Frank Coenen For InControl SA CEO Northwind NV

Slides:



Advertisements
Similar presentations
Electrical Infrastructure Design Considerations David Flood Head of Electrical Systems, Forewind Stakeholder Workshops, April 2010.
Advertisements

Econnect Ltd Independent specialists in the grid integration of renewable energy...
NER300 Offshore Wind Project Nordsee One (formerly Innogy Nordsee 1)
Wind-energy in Belgium Facts en future plans Catholic Institute of Higher Education in South – West- Flanders Belgium.
Managing Director, HVPD Ltd
Rampion Offshore Wind Farm Onshore Construction Elements.
Ilinca Julian, Heikki Ojanen, Juha - Matti Lukkari.
© ABB Group May 1, 2015 | Slide 1 Large scale integration of Offshore Wind Power Design Considerations Peter Sandeberg /ABB, EOW 2009,
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
Quantifying risk through a rigorous analytical approach to the real world challenge of offshore wind construction – downtime, constraints and sequencing.
Groceries and Energy Projects CEBC 3rd Annual MENA Clean Energy Forum Rajan Phakey Partner, Dentons 1 December 2014.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
How to finance a renewable infrastructure project in Belgium François Van Leeuw CFO Northwind NV.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Walney Extension offshore wind farm Meeting with the Planning Inspectorate Bristol 1 st March 2013.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
/centre TDO Experience on Renewable Energy in the Netherlands A.F. (Arjan) Kirkels MSc Staff member centre Technology for Sustainable Development Eindhoven.
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
VetroEnergo AS Wind Power at the Kola Peninsula Presentation at Bellona Conference 1-2. April 2008 Lars Helge Helvig, Norsk Vind Energi AS.
Maine Wind and Ocean Energy Industry Initiative An Overview Jeff Thaler Visiting Professor, University of Maine Co-Chair, E2Tech November 15, 2011.
授課教師 : 吳元康 老師 學生 : 詹博雄 HVDC Connection of Offshore Wind Farms to the Transmission System.
Virginia : Offshore Wind Feasibility Analysis Trevor S. Daubenspeck.
Europe goes Offshore with Wind Farms Hermann J. Koch Senior Member IEEE Substations Committee Vice Chairman Siemens Energy Sector Transmission Erlangen,
Financial Close The Insurance Review Process 6 th November 2014 Eoin Greene Irish Wind Farmers Association Annual Conference th November 2014 – Hotel.
Wind Farm Design and Engineering Mark Legerton Head of Engineering and Supply Chain April 2010.
1 | A Greener Economy | Göran Loman | Offshore Wind Energy Kentish Flats Extension Göran Loman Environment Conference, Canterbury A Greener.
Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel
Potential hazards and risks in the offshore wind park development process in Poland Stefan Simon, CEO Green Energy World.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Cost trends for Offshore Wind - and a look at the resources David Milborrow
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
EUROPE’S ENERGY EXPORTER Neart na Mara. source EWEA.
W. Schufft: Challenges for electrical power engineering IP 2007, Pernink Challenges for Electrical Power Engineering.
German Offshore Wind Strategy1 German Policies on Offshore Wind Energy Cornelia Viertl / Jens Bömer Division KI I 3 / Hydropower and Wind Energy.
TU Delft Delft University of Technology 1BWEA Offshore Wind Conference London – Apr ‘02 Concerted Action on Offshore Wind Energy in Europe with acknowledgements.
1 Offshore Wind Resources in the Southeast Bill Bulpitt, Susan Stewart, & Mary Hunt Georgia Tech Strategic Energy Initiative The Southeast & Mid-Atlantic.
Kriegers Flak Offshore development in three different countries - lessons learned and progress expected.
Offshore Wind Power Technologies, Economics Aleksandras Paulauskas, SSI.
Dan Finch Moray Offshore Renewables Ltd. DELIVERING ROUND 3 Inverness 2nd February 2010 MORAY FIRTH OFFSHORE RENEWABLES Ltd.
Michael B McElroy School of Engineering and Applied Sciences Harvard University May 21, 2008 Renewable Energy and Beyond.
Wind, Wind Power and Vestas Implementation of Wind Power.
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
Offshore Wind Farms An overview… UE VISION FOR % energetic efficiency -20 % greenhouse gas emissions 20 % of energy from renewable.
Dikella Offshore Windfarm 50 MW Presentation August 2010.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
E-ON RAMPION OFFSHORE WIND FARM
Preface  daily power consumption  kilowatt-hour (kWh) = electricial power (watt=W) times power-on time (hour=h)  1 kilowatt-hour equals watt-hours.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Planning and Realisation of Wind Farms
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Manufacturing in Denmark
Wind Energy in Iowa Lori McDaniel
Renewables: Moy Wind Farm
Estimation of the Optimum Wind Turbine Size for Two Different Offshore Sites and Wind Farm Rated Powers MSc. Candidate: Shajid Kairuz Fonseca Supervisor:
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
Patrick Smith, Vice President
Icebreaker Wind Supply Chain Open House
Innovation and Offshore Renewables
Grid integration and stability of 600MW windfarm at Kriegers Flak
Evaluation of wind farm layouts
Funder Preferred Risk Allocation
Blauwwind overview April 18th 2019 Sil Draaisma – Construction Manager
Presentation transcript:

Frank Coenen For InControl SA CEO Northwind NV Presenting Northwind Frank Coenen For InControl SA CEO Northwind NV

Northwind project Concession granted: 15 May 2006 Fully permitted Permit for construction and exploitation Export Cable Permit Land cable Declaration of public use Flemish road permit Federal road permit Building permit Area: 14,5 km² Water depth: 16 to 29 m Distance from shore: 37 km

Northwind project 216 MW 72 Vestas turbines V112 3 MW Yearly production estimated: 0,875 Terrawatthours = 875 million kilowatthours Meaning: 1% of the yearly electricity consumption in Belgium in 2011. Green energy for 230.000 households each year.* Reduce CO2 emission by 245.000 tons each year.** * cfr VREG ** cfr Eurostat

General information Turbine model: Vestas V112 – 3.0 MW Rotor diameter: 112 m Foundation type: Monopiles Export cable: 220 kV Length export cable: 43 km Construction will start: spring 2013

Shareholders Parkwind

Connection to transmission grid Offshore windfarm Monopile Transition piece Windturbine Inter array cables OHVS (transformation station) Export cable 5 3 Connection to transmission grid 2 1 4 6

Contractors WE Power Project management EPCI - Engineering Procurement Construction Installatie  Supply monopiles  Supply Transition pieces  Supply & termination inter-array cables  Installation hammer  Detailed design  Supply foundation installation vessel WE Power Moet dit allemaal nog naar het Nederlands vertaald? En van sommige kan ik de logo’s niet vinden

Contractors Installation export cable & dredging: Supply and termination land cable: WTG installation vessel: Supply and termination export cable: Vanden Bergh logo???!

Contractors WTG: Supply & installation Offshore High Voltage Station:  HV equipment: CG Power systems Foundation design certification: Power purchase agreement:

Partners Financial & legal BnP Parisbas Fortis Mott Macdonald Green giraffe Loyens & Loeff White & Case Contrast JLT Freshfields KPMG Insurance Profin Marsh Belgium Codan Forsikring A/S AXA Versicherung AG AXIS Specialty Europe Ltd. HDI-Gerling Verzekeringen N.V

Belgian content Belgian content: 50% Deme-GeoSea Jan De Nul CG Power systems Belgium GI Windforce Vanden Bergh/Heijmans Other than procurement WE-Power Freshfields Lawyers Brussels Aspiravi Offshore BNPParibasFortis Electrabel Belfius Bank Loyens Loeff Lawyers ING Bank White & Case Lawyers Brussels & London IMDC Contrast Lawyers Tractebel-Technum Marsh Belgium ONDD-Delcredere. KPMG Tax advice Moet dit allemaal nog naar het Nederlands vertaald? En van sommige kan ik de logo’s niet vinden

TeamPartners InControl SA WE Power ABS Aspiravi offshore Chevalyse Ensol EPCM IMDC Noren quality consulting Offshore wind power consulting Polymira Qualsurv SGS Technum Tractebel Verenigde fiducaires Wind Support Limited

Belgian support & Northwind team FOD economy Federal authorities MUMM Flemish authorities Elia CREG DG Leefmilieu & Northwind team