?id=s0001386

The Design Design Requirements: Span–30 cm Loading–5 kg (at midspan) 10 mm x 10 mm Tube Doubled 4 mm Bar Doubled 2 mm Bar Profile View

Our A-Truss Bridge

Materials & Equipment File folders Yellow carpenter’s glue Building board (Styrofoam or cork) Pins Scissors Ruler Drawings – side and top view

Prefabrication of Members Cut out bars Cut out and assemble tubes Cut out gusset plates Trim bars and tubes to length

Part 1 - Prefabrication Prefab 10mm X 10mm Columns Prefab Double 4 mm Bars Prefab Double 2mm Bars Prefab Gusset Plates – 3 styles Prefab Middle Beam

Part 2 – Truss Construction

Trim Bars and Tubes to Length Bottom Chords (2 per team)

Trim Bars and Tubes to Length Bottom Chords (2 per team)

Trim Bars and Tubes to Length Verticals (2 per team)

Trim Bars and Tubes to Length Verticals (2 per team)

Trim Bars and Tubes to Length End Posts (2 per team)

Trim Bars and Tubes to Length End Posts (2 per team)

Set up the Building Board Each Team Member: Place the layout drawing on your building board.

Set up the Building Board Place a sheet of plastic wrap over the layout drawing.

Add Gusset Plates Place Gusset Plate A at its correct location on the layout drawings. Hold it in place with two pins.

Add Gusset Plates Repeat the process for Gusset Plates B, C, and D.

Add Bars Apply a line of glue along the bottom edge of Gusset Plates A, B, and C. Place a 2 mm bar in position as the bottom chord AC. Stretch tight and hold in place with two pins.

Add Bars Apply glue to Gusset Plates B and D. Place a 4 mm bar in position as the vertical member BD. Stretch tight and hold in place with your fingers. Each team should now have two of these subassemblies — the lower half and the upper half of one truss.

Add Tubes For the bottom half of the truss (one per team): Apply glue to Gusset Plates A and D. Place a 10mm x 10mm tube in position as end post AD. Hold in place for a minute until the glue sets.

Add Tubes Apply glue to Gusset Plates C and D. Place a 10 mm x 10 mm tube in position as end post AD. Hold in place for a minute until the glue sets.

Add Tubes Cut a 2 cm length of 10 mm x 10 mm tube. Apply glue to Gusset Plate B. Place the tube vertically on the gusset plate. Hold in place for a minute until the glue sets.

The Finished Half-Truss Allow all glue joints to dry.

Assemble the Two Halves Pull out all of the pins on both halves of the truss. Carefully separate the upper half of the truss from the plastic wrap. Keep the lower half of the truss on the building board.

Assemble the Two Halves Put glue on the tubes at A, B, C, and D. Place the upper half onto the lower half. Stretch the bars tight and hold until the glue has set.

Assemble the Two Halves Allow all glue joints on the completed truss to dry.

Finish the Truss Trim off the excess length on both bottom chords (AC) .

Place the Structure into Service The completed bridge Load test with 5 kg of sand suspended from midspan