Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
Santa Maria River Bridges Widening. Project Location.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
STA Safety Project PID #76439 December 12, 2006.
Safe Road Infrastructure George Mavroyeni – Executive Director, Major Projects (former Executive Director, Road Safety and Network Access) May 2011.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Project Information Meeting / Open House Wednesday, September 17, :00 – 8:00 PM Agenda 6:00 to 6:30 View Project Displays 6:30 – Presentation and.
Alameda Creek Bridge Replacement Proposed Alternatives December 5, 2013 Gary Pursell District Division Chief, Design East.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
5/8/02FHWA Office of Safety1 Funding Resources for Highway Safety (FY2001 Fed-Aid) $1.4 $5.6 Min. Guarantee Bridge Surface Transp. Program National Hwy.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
The I-465 West Leg Reconstruction Project
Hesperian Boulevard Corridor Improvement Project San Lorenzo
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Highway 169 Bridge Replacement & Pavement Resurfacing
West Hills Road Projects Update
S.R. 26 Road Rehabilitation in Clinton County
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014

Scoping Meeting Process Caltrans is asking public agencies, local governments, elected officials and the public what the scope of the environmental document should be. “Scope” includes: What analysis is appropriate? What alternatives should be considered? Potential mitigation strategies? What resources and potential impacts should be evaluated?

Niles Canyon – Short Term Projects ALA – 84 From Mission Blvd. to I-680 Construction: Summer Summer 2016 * Install sharrows * Install delineators * Install pavement markings Alameda Creek Bridge Replacement Project ALA – 84 Draft environmental doc for public review: Late 2014 Construction Schedule: Summer 2017 – Late 2018 * Replace bridge. Niles Canyon – Medium Term Projects ALA – 84 From Mission Blvd. to I-680 Draft environmental document for public review: Fall 2014 Construction: Early 2017 to late 2018 * Limited shoulder widening at 3 locations * Replace railings at Alameda Creek Bridge Overhead * Fixed objects removal (trees and utility poles) * Install traffic signals at Pleasanton/Sunol Road and Main Street intersections * Dynamic warning system * Active ramp system * Install speed feedback system * Install metal beam guardrails

Project Goal and Needs Project Goal: provide a bridge structure that meets current design standards Project Needs: based on concerns over the out-of-date structural design of the bridge and the following factors: 85-year old bridge Narrow bridge that lacks standard shoulders

Project Goal and Needs Project Needs (continued)… Bridge railing does not meet current design standards Roadway approaches are too sharp for current design speed Roadway alignment does not provide sufficient sight distance

Proposed Improvements New bridge meets seismic standards with an expected 100+ year service life Standard shoulders allow room for disabled vehicles and provide safer access for bicyclists Updated bridge railings provide safety improvements for both motorists and bicyclists alike Realigned roadway provides safer approach curves. Removes obstructions in Alameda Creek

Design Considerations Service Life of Replacement Bridge: 100+ years Project will not increase capacity New bridge will provide a 12-foot lane and an 8-foot shoulder in each direction Design speed standard for this type of facility is typically 50mph The posted speed limit in the corridor however, is 45mph. Alternatives proposed for the project will be designed to 45mph.

Funding & Schedule Funding: By the State Highway Operations and Protection Program (SHOPP) Construction cost is estimated at $30 Million Schedule: Draft Environmental Document available for public review: Late 2014 Final Environmental Document Completion: Fall 2015 Design Completion:Late 2016 Construction Begin: Mid 2017 Construction End:Late 2018

Alternatives Background Alternative 1 Developed during planning phase Includes embankment fill and two retaining walls, one with rock slope protection Alternative 2 Developed during value analysis (VA) study that reviewed 8 different alternatives Includes three retaining walls, one with rock slope protection

Alternatives Background Alternatives Background (continued) Alternative 3A Developed during FHWA-led Roadway Safety Assessment (RSA) Includes an embankment, one retaining wall and a 1,100-foot long viaduct Alternative 3B Developed after reviewing stakeholders recommendations from the stakeholders meeting in 2013 Includes an embankment, one retaining wall and a 400-long viaduct

Alternative 1

Alternative 2

Alternate 3A

Alternative 3B

West Approach - Existing Condition

Conceptual Rendering – Concrete Texas Rail

Conceptual Rendering – Steel Rail

Questions & Comments