Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept. 2011 Delft.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Managing Construction Risks
D&C PT Contractor’s Role & Responsibilities Chris M. Harris Contracts Manager, Structural Systems & PTIA Technical Committee.
Course: e-Governance Project Lifecycle Day 1
Fachgebiet Projektmanagement 3. Kasseler PM-Symposium 2007 K. Spang: Partnerschaft zwischen AG und AN – die Zukunft des Bauens Chair of Project Management.
Better Work Indonesia Pilot Environmental Cluster Assessment Crowne Plaza Hotel, Jakarta, 10 June 2014.
12 November WP3 – General Perspective By Thomas Dunand, Hannover Re Forum Meeting 7, DG ENTR, Brussels.
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
CONSTRUCTION OF 3 POLICE STATIONS IN 3 MUNICIPALITIES REPUBLIC OF MACEDONIA Dutch, Hungarian, Norwegian and Swiss Cooperation.
Skanska Czech Republic Building Division Nestlé, CZ HQ, Prague, 2006 New trends in Facades Think different Skanska LOP.
ESCL Annual Conference Stockholm 25 August 2006 Large Projects - Insurable to what Extent? What drives the premium? By Anders Lindberg, MSc CE, Vice President,
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
National Disaster Risk Management Program NDRMP Belgrade, March
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
The Committee of Registration and Licensing the Practice of Engineering Consultancy Profession and Contracting # Activity codeActivity Architectural design.
Luise Lorenz Christina Mohr Niklas Wilkens Miguel Cabezudo Nicolas Laflesselle.
Country Experience In Improving Governance of Tenure of Land, Turkey.
Adventure Works “Construction Expert Team Brokers Link” Roberto Armana President - CEO PCA SpA September 2010.
Construction Industry. Salisbury Cathedral Taj Mahal.
INTRODUCTION AS PROJECT MANAGEMENT COMPNAY (August 2012)
INTROUDCTION TO ENVIRONMENTAL MANAGEMENT Julia Brown Project Manager Waste Research Management & Training Centre C/o Scientific Research Council.
INTERNATIONAL INSURANCE MEDIATION CONFERENCE Istanbul, March 2011 INTERNATIONAL INSURANCE MEDIATION CONFERENCE Istanbul, March 2011 George.
Inspire Risk Management Limited Apartment Block Complexes “the associated issues and there links to insurance” Presented to Paul.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Managing property losses, from the first report of a loss until the completed Certificate of Occupancy and final payment to our client (insured). Professional.
ZAPDOR
1 Introduction to Security Chapter 5 Risk Management: The Foundation of Private Security.
HKZ-ISO certification in Dutch Healthcare and Welfare Matra Pre-accession project October 11, 2004.
Mobile Solutions in Construction industry! “Technology has no value unless it brings added value to the process” Marcus Wiksten Project Manager Solutions.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Management & Development of Complex Projects Course Code - 706
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Joint Venture in construction company in West Bank.
Ambis arquitectura offers professional services of: -Building Engineering -Project Management to: -Particulars -Companies Neibourhood associations -Other.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
SOUTH EAST PLAN South East Plan ESPACE - reminder Aim Incorporation of adaptation to climate change within spatial planning mechanisms at local, regional,
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Specification & Quantities Estimating
1. 2 Today’s Presentation The City of Baltimore Water and Wastewater Systems Challenges facing the City The Strategic Planning Initiative So Where Are.
STRATEGIC PLANNING AND THE WAY FORWARD – REFLECTIONS ON TURBULENCE AND VISION 2020 By TREVOR M.A.FARRELL.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Canadian Environmental Legislative David Hunter B.A., LL.B., LL.M. Bennett Jones LLP Presentation to: Fachbereich 1 Architektur, Bauingenieurwesen, Geomatik.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
BIM Toolkit Content Outline An unusual project Existing content Areas to add Methodology Gap analysis LOD / LOI aligned to stages of plan of work Content.
Minimum Set of Requirements for Suppliers
Façade Management Consulting
Uniper Energy Services
Minimum Set of Requirements for Suppliers
Architecture, Civil Engineer, and Interior Designer
Republic of Albania: Linking Public Sector and HD Strategies
Scaling up Development
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
RIBA Plan of Work 2013.
INTRODUCTION The company has been founded by a group of senior professionals having immense technical knowledge and experience in the respective fields.
Welcome To intelBUILD Architecture & Engineering Services “3D interior , Exterior Designing Studio ” , Andheri west, Mumbai India
Results-oriented Monitoring
4th Annual Construction Law Summit
Introduction to Construction Insurance
Joint investment of Telecom and Energy Providers
National System and QA/QC: The Netherlands
Cebus Rimon Industrialized Construction Ltd
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
RIBA Plan of Work 2013.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft

Technical Control Bureau for Construction General situation of the construction sector: Non quality Failures and damages Direct and indirect costs Design & works period cuts Modifications & adaptations Black box calculations Subdivision of the works & lack of global approach Structures & codes complexity Coordination & communication default First price & far after quality : short time view

Technical Control Bureau for Construction Origin of the damages

Technical Control Bureau for Construction Failure & damages : From watertightness to stability, across infrastructure or superstructure, soil conditions, phasing or structure assembly... Cost of the non-quality 10-15% of the global investment ! (Based on European studies)

Technical Control Bureau for Construction Some examples :

Technical Control Bureau for Construction Some examples :

Technical Control Bureau for Construction How to reduce failures and damages? How to manage these risks ? Commissie Dekker:

Technical Control Bureau for Construction How to reduce failures and damages? How to manage these risks ? Commissie Dekker: CUR Commissie:

Technical Control Bureau for Construction How to reduce failures and damages? How to manage these risks ? Commissie Dekker: CUR Commissie: Neprom:

Technical Control Bureau for Construction How to reduce failures and damages? How to manage these risks ? The sector The builders, public and private owners (Engineers, Architects, Contractors) are looking for more confidence (an insurance) The insurance Requirement of a second opinion. Aim  Reduce failures and damages by a global prevention action  Design, calculations  Execution, materials

Technical Control Bureau for Construction SECO Founded in 1934 by the sector as : –Cooperative association –Independent technical board –Independent third party –Recognized by the (Re) Insurance companies Belgian leader also active in more than 20 countries More than 3 billions EUR of current works supervised Turnover : 22 millions EUR 500 to 700 new projects per year (about projects) 200 persons (160 engineers)

Technical Control Bureau for Construction A preventive technical supervision Concept and design Basic principles (soil and subsoil analysis, choice of foundations, stability...) Tender documents Detailed drawings Parallel calculations performed by SECO Execution on site and in workshops Regular visits Critical phases Quality of the materials Voluntary certification Inspection in factories

Technical Control Bureau for Construction Reduction of technical risks Some examples Railway Station: Communication

Technical Control Bureau for Construction Reduction of technical risks Some examples Bridge: Calculations

Technical Control Bureau for Construction Reduction of technical risks Some examples Tunnel: Execution

Technical Control Bureau for Construction Reduction of technical risks Some examples Building: Design

Technical Control Bureau for Construction Reduction of technical risks Some examples Bridge: Design - joints

Technical Control Bureau for Construction Reduction of technical risks Some examples Tunnel DesignExecution

Technical Control Bureau for Construction Reduction of technical risks Some examples Renovation

Technical Control Bureau for Construction Reduction of technical risks Some examples Buildings - Steel Structures

Technical Control Bureau for Construction Philosophy and methodology of SECO Not compulsory in the Netherlands  importance of a real adapted service: “Think and bring added value for the client; give confidence” Financial & technical independence Very high level specialists with large experience Team work for each project Risk analysis & quick Scan: critical points identification and strength on project weakness, prevent the repetition of similar errors Efficiency based on internal knowledge analysis and large experience (Expert System, sharing of know-how) “Problem solvers” spirit

Technical Control Bureau for Construction Our services Two main sectors of activities Buildings Main fabric Shell and finishing works Light facades and external joinery Timber and steel structures Technical installations Sustainable construction : support and assessment Valideo and Breeam Civil Engineering Bridges and viaducts Towers, chimneys, pylons Tunnels Roads and runways Ports and quay walls Water treatment plants and sewage networks Landfills

Technical Control Bureau for Construction The Inherent Defects Insurance (10 years) Who Constructors (Contractors & sub contractors), Architects, Consulting Engineers, Developers About Buildings and Civil engineering works Cover Structures (stability) & Majors parts (roofs, facades,...)

Technical Control Bureau for Construction The Inherent Defects Insurance (10 years) implemented in the Netherlands Cover  material damages to the works (structure & major parts)  damages causes to third parties  possible extension to finishing works & services Collective insurance policy : no recourse against faulty parties Linked to the works, not the insured parties (one premium) Voluntary system (add value essential)

Technical Control Bureau for Construction Ir. Wim Hoppenbrouwers SECONED B.V. Mathenessestraat EA Breda Postbus EW Breda T +31 (0) F +31 (0)