1 LITHUANIAN POWER SECTOR Dalius Šulga Director of Energy Development Department Lietuvos Energija AB Vilnius, 2007.

Slides:



Advertisements
Similar presentations
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
Advertisements

Baltic Energy Market Interconnection Plan (BEMIP)
VIEW TO CO2-EMISSIONS IN THE BALTIC STATES THROUGH REORGANIZATION OF ENERGY INFRASTRUCTURE Gintaras DENAFAS Department for Environmental Engineering, Kaunas.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
1 Strategy of electric power industry development in Russia for the period up to Director of OJSC «ENIN», Academician of RAS Eduard P. Volkov.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
Donors’ Conference on Sustainable Energy for Kosovo
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Olje- og energidepartementetwww.oed.dep.no The energy sector and policy challanges in Europe. Viewpoints from Norway Johan Vetlesen Deputy Director General.
AEEC Meeting Brussels Tomasz Jackowski, Poland Department of Nuclear Energy Ministry of Economy Perspective of Nuclear Energy in Poland.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
EU Energy Strategy
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
BALTIC RING STUDY From the beginning of 1996 to early 1998, 18 power companies and utility organizations from the 11 countries around the Baltic Sea have.
Märt Ots Estonian Competition Authority Baltic Electricity Market Fora Vilnius Latest developments in Estonia.
www.eksponente.lt Study on perspectives of main grid network interconnection between countries and with potential wind parks Perspectives.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Naujos galimybės pastačius naujas elektros jungtis ir SGD terminalą New opportunities after construction of new interconectors and LNG terminal prof. Jurgis.
Europe goes Offshore with Wind Farms Hermann J. Koch Senior Member IEEE Substations Committee Vice Chairman Siemens Energy Sector Transmission Erlangen,
Euroheat & Power 21 October Heating Sector Institutional Reform in the Former Soviet Union Baku, 21 October 2005 Challenges in Liberalisation of.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Turkish Power System Overview March 2012
Ideas for liberty The Energy Challenge for Europe – and Lithuania Vilnius, 21 October 2008 Carlo Stagnaro Director, Research & Studies Istituto Bruno Leoni.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
0 Rymantas Juozaitis Director General Lietuvos energija AB PAN BALTIC PPP CONFERENCE-SEMINAR Vilnius, November 2006 POWER SECTOR OF LITHUANIA and.
Lithuanian energy independence strategy: main achievements and remaining challenges Rokas Masiulis Minister of Energy
Presentation by Greta Monika Tuckute
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
1 ENERGY INDUSTRY OF LITHUANIA Rymantas Juozaitis Chairman of Lithuanian Member-Committee of WEC Vilnius October 5, 2005.
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Is there a need for a change?
Vytautas Stasiūnas Lithuanian District Heating Association President 21 October, 2005 International conference “Heating Sector Institutional Reform in.
Conference “RAO “UES of Russia” is an Open Company. On the Threshold of the Reform” 11 December,2001 Moscow Vice-Chairman of the Management Board, RAO.
Märt Ots Estonian Competition Authority Baltic Electricity Market Forum Riga Latest developments in Estonia.
INTERREG IIIC - REGENERGY Gefördert durch die Europäische Union Promoted by the European Union European District Heating and District Cooling Market Berlin/Leipzig,
WHY TO PROMOTE LOCAL ENERGY RESOURCES? 1 LAEF Latvia Renewable Energy Federation Riga, June 18, 2015.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
1 ELECTRICITY REGIONAL INITIATIVE BALTIC REGIONAL ELECTRICITY MARKET Dace Bite Public Utilities Commission Latvia Creating a Single European Energy Market.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
POWER SECTOR, ENERGY RELATED RESEARCH POTENTIAL in LITHUANIA by dr. Anzelmas Ba čauskas Lietuvos energija AB, Lithuania CENTRAL-EASTERN EUROPEAN ENERGY.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Development of electricity market in Lithuania 2010 Lina Skrabutėnaitė Baltpool UAB Kuressaare
Lithuanian Electricity Supply Assignment #3 to be announced February 17, due March 8 MS&E 290.
Workshop on Energy – Framework of the WS Moderator - Eugenijus Ušpuras, Lithuanian energy institute “The Baltic Sea Strategy – Region and Cohesion Policy.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
Energy sector regulation in Estonia Märt Ots Director General, Estonian Competition Authority 15th Anniversary Conference Tallinn
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
Ojārs Kehris Economist Association 2010 President Energy market and security of supply in the Baltics – Latvia, Lithuania, Estonia Reforming Infrastructure.
ASEM MINISTERIAL CONFERENCE on Energy Security Tensions and Opportunities of Energy Security in the Baltics Vytautas Naudužas 18 th of June, 2009 Brussels.
Towards 100% RE in Denmark in 2050 Jakob Jespersen Danish Energy Agency Hai Phong, 17 December 2013 – the role of wind energy.
Damitha Kumarasinghe Director General
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Baltic Energy Market Interconnection Plan (BEMIP)
BSRS – Regions and Cohesion Policy in Action Visby 10. 6
Presentation transcript:

1 LITHUANIAN POWER SECTOR Dalius Šulga Director of Energy Development Department Lietuvos Energija AB Vilnius, 2007

2 LITHUANIA Population – 3.44 million; Area – 65.3 thousand square km; In the Middle Ages - the largest kingdom in Eastern Europe (area – square km); Lithuania lost the independence in the end of the eighteen century; Lithuania restored the independence in 1918; The USSR occupied Lithuania in 1940; Lithuania once again restored the Independence in 1990; Lithuania became the member of the EU in 2004.

3 XIV c.

4 SOME DATES OF REFORMS March, The Law on Energy adopted by the Parliament. December, Lietuvos Energija AB was established The first step of reorganization of Lietuvos Energija AB. The district heating and CHP were separated from Lietuvos Energija AB and transferred to municipalities The beginning of the second step of reorganization of Lietuvos energija AB December, Independent power companies were established. Restructuring of power sector was completed.

5 THE STRUCTURE OF ELECTRIC POWER SECTOR IN LITHUANIA PRODUCTION 3 production companies 3 CHPs owned by district heating companies Few private mini HPP Few industrial power plants Wind park DISTRIBUTION Two distribution companies (one private)‏ TRANSMISSON One Transmission System Operator company – Lietuvos Energija AB

6 3,4% 96,6% State-owned shares Other shareholders Assets million LTL Authorized capital 690 million LTL Number of employees 1142 THE MAIN GOAL - TO ENSURE A RELIABLE OPERATION OF THE POWER SYSTEM AND TO INTEGRATE LITHUANIAN ELECTRICITY MARKET INTO THE MARKETS OF WEST EUROPE AND NORDIC COUNTRIES STRUCTURE OF SHARE CAPITAL LIETUVOS ENERGIJA AB

7 THE MAIN FUNCTIONS OF LIETUVOS ENERGIJA AB MAINTENANCE AND DEVELOPMENT OF TRANSMISSION GRID Charge of high voltage ( kV) transmission lines and substations Ensures a reliable and efficient electricity transmission from Lithuanian power plants to electric utilities and large customers. DISPATCH CONTROL Coordinates the operation of Lithuanian power plants and neighbouring energy systems. Creates non-discriminatory conditions for all users of transmission grid. Ensures balance of electricity generation and consumption and reliability of electricity system. ORGANIZES ELECTRICITY TRADE Coordinates electricity export and import Settles payments among Lithuanian and foreign electricity generators and suppliers.

8 TRANSMISSION GRID  110/330 kV power lines  330 kV transformer substations and switchgears  110 kV voltage switchgear TECHNICAL CHARACTERISTICS OF TRANSMISSION GRID 110 kV 330 kV Length of overhead lines, km Length of cable lines, km 21 Transformer 6 21 Switch - gears Transformer substations 11 Capacity of transformer substations, MVA LITHUANIAN TRANSMISSION GRID

9 BALANCES OF ELECTRICITY PRODUCTION IN LITHUANIA, TWh

10 ELECTRICITY PRODUCTION IN LITHUANIA Hydro Nuclear 2597 Thermal 402 Other

11 BALTIC ENERGY STRATEGY Prepared Baltic energy strategy is published for public opinion; Main targets: – integration of power systems and gas systems into EU energy systems and markets; – diversification of primary energy sources and supplies; – increase the energy efficiency at the demand side and in the energy transformation sector; – develop the transit routes for energy products, including electricity; – strengthen education, research and development in the energy sector; – elaboration and implementation of common policy on energy imports from non-EU countries; – integration of the Baltic power systems into markets of Central Europe and Nordic countries; – to apply a request to UCTE President for conditions and terms of synchronous interconnection of the Baltic States power systems with UCTE; – renew the large power production capacities; – to use possibilities and benefits from development of distributed electricity generation; – increase the share of renewable energy sources in the electricity mix

12 LITHUANIAN ENERGY STRATEGY Lithuanian national energy strategy approved by Parliament (Seimas) in ; Integration of power system and gas system into EU systems and markets; Diversity of primary resources, increase use of local resources, to limit use of gas for electricity production up to 30% of yearly fuel balance; Ensure the continuity and development of safe nuclear energy; to put into the operation of a new regional nuclear power plant not later than by 2015; Renovate power plants, power and natural gas transmission and distribution systems as well as we district heating systems increasing their efficiency and reliability; Not later than by 2012, to connect Lithuania’s high voltage electricity networks with the networks of Scandinavian countries and Poland; Further develop regional cooperation; Construct a natural gas storage facility in Lithuania, develop a common regional natural gas storage facility, construct, a common liquefied gas import terminal in the Baltic region; Increase the share of renewable energy resources in the national balance of primary energy at least up to 20% by 2025;

13 INSTALLED GENERATING CAPACITIES AND FORECAST IN LITHUANIA Daily demand Hydro: Kaunas HPP Kruonis PSPP Small scale HPP totally Total without hydro and wind Gas, HFO, orimulsion Gas, HFO HFO nuclear Fuel MW Nuclear: Ignalina Thermal: Elektrėnai (condensing) ‏ Vilnius CHP Kaunas CHP Mažeikiai CHP Others Other renewables: Wind Others Total generation Peak demand

14 THE CLOSURE OF THE IGNALINA NPP Unit I was shut down in December 2004 The closure of Unit II is scheduled in 2009 The Ignalina NPP can be substituted by the Lithuanian PP, but this power plant has to be upgraded to meet environment requirements

15 On 26th January 2006, during an energy conference in Vilnius, government officials from three Baltic countries agreed to commission a feasibility study for a new nuclear power plant in the region. On 27th February 2006, the Prime Ministers of Lithuania, Latvia and Estonia issued a communiqué expressing their approval of construction of a new nuclear plant in the region and inviting the national energy companies to invest in the Project. The memorandum of understanding about conducting the feasibility study on the building of a new nuclear plant was signed by the heads of Lietuvos Energija, Latvenergo and Eesti Energia on 8th March NEW NUCLEAR PP

16

17 GENERATION ADEQUACY OF LITHUANIAN POWER SYSTEM BALTIC REGIONAL ENERGY FORUM June , 2007

18 BALTICS HIGHEST PRIORITY PROJECTS Lithuania – Poland interconnection (LITPOL LINK)‏ Estonia – Finland interconnection (ESTLINK 2)‏ Baltic's – Sweden (Sweden – Lithuania SWEDLIT or Latvia – Sweden)‏ Estonia – Latvia interconnection (Sindi – Riga)‏ MAIN OBJECTIVES AND BENEFITS Integration of the Baltic power systems into the EU IEM Ensuring security of supply in the Baltic region Market development Efficient use of power resources to Sweden

19 The main conclusion of the Feasibility Study – It would be feasible to develop a new nuclear power plant to replace Ignalina NPP Lietuvos energija, Latvenergo and Eesti Energia undertaking jointly to build a new nuclear power plant appears feasible from a technical, electrical system, financial and legal perspective Likely cost advantage of nuclear reactor over alternative sources of new generation On the basis of geological investigations (GI), space at the Ignalina NPP site is available to accommodate at the new nuclear reactor units to 1600 MW Availability of suitable reactors designs The nuclear fuel market is effectively a global market The current electrical system is capable of accommodating up 3000 MW of nuclear capacity. FEASIBILITY STUDY

20 PLANNED DEVELOPMENT OF BALTIC POWER SYSTEMS

21 PLANNED CAPACITY BLANCES IN MINIMUM LOAD INCREASE SCENARIO

22 PLANNED CAPACITY BLANCES IN MOST PROBABLE LOAD INCREASE SCENARIO

23 PLANNED CAPACITY BLANCES IN FAST LOAD INCREASE SCENARIO

24 BALANCE OF CAPACITY IN BALTIC STATES 2500 MW 4170 MW 430 MW

25 BALTIC POWER SYSTEM BALANCE IN SUMMER (ETSO)‏

26 LITHUANIAN ENERGY STRATEGY (2)‏ Increase the share of the electricity generated by combined heat and power plants during the heating period in the national balance of electricity generation up to 35% in 2025; Improve the efficiency of consumption of all types of energy ; Ensure the practical independence of the National Control Commission for Prices and Energy and its responsibility for the decisions taken; Ensure that the management scheme and operators of new energy infrastructure facilities comply with EU competition criteria and that these operators act as neutral market participants; to seek their free and unhindered access to EU energy networks; Application of the Baltic States to the Western European Union for the Co-ordination of Transmission of Electricity (UCTE) for the issuance of technical specifications for synchronous interconnection of the Baltic power system with UCTE zone and creation of required technical, legal and organisational preconditions, while maintaining physical interconnections for energy exchanges with the Russian power system; Agreement of regulation of the Baltic States electricity market with regulation of the Scandinavian electricity market.

27 DEVELOPMENT OF LITHUANIAN POWER SYSTEM

28 NEW INTERCONNECTIONS EXPECTED FUTURE INTERCONNECTIONS Estonia – Finland Sweden – Lithuania Poland – Lithuania MAIN OBJECTIVES AND BENEFITS Integration of the Baltic power systems into the EU IEM Ensuring security of supply in the Baltic region

29 EXPECTED INTERCONNECTIONS OF BALTIC TRANSMISSION GRID Krievija Ukraina Baltkrievija Polija Čehija Vācija Lietuva Latvija Igaunija Somija Norvēģija Dānija Zviedrija NORDEL UCTI/ CENTRAL Russia Ukraine Belorus Poland Czech Germany Lithuania Latvia Estonia Finland Norway Dānija Sweden Integrated Baltic and CIS energy system NORDEL UCTE/ CENTRAL Europe Švedija – Lietuva SWEDLIT 700 MW Lietuva – Lenkija LITPOL LINK 1000 MW ESTLINK 350 MW ESTLINK 2 – 600 MW

30 LITHUANIA – POLAND INTERCONNECTION

31 PRESENT STATUS OF LITHUANIA – POLAND INTERCONNECTION Capacity – 1000 MW; Investments – 257,4 mln. €; Completion of the interconnection is planned in ; Interconnection is planned via Back-to-Back converter station (2x500 MW); Lithuanian side and Polish side plan to start the implementation of the Project by establishing a project implementation company; Shareholders agreement is being prepared.

32 LITHUANIA – SWEDEN INTERCONNECTION

33 INTERCONNECTION LITHUANIA – SWEDEN Completed Pre-feasibility Study; Capacity ~700 MW; Investments – about 400 million €; LE and Svenska Kraftnat perform Feasibility study; Consulting company – SWECO International Feasibility study will provide detailed technical and economic analysis of the Interconnection; Feasibility study is scheduled to be completed in November, 2007.

34 PRODUCTION OF ELECTRICITY FROM RENEWABLES, MLN. KWH 8.19%4.36%From renewables Consumption Total: Biomass PP Wind PP 12562Small HE Kauno HE 2010 m.2004 m.

35 MAXIMUM INSTALLED CAPACITY OF WIND POWER PLANTS Maximum of installed capacity of wind power plants in Lithuania in 2010 (according to produced energy): P = 380 GWh/1900h = ~200 MW Maximum of installed capacity of wind power plants in Lithuania in 2010 (according to system demand): P = 622 x 1,3 x 0,2 = ~160 MW where: 622 – 2004 m. minimum load, MW 1,3 – demand increase up to 2010 m. 0.2 – part of capacity, not which not require additional costs for regulation

36 DEVELOPMENT OF WIND PP BY ZONES Transmission network kV overhead line Klaipėda– Rietavas kV overhead line Šventoji–Židikai kV overhead line Klaipėda– Palanga–Šventoji kV overhead line Klaipėda– Pagėgiai, Juknaičių substation 402 Distribution network301 Location of zone Total capacity in zone (MW)‏ Zone

37 LOCATION OF ZONES Zone 4 – 30 MW Zone 3 – 45 MW Zone 5 – 35 MW Zone 2 – 40 MW Wind connection zones: Zone 1 – 30 MW any place in kV network Zone 2 – 40 MW Zone 3 – 45 MW Zone 4 – 30 MW Zone 5 – 35 MW Zone 6 – 20 MW, any place in 110 kV, except 110 kV lines in Zones 2-5

38 PLANNED PRODUCTION FROM WIND POWER PLANTS MW Installed capacity of planned to construct new wind power plant ,85 MW Foreseen capacity of wind PP in the beginning of the year 320, 4 259,618296,227,41,4GWhProduction of electricity

39 IMPACT OF WIND PP TO ELECTRICITY PRICE

40 ETSO VIEW TO INTEGRATION OF WIND PP Necessary to speed-up construction of network infrastructure; Participation of wind PP in ensuring stability of power system, voltage control during short circuits and etc.; Ensuring balance and frequency control of the power system; Support of studies for integration of renewables into power system; Promote secure planning by limiting total capacity of renewables; Evaluate impact to international power flows.

41 PROBLEMS Big impact to power system balance control; Additional costs for power system control, balancing; Limitation of total installed capacity of wind PP; Difficulties with land ownership, rent, preparation of detail plan, environment impact assessment, unfriendly view of neighbours (not in my backyard); Impact to electricity price; Renewables reduce part of market, limits competition; Big pressure from companies which wants to construct wind power plants.

42 FUTURE DEVELOPMENT OF WIND PP Take into account policy of EU on development of renewables; In 2010 – 200 MW of installed capacity of wind PP; Most probable future development of wind power plants after How much? MW? Off-shore wind power plant MW; Study for development of off-shore wind PP up to MW. Future development of wind PP limit not stable production from this type of production, network possibilities, necessity to have power transfer reserve in transmission grid, impact to power system balance; Development of other renewables (biomass PP, etc.).

43 ACTUAL GENERATION FROM WIND PP

44 Dr. Dalius Šulga Director of Energy Development Department Lietuvos Energija AB Zveju str. 14, LT , Vilnius Lithuania web