POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.

Slides:



Advertisements
Similar presentations
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
Advertisements

FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
Line Efficiency     Percentage Month Today’s Date
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
W E L C O M E Power Grid Corporation of India Limited.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
LOAD FORECASTING T SRINIVAS MANAGER SRLDC. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK DETAILS.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
POWER GRID CORPORATION OF INDIA LTD
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
ENERGY CONSERVATION IN SR - A CASE STUDY
Jan 2016 Solar Lunar Data.
Hon’ble Commission has issued Interim order dated 19/ directing :
NARROWING OF FREQUENCY BAND – IMPLICATIONS THEREOF
Average Monthly Temperature and Rainfall
ABT & Frequency.
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Presentation transcript:

POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES

POWER SUPPLY POSITION FOR THE PERIOD FROM OCT 06 TO FEB 07 MAXIMUM DEMAND MET: STATE WISE MAXIMUM DEMAND MET: MWMUs CURRENT YEAR 23, LAST YEAR 23, AGENCY Current Year (MW) Last Year (MW) Current Year (MUs) Last Year (MUs) ANDHRA PRADESH 8,1588, KARNATAKA 5,7585, KERALA 2,6692, TAMIL NADU 8,3197,

FREQUENCY SPECTRUM FROM OCT 06 TO FEB 07 (UPTO 12 TH FEB 07) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.0HZ>50.2HZ>50.5 HZ Oct Nov Dec Jan Feb-07 (upto 12 th )

Date: 17th October 2006 PRESS RELEASE CERC directs PowerGrid to ensure grid stability 1. In order to take action for violating the Indian Electricity Grid Code (IEGC) by drawing electricity in excess of their schedule drawal, the Central Electricity Regulatory Commission (CERC) has directed PowerGrid to furnish the list of States and their quantum of overdrawals in the time-blocks when the frequency in the extended Central Grid was below 49.0 Hz during the period 9th to 15 th October The Commission has further directed all the RLDCs to keep a strict watch over the Grid Code violations, which can possibly endanger the grid stability and promptly inform the Commission about the defaulters with appropriate recommendation regarding remedial action. 3. The maintenance of satisfactory grid frequency has assumed added importance after synchronization of Northern Regional Grid with Central Grid comprising Western, Eastern and North-Eastern Regional Grids. In this context, the IEGC requires that the various beneficiary States shall always endeavor to restrict their net drawal from the grid to their respective drawal schedules, whenever the system frequency is below 49.5 Hz and when the frequency falls below 49.0 Hz, the requisite load shedding shall be carried out by the concerned State to curtail its over drawal. S. K. Chatterjee Assistant Secretary

STATE OVER <49.0 & 49.5HZ FOR OCT & DEC 2006 STATE No of Blocks O/D Mus < 49.0Hz AVG MW No of Blocks O/D Mus < 49.5Hz AVG MW AP KAR KER TN PONDY GOA

326(31%) TIME BLOCKS FREQ WAS BELOW 49Hz 1014(96%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz State No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn TAMIL NADU 293 (28%) (60%) KARNATAKA 247 (23%) (83%) ANDHRA PRADESH 132 (13%) (46%) PUDUCHERRY 235 (22%) (46%) GOA 77 (7%) (22%)3246 KERALA 5 (0%) (16%)97123 STATE OVER <49.0 & 49.5HZ JAN 01 – 11, 2007

74(8%) TIME BLOCKS FREQ WAS BELOW 49Hz 870(91%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz State No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn TAMIL NADU 54 (6%) (33%) KARNATAKA 65 (7%) (86%) ANDHRA PRADESH 30 (3%) (56%) PUDUCHERRY 9 (1%)16773 (8%)1719 GOA 31 (3%) (34%)84110 KERALA 18 (2%) (47%) STATE OVER <49.0 & 49.5HZ JAN 12 – 21, 2007

76(11%) TIME BLOCKS FREQ WAS BELOW 49Hz 646(96%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz State No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn TAMIL NADU 41 (6%) (28%) KARNATAKA 65 (10%) (85%) ANDHRA PRADESH 57 (8%) (64%) PUDUCHERRY 4 (1%)4411 (2%)155 GOA 19 (3%) (15%)1134 KERALA 8 (1%) (43%)88812 STATE OVER <49.0 & 49.5HZ JAN 22 – 28, 2007

53(8%) TIME BLOCKS FREQ WAS BELOW 49Hz 601(89%) TIME BLOCKS FREQ WAS BELOW 49.5 Hz State No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn No.of time blocks in which state overdrew MWH Overdrawal Average MW overdrawn ANDHRA PRADESH 24 (4%) (57%) KARNATAKA 44 (7%) (85%) KERALA 14 (2%) (49%) TAMIL NADU 32 (5%) (27%) PUDUCHERRY 8 (1%)16858 (9%)14510 GOA 29 (4%) (42%)79411 STATE OVER <49.0 & 49.5HZ JAN 15 – 21, 2007

STATE No. of Time Blocks (overdrew) MWH Overdrawa Average MW overdrawn TAMILNADU KARNATAKA ANDHRA PRADESH PUDUCHERRY GOA KERALA 000 Summary of ODs at Freq. LT 49 HZ. During the week STATE No. of Time Blocks (overdrew) MWH Overdrawa Average MW overdrawn TAMILNADU KARNATAKA ANDHRA PRADESH PUDUCHERRY GOA KERALA TO TO STATE No. of Time Blocks (overdrew) MWH Overdrawa Average MW overdrawn KARNATAKA ANDHRA PRADESH TAMILNADU PUDUCHERRY KERALA GOA TO

STATE No. of Time Blocks (overdrew) MWH Overdrawa Average MW overdrawn ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDUCHERRY GOA Summary of ODs at Freq. LT 49.5 HZ. During the week STATE No. of Time Blocks (overdrew) MWH Overdrawa Average MW overdrawn ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDUCHERRY GOA TO TO STATE No. of Time Blocks (overdrew) MWH Overdrawa Average MW overdrawn ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDUCHERRY GOA TO

STATE No. of Time Blocks for which State overdrew below 49 Hz. MWH Overdrawal below 49 Hz Average MW overdrawn below 49 Hz ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDUCHERRY GOA Summary of ODs at Freq. LT 49 HZ. During the week TO STATE No. of Time Blocks for which State overdrew below 49.5 Hz. MWH Overdrawal below 49.5 Hz Average MW overdrawn below 49.5 Hz TAMILNADU KARNATAKA ANDHRA PRADESH PUDUCHERRY GOA KERALA Summary of ODs at Freq. LT 49.5 HZ. During the week TO

Message TypeBrief Details Type ACaution Message when constituent overdraws at frequency <49.2 Hz. (issued in line with IEGC clause 6.4.4) Type BViolation Message when constituent overdraws at frequency <49 Hz. (issued in line with IEGC clause 6.4.4) Type CViolation Message when constituent continues to overdraw at frequency <49.0 Hz., in spite of RLDC’s instruction to terminate the over drawal (issued in line with IEGC clause and Section 29(2) of I.E. Act 2003)

AVAILABILTY OF GENERATION IN NLC AND NPC STATIONS NEYVELI TS 2 NEYVELI TPS I (EXP) NPC, MAPS NPC, KAPS MONTHS Installed Capacity (Ex-bus) Average available generation (Ex-bus) Average available generation (%) Apr May Jun Jul Aug Sep Oct Nov Dec Jan MONTHS Installed Capacity (Ex-bus) Average available generation (Ex-bus) Average available generation (%) Apr May Jun Jul Aug Sep Oct Nov Dec Jan MONTHS Installed Capacity (Ex-bus) Average available generation (Ex-bus) Average available generation (%) Apr May Jun Jul Aug Sep Oct Nov Dec Jan MONTHS Installed Capacity (Ex-bus) Average available generation (Ex- bus) Average available generation (%) Apr May Jun Jul Aug Sep Oct Nov Dec Jan

TYPICAL DAY UI IMPORT FROM CENTRAL GRID 23 rd OCT 2006

TYPICAL DAY UI IMPORT FROM CENTRAL GRID 24 th OCT 2006

TYPICAL DAY UI IMPORT FROM CENTRAL GRID 4 th FEB 2007

TYPICAL DAY UI EXPORT TO CENTRAL GRID 4 th NOV 2006

IR EXCHANGES OF SR IN THE FORM OF UI TILL (214 WEEK) TRANSACTION WITH WR TRANSACTION WITH ER Energy Imported 928 MU (IMPORT BY SR) 994 MU (IMPORT BY SR) Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 86 Cr.Rs. 70 Cr. Energy Exported767 MU (EXPORT BY SR) 453 MU (EXPORT BY SR) Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 77 Cr.Rs. 52 Cr.

IR EXCHANGES OF SR IN THE FORM OF UI FROM TO (44 WEEK) TRANSACTION WITH WR TRANSACTION WITH ER Energy Imported 181 MU (IMPORT BY SR) 152 MU (IMPORT BY SR) Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 42 Cr.Rs. 35 Cr. Energy Exported113 MU (EXPORT BY SR) 140 MU (EXPORT BY SR) Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 30 Cr.Rs. 27 Cr.

IR EXCHANGES OF SR IN THE FORM OF UI FROM TO (18 WEEK) TRANSACTION WITH WR TRANSACTION WITH ER Energy Imported 54 MU (IMPORT BY SR) 58 MU (IMPORT BY SR) Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 28 Cr. Energy Exported24 MU (EXPORT BY SR) 59 MU (EXPORT BY SR) Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 26 Cr.Rs. 22 Cr.

FREQUENCY SPECTRUM FOR < 49.0 HZ < 49.5 HZ < 50 HZ HZ >50.2 HZ >50.5 HZ Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Avg

FREQUENCY SPECTRUM FROM APRIL 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Apr May Jun Jul Aug Sep Oct-06 (upto 20 th )

POWER SUPPLY POSITION FOR , & MAXIMUM DEMAND MET: STATE WISE MAXIMUM DEMAND MET: MWMUs 2006 – 07 (Upto Feb 07) 23, – 06 23, – 05 22, AGENCY 2006 – 07 (MW) 2005 – 06 (MW) 2004 – 05 (MW) 2006 – 07 (MUs) 2005 – 06 (MUs) 2004 – 05 (MUs) ANDHRA PRADESH 8,2818,2397, KARNATAKA 5,7585,5585, KERALA 2,6692,5782, TAMIL NADU 8,3718,2097,