Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
35% 65% 73% are % HH Income of $100k 50% college educated 25% own 70% rent 76% single 20% married 84% African- American 39% live in PG County 24%
World History The Basics. What is history? It is a record of past actions of humankind, based on surviving evidence. (Stories of the past.) If historys.
Math 2/27/2012 Use the additive inverse rule to change subtraction to additions and the second number to its opposite for each of the following
By P.Kandasamy BTE – K= empirical seasonal consumptive use coefficient for the growing season F= sum of the monthly consumptive use (f) for the.
K-14 Education Spending and the Budget Shortfall Comparison of State General Fund Revenue and Expenditure Increases to Increases in K-14 (Prop. 98) Guarantee.
To celebrate the launch of LEO Special promotion.
Portland Water Bureau Upcoming CIP Projects
Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)
Addition and Subtraction Equations
Beat the Computer Drill Multiply 7s Becky Afghani, LBUSD Math Curriculum Office, 2004.
Example:                                         Calculate how many squares altogether (2 x 5 = 10)
1.Click Reports>Request>Financial 2.Select Individual Reports 3.Click OK Running Report CU1010 Analysis Balance Report.
Training Objective: students will be able to evaluate expressions using the order of operations.
The basics for simulations
Thermal Elements Jake Blanchard Spring Thermal Elements These elements calculate temperatures in solids There are 1-D, 2-D, and 3-D elements All.
Created by Mr. Lafferty Maths Dept.
Progressive Aerobic Cardiovascular Endurance Run
Do Now 10/9/09 Take out HW from last night. Take out HW from last night. Text p. 70, #1-8 all Text p. 70, #1-8 all Text p. 77, #1-10 all Text p. 77, #1-10.
Before Between After.
The Effect of Peloid Application in Out-patient Setting on Knee Osteoarthritis Results of a Pilot Study E Odabaşı, R Tekin, H Erdem, İ.Şimşek, M Turan.
Design and Simulation of the Attitude Determination and Control System for LightSail-1 Matt Nehrenz.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
One step equations Add Subtract Multiply Divide Addition X + 5 = -9 X = X = X = X = X = 2.
What NSSE Tells Us About Student Work and Student Success Gary Pike Information Management & Institutional Research.
Let’s Add! Click the cloud below for a secret question! Get Started!
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Test practice Multiplication. Multiplication 9x2.
Arnd Meyer (RWTH Aachen) Jan 23, 2004Page 1 Data Taking Jan 16 – 23 Store # BeginLum [cm -2 s -1 ]Duration 3175Fri Jan 16 16:23 4.5E hrs 3177Sat.
Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E hrs 3125Sat 23:414.2E31.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Arnd Meyer (RWTH Aachen) Feb 25, 2004Page 1 Status of Data Taking Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting February 25 th, 2004.
Plan for Jan. to Mar. Dec. 11, 2005 M. Komatsu. Current status We have no manpower after end of Dec. –Nonoyama should finish his master thesis. New Muon.
Arnd Meyer (RWTH Aachen) Dec 4 th, 2003Page 1 Tevatron and DØ Status and Plans Arnd Meyer, RWTH Aachen DØ Germany Meeting December 4 th, 2003.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
Paul Balm - EPS July 17, 2003 Towards CP violation results from DØ Paul Balm, NIKHEF (for the DØ collaboration) EPS meeting July 2003, Aachen This.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Путешествуй со мной и узнаешь, где я сегодня побывал.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
PB 26 GRAPHICS.
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
The Silicon Track Trigger (STT) at DØ
Density Concept Questions.
مديريت موثر جلسات Running a Meeting that Works
STORE MANAGER RESPONSIBILITIES.
A. Kaminskiy, CMS Tracker week , Apr 2004

Presentation transcript:

Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon Al ItoCentral MuonFritz / GeoffControls JeffL1MuonBrendanLuminosity Stefan / BrigitteCTTMike S.FPD MiroslavL2

Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 2 Store 3118 (Dec 31) Initial Lum cm -2 s -1 STT out BLS PS trip Special runs (CTT, Muon)

Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 3 Store 3120 (Dec 31 – Jan 1) Initial Lum cm -2 s -1 Take STT out, SMT HDI problem MDT problem

Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 4 Store 3122 (Jan 1 – 2) Initial Lum cm -2 s -1 Multiple crate x51 downloadsSMT trip STT (in, one out, all out) Efficiency: Dec 31 st 77% (0.70/0.91 pb -1 ) Jan 1 st 87% (1.34/1.55 pb -1 )