The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Advertisements

Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Corridor-Wide Construction Presentation to FDOT Materials Lab
CEM-512 Value Engineering Highway Project: South Interchange.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Miami River – Miami Intermodal Center Capacity Improvement (MR-MICCI) Project September 8, 2014 Presented by:
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
The Alameda Corridor: Lessons Learned Presented to: UCI Conference on the New Generation of Transportation Financing in California Costa Mesa, CA Gill.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Reconstruction of the Eads Bridge Highway Deck
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
CONNECTING PEOPLE. The Miami Intermodal Center October 24, 2008 It’s on its way!
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Detroit Intermodal Freight Terminal (DIFT) Project AASHTO SCOWT October 13, 2011.
River to Sea TPO CAC A Presentation to: May 19, 2015.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Runways – 7 July Paul Harwood
75 Express Lanes Project From NW 170 Street to I-595 Corridor Advisory Committee Meeting Wednesday, July 15.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Current Construction Projects Major Projects Pinellas County.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
1 BENEFITS OF A MULTI-YEAR TRAVEL MODEL NETWORK CODING ENVIRONMENT TRB Planning Applications Conference Monday, May 7, 2007.
TRANSPORTATION AND ECONOMIC DEVELOPMENT LINKAGES PRESENTED BY DEBRA M. SIMMONS WILSON PARSONS BRINCKERHOFF.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
Interstate 5 / Empire Avenue Interchange Project B-G-P Airport Authority – April 4, 2011.
Arizona Forward Update
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Regional Roads Committee
River to Sea TPO Meeting US 92/International Speedway Boulevard
Florida Transportation Commission FY 2009
Highway 169 Bridge Replacement & Pavement Resurfacing
ENGINEERING USING THE DISTANCE FORMULA
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!

The MIC Program Current $1.7 billion program Major components –Rental Car Center –MIA Mover –Miami Central Station –Roadways Improvement Program - completed –Right of Way Program - completed –Joint Development – pending

MIC Program Goals Create connectivity in Miami-Dade County where none existed Decongest roads leading to the county’s number one economic generator – MIA

Roadway congestion Operational deficiencies – flooding Separate S.R. 836 & MIA traffic from major roadway traffic Why Major Redesign of Roadways Needed

FDOT Reconstructed Roadway System Total Cost $184 M –$13 M design –$154 M construction –$17 M CEI –MDX contributed to Right of Way Design Engineering Firms –BHA Engineers –Kimley-Horn & Associates –Sanchez-Zeinali & Associates –T.Y. Lin International –URS Corporation –APCT Engineers Solution 2009

Master Plan –Roadways/ Bridge Development Report (BDR) BHA

Reconstruction of Le Jeune Road from NW 11 th Street to NW 18 th Street Le Jeune Road Northbound Collector Distributor 2009 Kimley-Horn & Associates

Bridge 10 A –Connects RCC to Le Jeune Road Southbound Collector Distributor Sanchez-Zeinali & Associates

Reconstruction of Le Jeune Road Southbound Collector Distributor –Connects MIA & South Le Jeune Road to S.R. 836 T.Y. Lin International

MIC-MIA Interchange Le Jeune Road North from NW 18 th Street to NW 31 st Street 2009 URS Corporation

MTAR Design –NW 21 st Street –NW 25 th Street –NW 38 th Court –Transit Access Roads Roadway Improvements –NW 14 th Street Drainage, Utility & Signage Master Plans A&P Consulting

Roadway Improvements Program Le Jeune Rd MIC-MIA Interchange Before AfterMTAR

Reconstruction of Northbound & Southbound Le Jeune Road –Eliminated flooding & frees corridor from expressway & airport traffic Construction of New Le Jeune Road Northbound Collector Distributor –Reroutes traffic away from Le Jeune Road & provides direct connection from eastbound & westbound S.R. 836 to the MIC & MIA Construction of New Le Jeune Road Southbound Collector Distributor –Separates airport traffic from local traffic on Le Jeune Road & connects existing MIA traffic with westbound S.R. 836 & southbound Le Jeune Road Reconstruction & new construction of MIC-MIA Interchange including 11 bridges, ramps & access roads –Links MIA to north & southbound Le Jeune Road & RCC to Le Jeune Road Le Jeune Road Reconstruction

Reconstruction of NW 25 th Street from Le Jeune Road to NW 37 th Avenue –Improves access to MIA, RCC & future MCS Reconstruction of NW 21 st Street from NW 38 th Court to east of Le Jeune Road –Improves access to MIA, RCC & future MCS MIC Terminal Access Roads (MTAR) Construction of at-grade and elevated roadways around RCC & MCS –Provides feeder roads & ramp access to RCC & MCS Link with Le Jeune Road Corridor projects, providing a seamless connection to S.R. 836

Maintenance of traffic during design & construction –Maintain uninterrupted access to MIA 24/7 Sequence of construction with various roadway projects Coordination with design teams, FDOT, MIA, MDT, MDX, Miami-Dade County, City of Miami, CSX Railroad track, C-4 Miami Canal, surface water permitting agencies (SFWMD & DERM), FPL Transformer Station & other utility companies Design & construction of Bridge span structure on curved alignment using AASHTO beams with deck on superelevation transition Prevalent flooding in area due to poor drainage conditions Roadways Improvement Program Challenges

Enhances effective movement of people, goods & services – airport & expressway traffic rerouted Increases transportation efficiency – more direct connections Improves safety & accessibility – relieved congestion & eliminated flooding Aids traffic management – dedicated access lanes Enhances community life by providing a functional north- south artery in the heart of Miami-Dade County Roadways Improvement Program Benefits

Le Jeune Road Le Jeune Road Landscaping MIC-MIA Interchange MTAR

CONNECTING PEOPLE