Overview of Vehicle Assist and Automation (VAA)Technologies and Applications Rob Gregg Director, Transit Management & Innovation NBRTI/CUTR/University.

Slides:



Advertisements
Similar presentations
Los Angeles Bus Rapid Transit Tour Lessons Learned.
Advertisements

EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Adding Priced Capacity for Congestion Relief Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation
9/7/2012 MBS UU.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
I-15 Managed Lanes: Building on Success And Lessons Learned I-15 Managed Lanes: Building on Success And Lessons Learned.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Automated Highway System (AHS) Intelligent Vehicle Initiative (IVI) Vehicle Infrastructure Integration (VII)
Oceanside-Escondido Rail Line Final Project Presentation John R. VelascoMay 12 th, 2003.
1 PATH Testbed Resources for Intelligent Transportation Systems Research Karl Hedrick Director, California PATH.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Center for Urban Transportation Research | University of South Florida Technology Session: 21 st Annual Transportation Disadvantaged Best Practices and.
BRT Vehicle Development. New Flyer Overview  Winnipeg, Manitoba since 1930 Three US facilities  Industry-leading market share of 42%  Commercial relationships.
1 Metrolinx delivers The Big Move Regional Transportation Plan: Transforming Transportation in the Greater Toronto and Hamilton Area November 5, 2012 Bruce.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
Transportation Planning and Design in Practice
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
1 Program of Projects Study The Impacts of Regional Transit Investment Forum March 21, 2013 Move LA - "LA's Got Lines"
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
AHS – The Vision. The Automated Highway System (AHS) and The Intelligent Vehicle Initiative (IVI)
Center on Tolling Research Technology for Managed Lanes Christopher Poe, Ph.D., P.E. Assistant Agency Director Director, Center on Tolling Research Texas.
Asia Pacific Economic Cooperation Transportation Working Group ITS Experts Group Busan, South Korea September 2, 2003 Walter Kulyk, P.E. Director, Office.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
1 Development of a Regional BRT System Proposal Presented to the TPB Access for All Committee April 23, 2009 Michael Eichler and Monica Bansal Transportation.
Field Operational Tests of Vehicle Assist and Automation Technologies California-Oregon VAA Team Ching-Yao Chan and Wei-Bin Zhang 5 th National BRT Conference.
High-Occupancy Toll (HOT) Lanes Recent Developments Planning and Operations Committee September 9, 2005.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using.
FAST Lanes Program Transportation and General Government Policy Committee Association of Metropolitan Municipalities August 16, 2004 Minnesota Department.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
US DOT Congestion Initiative Urban Partnership Agreements NTOC Summer Meeting September 7, 2007 Washington, DC Jeffrey F. Paniati Associate Administrator,
Wireless Sensor Network Solutions Regional Mobility Solutions Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other.
Transportation Planning: A Field in Flux Steve Heminger, Executive Director Metropolitan Transportation Commission April 2004.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
Complete Streets Training
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Metropolitan Council Transit Capital Improvement Program October 10, 2007.
Affordable Housing and Sustainable Communities (AHSC) Program
Monet & Treviana HOA ― Construction Open House November 17, 2016
2018/5/14 QUANTIFYING PHYSICAL ACTIVITY USING AN ACTIVITY-BASED TRAVEL DEMAND MODEL My topic today is---READ Question try to address is- READ I want to.
Regional Roads Committee
D Line Project Overview
Presentation transcript:

Overview of Vehicle Assist and Automation (VAA)Technologies and Applications Rob Gregg Director, Transit Management & Innovation NBRTI/CUTR/University South Florida QUALITY TRANSIT -- NOW

What is VAA ? “VAA systems are a cost effective solution to provide Rail like service at bus type prices using BRT vehicles Equipped with inexpensive driver assist technologies”  Vehicle Assist: applications that help driver maintain control bus (driver always in control):  Precision Docking  Vehicle Guidance  Vehicle automation: applications that provide full automated control  Platooning  Automated Vehicle Operations

VAA: An Enabler for BRT 3 LRT BRT Heavy Rail Bus Level of Investment (e.g. Capital Cost, Operating Cost) Level of Service/Performance Measure (e.g. Capacity, Operating Speed, Travel Time, etc.) Feasible Region Los Angeles Local Bus Los Angeles Metro Rapid BRT with VAA Fully Grade Separated Roadway Shoulder Operations At-Grade Transit- way Designated Arterial Urban Circulator Suburban Collector

PATH Magnetic Guidance System PATH/UC Berkley/Caltrans Developed since 1987 and thoroughly tested –National Automated Highway Systems Consortium demonstration in San Diego in 1997 –Field tested for Bus Rapid Transit on arterials High performance –10 cm lane keeping accuracy at highway speeds –5 mm precision docking accuracy Costs for infrastructure instrumentation: less than $20k per mile 5 mm = "

PATH DGPS/INS/Magnet Based Guidance System Yaw rate gyro Integrated DGPS/INS Unit Magnetic Marker System Steering actuator

Caltrans, together with AC Transit in the San Francisco Bay Area and the Lane Transit District (LTD) – Eugene Oregon, supported by PATH Goal: To demonstrate the technical feasibility of lateral vehicle guidance and how vehicle guidance can improve transit agency operational efficiency, performance and service quality. Benefits of Lane Assist Technology : Reduced Land Use Reduced Impervious Surface Minimize impact on Existing Land Uses Reductions in Dwell Times at Stops Reduced Travel Time Safer Operation Improved ADA Access Rail-Like Image

7 VAA Demonstration Environment / Technology Revenue Service Applications –AC Transit - Lateral guidance on an HOV lane and through a toll plaza –LTD - Bus Rapid Transit (BRT) transit way lateral guidance and precision docking at bus stops Technologies Proposed –Magnetic marker sensing –Differential Global Positioning System (DGPS) with inertial navigation sensors –Combination of the two

San Mateo Bridge AC Transit Proposed VAA Test Route: TransBay Express Bus Line M 45ft. MCI Coach / Air Conditioned/ High Back Seating / Wi Fi Service Bay using San Mateo (92) and Dumbarton Bridges (84)

Application Environments AC Transit Lane M –4 miles HOV on Route 92 –Narrow toll plaza on San Mateo Bridge –Positioning Bike Racks (4 Bikes, 2 per bay) and wheelchair lifts –Diverse urban & suburban local streets –Poor road conditions (trees, narrow roadways, tight turns)

63-foot articulated bus New Flyer Hybrid-electric propulsion Doors on left and right side Bikes on board Vehicle

Application Environments Lane Transit BRT –Four-mile corridor & eight stations 15.5-minute travel time 10 minute service (except late at night) –(1) 60 ft New Flyer BRT buses Technology to be tested –Magnetic guidance along dedicated lane segments –Precision docking –Collection of DGPS data for verification for lane assist and precision docking in urban area

Median traversable Transit Lane

Other VAA Demonstrations Minneapolis Urban Partnership Agreement (UPA) Lane Assist –Shoulder Running: Cedar Avenue (TH 77) – Cross-town Commons (TH 62) – I-35W –Differential GPS & Non-contact Velocity Measurement Technique (to augment DGPS) –Development Underway SANDAG Transit Only Lane (TOL) –Shoulder Running: I-805 –Technology TBD –Proposals Received

Minnesota Lane Assist Project System component procurement / design complete. The DGPS Virtual Reference Station Network is operational with 5 of 6 base stations connected. The driving simulator purchased / Operational spring of The U of MN HumanFIRST program has initiated the development of the training protocol, both for the simulator portion of the training program, and for the on-road portion of the training protocol. New steering feedback system designed, and is under development. Operational 2010

SANDAG San Diego VAA Project: TOL (Transit Only Lane) 21 Miles of Freeway Shoulder Operations. –Introduces this new transit service along a 20 mile stretch of the I-805 corridor (42 miles round trip) Provide drivers with assistive technologies but ensure they retain ultimate control. Utilize combination of sensors to support situational awareness, lane- keeping and adaptive cruise control functions. Builds on the successful technology demonstrations in 1997 and 2003 in San Diego. Request for Proposals: Winter 2008 – currently evaluating proposals Begin Design & Construction: Spring 2009 Begin Service: Spring 2010

VAA: Potential Capital Cost Benefits: Narrow Right of Way Standard Bus width 8.5. ft. + mirrors Standard Highway Lane Width = 12 ft. Automatic Steering Reduces Lateral Tracking Errors to 10 cm or less on straight roads and moderate curves Reduction cost for Bus ROW & Construction? Bridges and Tunnels?

Envisioned Customer / Operational Benefits “Rail-Like” Experience Easy Access, ADA Feature, Bicycle Use Improvement Reduce Boarding / Dwell Time Reduce System / Vehicle Damage Reduce Operating / Maintenance Costs Improve Travel Time, Safety and Productivity

VAA Advisory Panel (VAAAP) Peer Transit Agencies Technology Experts User Market Interest Groups Industry Manufacturers Technology / Information Transfer

Rob Gregg Director, Transit Management & Innovation NBRTI/CUTR/University South Florida Wei-Bin Zhang, PATH / University of California, Berkeley