Vestas.com Wind Energy in Poland – Potential, Prospects and Pitfalls A presentation for the joint seminar by demosEuropa and the Danish Embassy in Warsaw.

Slides:



Advertisements
Similar presentations
Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives.
Advertisements

DG Energy and Transport, European Commission Fabrizio Barbaso 16/04/2008 EU ENERGY SECURITY STRATEGIES ARF Energy Security Seminar EUROPEAN COMMISSION.
Information - CommunicationDirectorate general for Energy and Transport European Commission ECCP II Stakeholders` Meeting 24 October 2005 Luc Werring Principal.
Baltic Energy Market Interconnection Plan (BEMIP)
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Energy Policy and Scotland’s Constitutional Future Setting the Scene John Paterson University of Aberdeen.
Study Project The Countries and Capitals of the European Union.
The work of European energy regulators on generation adequacy FTS-CEER workshop on Regulatory Aspects of Power Capacity Markets 7 February 2012.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Progress in the Electricity and Gas Single.
Putting Teeth in the Renewables Directive David Toke, Senior Lecturer in Environmental Policy, University of Birmingham.
1 Ministry of Environment, Energy and Climate Change of the Hellenic Republic Project Helios The Greek Solar Energy Project Hamburg, 5 th September 2011.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
F Irish Implementation of Art. 16 of the Renewable Energy Directive – a long road to where? Joanne Finn Head of EU, Competition & Regulated Markets Thursday,
Vestas.com Condition Based Maintenance of Vestas Offshore Turbines European Offshore Wind Conference & Exhibition 2009, Stockholm Jacob Juhl Christensen,
European Long-Term Growth and the Euro Crisis Uri Dadush New York University, Stern School of Business October 8,
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
Vestas.com How Can Offshore Wind Contribute To The European Energy Portfolio? Uffe Vinther Schou, Sales Director, Vestas Offshore A/S.
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
VI. KAZENERGY Eurasian Forum Wind energy development in the emerging markets including Kazakhstan Andreas Thomas, Senior Vice President Business Development.
FRANCE RE PRODUCTION 2009/2013 Eurobserver 2014 Wind power energy France has the third wind power production rank in the EC. yearsCapacity MWOUTPUT twh.
EUFORES Workshop – Lithuanian Parliament … Vilnius, April 22 nd, 2013 … Slide 1 > Renewable energy sources in Lithuania.
Information - CommunicationDirectorate general for Energy and Transport European Commission The situation of the Directive on electricity from renewable.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Information - CommunicationDirectorate general for Energy and Transport European Commission Status of the Directive on the promotion of RES-Electricity.
Swedish Renewable Energies Association Christer Söderberg 0710 HYDRO 2007 GRANADA, SPAIN 16 OCTOBER, 2007 SHERPA PROJEKT Christer Söderberg.
Electricity Market Design Presentation at the 31st USAEE/IAEE North American Conference November 5-7 Austin, Texas Lars Bergman IAEE and Stockholm School.
EUROPE’S ENERGY EXPORTER Neart na Mara. source EWEA.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools.
Deep Geothermal Energy in Europe Barriers for market development Philippe Dumas, Manager, European Geothermal Energy Council 23/03/ VILNIUS.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
1 Rue d'Arlon B-1040 Bruxelles Belgium Web: The Rise of Solar Thermal Energy for heating and cooling in Europe.
CEOC Conference EU Energy Policy “New Challenges for Third Party Inspection and Certification Bodies” Warsaw 30 th May 2011 Development of Renewable Energy.
Countries of Europe France Spain Italy Germany Which country is this?
1 | Wind in British Columbia Wind in British Columbia Generate 2010: Getting It Built November 8, 2010 Title slide/end slide image dimensions: Title slide.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
1 8 th Meeting 13, 14, 15 June 2005 Oulu – Finland Marinus Verweij, MD Chairman EuHPN.
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Vestas.com Wind Power Plant Dynamic Reactive Power “Hybrid” Solutions to meet ERCOT Reactive Power Capability Requirements Presented at ERCOT ROS Meeting,
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Mr Martin Crouch, ERGEG Electricity Regulatory Forum 2009 Florence, 5 June 2009 Status Review of Sustainable Development in the Energy Sector.
IFIEC Europe International Federation of Industrial Energy Consumers 1 Promotion of Renewable Energies in the EU Member States Consequences on the Price.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
European Energy Research Alliance Cork April 12 Henry Jeffrey Institute for Energy Systems EERA and EERA Ocean Energy.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
FRANCE RE PRODUCTION 2009/2013 Eurobserver WIND POWER ENERGY France has the third wind power production rank in the EC. yearsCapacity MWOUTPUT twh.
ORFEUS finances (1) Budget 2010/2011 specification 2011 budget 2010 rev budget 2010 budget 2009 budget corporate founders102,000 €97,000 €102,000.
Regional Initiative Progress and Next Steps Graeme Steele.
Vestas.com Texas/European Union Wind Energy Symposium October 2009 Dr. Carsten Hein Westergaard Vestas Technology R&D Americas, Inc.
The renewables Directive 1.Sets mandatory national targets for renewable energy shares, including 10% biofuels share, in 2020 (Articles 3 and 5) 2.Requires.
Data Presentation Data Presentation Frances A. Pfab.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Budapest, September 28-29, 2004 RES – E market developement in Poland.
INTERNATIONAL BUSINESS Unit 2 Business Development GCSE Business Studies.
ENERGY AND WATER REGULATORY COMMISSION
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
Template for country interventions (5 min)
The role of renewable energy sources in Austria Günter Pauritsch Workshop on renewable energy sources Sofia, 21 December 2011 Austrian Energy Agency.
Urban Waste Water Treatment Directive
DG Environment, Unit D.2 Marine Environment and Water Industry
GIE Annual Conference Bratislava, September 2006
Baltic Energy Market Interconnection Plan (BEMIP)
The work of European energy regulators on generation adequacy
Renewable energies in Russia
HEALTH EQUITY EUROPE JOINT ACTION
Outline of the EU greenhouse gas emission trend report
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE
Presentation transcript:

vestas.com Wind Energy in Poland – Potential, Prospects and Pitfalls A presentation for the joint seminar by demosEuropa and the Danish Embassy in Warsaw by Kenneth Kolvits, Head of Vestas Poland 19 November 2008

2 | Presentation title, September 9, 2015September 9, 2015 Agenda 1.Wind Potential in Poland 2. Installations, Share of Wind in Electricity Mix and Comparisons 3.What Hampers Poland in Exploiting its Potential?

3 | Presentation title, September 9, 2015September 9, 2015 Wind Atlas Poland Source: GreenMax, 2008

4 | Presentation title, September 9, 2015September 9, 2015 Wind Potential/Prospects in Poland EER: 5-6 GW by 2020 (EER Country Analysis) PWEA: 13,5 GW by 2020 (PWEA Assessment of Wind Energy Development Opportunities) BTM: 3,4 GW by 2012 (World Market Update 2007) ”Due to excellent wind conditions (…), Poland is one of the most promising wind energy markets in Europe. The country possesses plenty of potentially profitable locations and great development possibilities” (European Bank for Reconstruction and Development in 2004)

5 | Presentation title, September 9, 2015September 9, 2015 Installed Wind Power Capacity in the EU (total end 2007 in MW) Germany22,247 MW Spain15,145 MW Denmark3,125 MW Italy2,726 MW France2,454 MW UK2,389 MW Portugal2,150 MW Netherlands1,746 MW Austria982 MW Greece871 MW Ireland805 MW Sweden788 MW Norway333 MW Belgium287 MW Poland276 MW Source: GWEC, 2008

6 | Presentation title, September 9, 2015September 9, 2015 Wind penetration per capita in 2007: Poland one of the lowest figures in the EU

7 | Presentation title, September 9, 2015September 9, 2015 Share of Wind in Electricity Generation

8 | Presentation title, September 9, 2015September 9, 2015 Despite Great Resources and International Requirements, Poland is Lagging Behind Indicative RES-E target: 7,5 % of electricity shall be met by renewable energy sources by 2010 (Directive 2001/77EC) Proposed mandatory RES-target of Draft European Directive of January 2008: 15 % of gross final energy consumption shall come from renewable energy ”Progress towards the RES-E target in Poland is low.” (European Commission, DG Energy and Transport 2008)

9 | Presentation title, September 9, 2015September 9, 2015 What Hampers Poland? 2 Main Barriers for Polish Wind Energy Development 1. Grid Infrastructure and Connection A)Insufficient grid infrastructure in Northern Poland, where best resource is According to PSE: 1,120 km of new HV lines and 5 new substations needed by 2020 B) Obtaining grid connection - SOs have 3- to 5-year infrastructure development plans, but investment priorities often change (i.e. Need to repair existing line before building new one) - Lack of coordination between different DSOs and TSO - Connection conditions (CCs) are sometimes hard to meet, i.e. very high transmission fees - In theory, CCs lapse after 2 years; in practice, not the case → capacity reserved on grid for projects that might not get built (many not viable projects hold CCs) blocking other projects: Thus, new projects stuck in connection queue Source: EER, 2008; Green Max, 2008 and PSE, 2008

10 | Presentation title, September 9, 2015September 9, 2015 What Hampers Poland? 2 Main Barriers for the Wind Energy Development 2. Complex process of development procedures Time consuming and relative complex set of procedures for the projects to obtain zoning plan Time consuming and complex procedure for environmental analysis in order to obtain the approval for wind energy Few and/or insufficient resources and knowledge to ease the process

11 | Presentation title, September 9, 2015September 9, 2015 To sum up: Poland has a huge resource and its overall regulatory framework makes it an attractive market However, barriers hamper wind energy development in Poland and should be removed as soon as possible When barriers removed, Poland expected to be able to exploit full potential and comply with international obligations Vestas believes in the Polish market and remains strongly committed

vestas.com Thank you for your attention Kenneth F. Kolvits, Head of Vestas Poland Copyright Notice The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.