GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:

Slides:



Advertisements
Similar presentations
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Advertisements

Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
Modeling boiling water reactor main steam isolation valve leakage using MELCOR Presented at the 21 st Annual Regulatory Information Conference March 10-12,
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
1 Generic Safety Issue (GSI) 191 Pressurized Water Reactor (PWR) Sump Performance Presented by: Donnie Harrison Office of Nuclear Reactor Regulation Presented.
> NRC Regulatory Information Conference March 12, 2009 AREVA NP Inc. 2 AREVA Perspectives on the Containment Sump Design and Downstream Effects for U.S.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Debris Effects in Long-Term Post-LOCA PWR Cooling
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Protection Against Occupational Exposure
PWR Owners Group Post-Accident Chemical Effects Work NEI Chemistry Meeting, January 26, 2012.
Westinghouse Perspective on New Reactor Sumps
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Segment SCD 4.3 Module SCD 4: Safety Case Segment SCD 4.3 Documentation and use of the safety case.
GSI-191 RESOLUTION OPTIONS
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
1 RIC 2009 MELCOR Analyses to Address Regulatory Issues: Evaluation of System Success Criteria Hossein Esmaili USNRC March 12, 2009.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.10 Documents to be Submitted to the Regulatory Body.
1 CDBI Inspection Insights for 2008 Kelly Clayton Senior Reactor Inspector Engineering Branch 1 Region IV.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
United States Nuclear Regulatory Commission Perspectives on Technical Support Organizations IAEA Meeting on TSO Challenges Aix-en-Provence, France April.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
ECCS Operability Determination Jim Andrachek Fellow Engineer Westinghouse Electric Company.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Option 2b Template Example Phillip Grissom – Southern Nuclear Based on Vogtle (more or less)
Option 2a Template Example Phillip Grissom – Southern Nuclear Based on Farley (more or less)
Closure Option 1 GSI-191 Workshop October 18-19,2012.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Prescriptive vs Performance-Based Regulatory Approaches
Defense-in-Depth and Mitigative Measures
Flooding Walkdown Guidance
Pressurized Water Reactor Owners Group
Branch Chief, Concerns Resolution Branch
NRC Cyber Security Regulatory Overview
Session Name: Ageing Management
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Bypass Testing Paul Leonard.
BEPU and Safety Margins in Nuclear Reactor Safety
Session Name: Lessons Learned from Mega Projects
TRTR Briefing September 2013
Pressurized Water Reactor Owners Group
PWR Sump Performance (GSI-191) Industry Workshop
RESOLUTION OF GENERIC SAFETY ISSUE 191
License Amendments Patrick Boyle Nuclear Engineer
PWR Sump Performance (GSI-191) Workshop
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at: Regulatory Information Conference March 12, 2009

2 Sump/Strainer History Addressing Post-Accident Long-Term Cooling Issues Has Covered Three Decades –Unresolved Safety Issue A-43 (1979 – 1985) –Boiling Water Reactor ECCS Strainer Blockage Issue (1992 – 2001) –Generic Safety Issue 191, Pressurized-Water Reactor Sump Performance (1996 – Present) –Revisit Boiling Water Reactor Resolution (Future)

3 GSI-191 History Generic Safety Issue 191 was initiated in late 1990s to address pressurized water reactor (PWR) sump performance issues –Water spilling onto the containment floor during a loss-of-coolant accident (LOCA) may need to be pumped back through the core (recirculated) to keep the core cool –This water may entrain debris that could clog the inlet strainer to the emergency core cooling system (ECCS) or the inlet to the core itself Generic Letter (GL) requested that operators of PWRs –Perform a plant-specific analysis of the emergency core cooling system and containment spray system in recirculation mode when mechanistically considering post-LOCA debris –Based on the results of the analysis, implement any corrective actions necessary to ensure compliance with regulatory requirements NRC did not identify specific plant modifications to be made GL requested completion of corrective actions by December 31, 2007

4 PWR Modifications All U.S. PWRs have installed significantly larger (10 to 100 times larger) ECCS sump strainers in response to GL Licensees have also performed, or will perform, other modifications, for example: –Insulation modifications to reduce problematic debris –Sump buffer replacement to reduce precipitate formation –Installation of debris interceptors upstream of strainers –Installation of trash racks over refueling canal drains –Increasing minimum required refueling water tank level –Modification of gates in bioshield wall to prevent debris blockage and water hold up

5 New Total Installed Strainer Area

6 GSI-191 Status Initial NRC staff review of licensees’ 2008 supplemental responses to GL is complete –Some licensees submitted additional supplements while the staff review was being performed and the staff is revisiting these additional supplements prior to engaging these licensees NRC needs additional information from most plants to conclude sump performance issue has been resolved

7 Going Forward NRC staff will review licensee responses to the plant-specific RAIs NRC goal is to complete all reviews by end of 2009 –In-vessel downstream effects by early 2010 Licensees may not be able to make some modifications needed to achieve the “as tested” configuration until after 2009

8 Lessons Learned Evolving Knowledge –Complexity of issue and plant-specific features resulted in more reliance on “proof” testing versus an analytical solution –Knowledge and approaches evolved as testing and analyses were performed and reviewed Intent of early testing/analyses was to pursue prompt issue resolution Resulted in changes in testing protocols, analyses, etc. Continuing debate on specific technical issues –Identified effects (e.g., downstream, chemical, thin bed) were incorporated into the resolution strategy for GSI-191 Intent was to have an integrated resolution Sought to have margins to offset uncertainties Hard to ensure fully accounting for phenomenon uncertainty in a mechanical fix –Created potential for cycling through analyses, testing, modifications, and reviews as new insights were gained

9 Lessons Learned Holistic Review/Acceptance –Harder than expected to make decisions that rely on weighing uncertainties and conservatisms to demonstrate regulatory compliance –Differences regarding what constitutes licensing basis versus what various staff relied upon to find licensee’s response acceptable –Need for licensees to make holistic argument that staff can evaluate to come to a regulatory decision

10 Lessons Learned Licensing Basis/FSAR Content –Level of detail regarding description of sump and related programs varies among current licensees –Licensees need to establish clear licensing bases FSAR needs to contain the key parameters and describe relied upon control programs –Maintenance of licensing basis in the future

11 Conclusion GSI-191 is headed toward resolution Lessons have been learned in pursuing GSI-191 resolution –Technical/phenomena and process New Reactors should address these issues upfront and build off the lessons learned during GSI-191 resolution