Regional Air Quality Analysis: Four Corners

Slides:



Advertisements
Similar presentations
RH Requirement for BART  §308 (e) contains BART requirements for regional haze visibility impairment…. The State must submit an implementation plan containing.
Advertisements

REDUCTION OF HIGHLY REACTIVE VOLATILE ORGANIC COMPOUNDS & VARIABLE EMISSIONS IN HOUSTON/GALVESTON: MONITORING, MODELING, MEASURING, RULEMAKING David Allen.
Southern Ute Indian Tribe’s Participation in the 2011 Passive Ammonia Study Conducted by EPA Region 6.
The Massachusetts Approach to Power Plant Clean-up Policy Making and Standards Setting to Reach Clean Air Sonia Hamel Massachusetts Executive Office of.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
Maricopa County Air Quality Department 1001 North Central Ave. Phoenix, Arizona Maricopa County Air Quality Department Protecting and improving our.
Ozone in Colorado: Issues and Reduction Strategies Presentation to the Colorado Environmental Health Association October 2,
Working together for clean air Puget Sound Area Ozone Modeling NW AIRQUEST December 4, 2006 Washington State University Puget Sound Clean Air Agency Washington.
Texas Lignite Industry. Texas Lignite  Because >95% of lignite mining operations in Texas are in support of electric generation…..whatever impacts the.
Meeting of the Southern Ute Indian Tribe/State of Colorado Environmental Commission and the Colorado Air Quality Control Commission 4/16/2015.
Air Quality Challenges In South Central Texas Issues and Demand to Infrastructure in the Eagle Ford Region Eagle Ford Consortium Peter Bella, Natural Resources.
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
ACC Open Meeting – November 18, 2010 Four Corners Power Plant 1.
1 BLM Oil and Gas Overview Scott F. Archer USDI – BLM National Science & Technology Center September 13, 2007.
Indiana Environmental Health Summit Indiana Department of Environmental Management (IDEM) June 6, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner,
West-wide Jumpstart Air Quality Modeling Study Modeling Results November 7, 2013 Technical Project Team ENVIRON, Alpine Geophysics, Univ. of North Carolina.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
WELCOME TO NEW MEXICO WESTAR Fall Business Meeting 2009.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Air Quality Issues and Solutions in SW Colorado – A State Perspective Presentation to the Backyards Conference on Regional Air Quality September 15, 2005.
The Western Regional Air Partnership (WRAP) WRAP formed in 1997 as the successor organization to Grand Canyon Visibility Transport Commission (GCVTC) –
Western Sources and Trends: What do we know about emission sources across the West? WRAP Ozone & NOx in the West meeting November 11, 2009 Santa Fe, NM.
Ozone and Nitrogen Concerns in NM WRAP Ozone and NOx in the West November 11, 2009.
Modeling Studies of Air Quality in the Four Corners Region National Park Service U.S. Department of the Interior Cooperative Institute for Research in.
SIP Development and Implementation in New Mexico - and Why it Matters to Tribes Rita Bates Planning Section Chief Air Quality Bureau New Mexico Environment.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
Regional Issues Facing Colorado and Other Western States WESTAR Spring Business Meeting Denver, Colorado March 30, 2010 Paul Tourangeau Director Colorado.
Regional Haze Rule Best Available Retrofit Technology Government to Government Consultation Navajo Nation Environmental Protection Agency.
Southern Ute Indian Tribe Courtesy of the Southern Ute Air Quality Program Presentation Prepared by: James Temte and Virgil Frazier.
Oil & Gas NSPS/NESHAPS Bob Lebens WESTAR Bob Lebens WESTAR.
November 7, 2013 WRAP Membership Meeting Denver, CO Tom Moore WRAP Air Quality Program Manager WESTAR Council.
Air Quality Impacts from a Potential Shale Gas Emissions Scenario - Photochemical Modeling of Ozone Concentrations in Central North Carolina Presented.
Stationary Sources Joint Forum Update Eric Massey Arizona Department of Environmental Quality Lee Alter and Patrick Cummins Western Governors’ Association.
Preparation of Control Strategies October 18, 2007 NAAQS RIA Workshop Darryl Weatherhead, Kevin Culligan, Serpil Kayin, David Misenheimer, Larry Sorrels.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
1 DISCLAIMER Please note that this is a summary of a draft report of TERC Research Project H60. In order to fully respond to comments on the draft report.
Estimate of Air Emissions from Shale Gas Development and Production in North Carolina July 8, 2015 Presented to the Environmental Management Commission.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
NACAA Fall Meeting October 2012 Innovative and Replicable Initiatives - The Colorado Clean Air/Clean Jobs Act Will Allison, Director CDPHE Air Pollution.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
September 13, 2007 Erik Aaboe & Mark Jones NMED/Air Quality Bureau Four Corners Air Quality Task Force.
Massachusetts Multi-pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection EPA Utility MACT Working Group.
1 WRAP Oil & Gas Phase II Work Plan: 2002 and 2018 Area Source Inventory Improvements and Area Source Controls Evaluation WRAP Stationary Sources Forum.
WRAP Workshop July 29-30, 2008 Potential Future Regional Modeling Center Cumulative Analysis Ralph Morris ENVIRON International Corporation Novato, California.
GETTING STARTED IN AIR WORK BY JAMES TEMTE ~ ANTHC ~ AIR QUALITY PROGRAM MGMT OF TRIBAL AIR QUALITY IN ALASKA ~ ITEP APRIL 2011.
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Navajo Nation Interest’s In EPA Rulemakings Affecting EGU’s National Tribal Forum May 22-24, 2012 Tulsa, Oklahoma Anoop Sukumaran, Navajo Nation Environmental.
Southern Ute Indian Tribe
Indiana Environmental Management Conference October 16, 2013 Thomas W. Easterly, P.E., BCEE, Commissioner IN Department of Environmental Management 1.
BART SIP Development: Example from Colorado Rocky Mountain National Park WRAP IWG Meeting, Denver, CO August 29, 2007 Presented by: Ray Mohr and Curt Taipale.
China's Location in the World 1 kilometer = miles.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
EPA Planning and implementation Update Western Regional Air Partnership November 11, 2009.
WESTAR Staff Reports 2015 Fall Business Meeting Scottsdale, Arizona.
How Tribes Use Models Part 1 Navajo Nation Environmental Protection Agency.
Western Regional Technical Air Quality Studies: support for Ozone and other Air Quality Planning in the West Tom Moore Air Quality Program Manager Western.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
November 15, Clean Air Act Framework National Ambient Air Quality Standards (NAAQS) set public health goals Planning process considers science,
Technical Support System Review Board Meeting March 8, 2007.
Station Name CY 2014 AQS Data Certified CY 2015 AQS Data Certified Ute 167Y68Y Ute 367Y66Y Mesa Verde National Park65Y66 Bloomfield62Y61 Navajo Dam63Y68.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
EPA Methane Regulations Details on the Final Rules and Summary of Impacts May 16, 2016 Producer: Claire Carter Edited by: Afzal Bari Director: Afzal Bari.
Revised EPA Ozone Standard – Effects in the West May 15, 2008.
Western Regional Technical Projects 2011 through 2013
Four Corners Air Quality Task Force
WRAP Modeling Forum, San Diego
DOGM Collaborative Meeting
Presentation transcript:

Regional Air Quality Analysis: Four Corners October 22, 2008 Rita Bates New Mexico Environment Department Air Quality Bureau

Four Corners Overview Arizona, Colorado, New Mexico, Utah, Navajo Nation, Ute Mountain Ute, Southern Ute Indian Tribe Federal agencies: NPS, USFS, BLM San Juan Basin produces 4 billion cubic feet of natural gas daily (1.5 trillion ft3 annually) [2004 survey] 6 to 8% of U.S. Natural Gas production. California’s largest source of natural gas. 17.6 million TPY coal mined. Expansive untapped coal, oil and gas reserves. 7 Class I areas within 250 km

Four Corners Air Quality Task Force Began meeting November 2005 Approximately 250 members and interested parties Task Force Report final version released November 2007 Report includes mitigation options developed by task force members Over 500 pages http://www.4cornersair.org

Four Corners Class I Areas Utah Colorado Arizona New Mexico

Energy Generation 3840 megawatts of existing coal fired power Proposed 1500 MW Desert Rock Energy Facility coal-fired power plant Economic pressure to develop resource Active environmental community

Oil and Gas Production 18,000 existing oil and gas wells in New Mexico part of San Juan Basin 10,000 projected for next 20 years in NM Many small unpermitted sources Multiple operators Changing field conditions

Oil & Gas Wells in Four Corners (as of 2003)

NM Action on Oil & Gas Production Statutory stringency limitations on new regulations. Existing Engines: NM is evaluating the need for new regulations. Has worked with BLM to incorporate a limit in the Permit to Drill COA New Engines: EPA New Source Performance Standard (NSPS) Subpart JJJJ Summary San Juan VISTAS program 3 partners who have pledged to voluntarily reduce some emissions leading to ozone, haze, & climate change Continued inventory and modeling work

Four Corners Agency Action Oil & Gas Production Federal Land Managers (BLM, FS, NPS), EPA and Tribes are working cooperatively to minimize impacts BMPs for Tanks Optimization, Centralization, Co-location Control of existing/new engines in permits to drill EPA working on rule/protocol for using Optical imaging for leak detection Continued inventory and modeling work to ensure region meets federal air quality standards

Four Corners Modeling Project Objectives Model air quality, visibility, deposition impacts of air emissions in the Four Corners region for 2005 & 2018 Evaluate impacts of alternative mitigation strategies Primary focus on impacts in Mesa Verde and Weminuche Class I areas and surrounding Class II areas. Very brief background is that the modeling project began summer 2007. The Four Corners agencies are contracting Environ to do the study. Goal of study is to Model criteria pollutants, visibility, and deposition for 2005 & 2018 Evaluate 5 mitigation scenarios

Modeling Information Distribution All modeling work is now anticipated to be complete by Spring 2009 Modeling results will be presented at a Four Corners Air Quality Group (4CAQG) update meeting scheduled for Spring/Early Summer 2009 in Durango, CO at Fort Lewis College Modeling results will also be made available online, http://www.4cornersair.org

Four Corners Modeling Schedule Task: Completion Date: Completion of 2005 base case runs with model performance evaluations. End of August 2008 2018 ozone source apportionment (OSAT) model run. (3-4 weeks) End of November 2008 2018 PM source apportionment (PSAT) run. Unknown Use 2018 OSAT and PSAT results to reevaluate the mitigation scenarios. Finalize the mitigation scenarios using more specific source (using Standard Industrial Classification (SIC) code) percent reductions associated with mitigation Mid December Mitigation Scenario Modeling February 2009 Complete Model & Final Report June 2009

2005 and 2018 Power Plant Emissions

2005 and 2018 Oil & Gas Emissions – NOx

2005 and 2018 Oil & Gas Emissions – VOC

Some observations: 4K Oil and Gas annual emissions increase of 10,000 tons NOX 2005 - 2018 4K Oil and Gas annual emissions increase of 27,000 tons VOC 2005- 2018 4K San Juan GS, and 4CPP currently make-up 95%+ of energy production NOx and SO2 4K TOTAL EMISSIONS show a decrease in annual emissions NOx from 2005 – 2018 in 4Corners of 5% (mostly due to reduction in offroad and onroad mobile emissions) 4K TOTAL EMISSIONS show an increase in annual emissions VOC from 2005-2018 in 4 Corners of approx 20,000 tons, a 5% increase 4K TOTAL EMISSIONS show a increase in annual emissions SO2 2005-2018 in 4 Corners of approx 12,000 Tons per year a 28% increase mostly dependent on EGU!. & the basecase assumptions that 4CPP would increase production & that DREF would come online & that some additional future coal-fired production would be required. Interesting to see that NOx and VOC change is minimal & even though SO2 may increase...chances are it will be more like 2005 = 2018

Ozone Monitoring Sites in Four Corners Area Number of sites in the area. Unknown at this point if Dine College site is running.

Northwestern New Mexico Air Quality Monitoring NH3(airport) NOx Ozone PM 2.5 NH3 Met Waterflow SO2 NOx Ozone Met PM10 PM2.5 SO2 NOx Ozone Met NMED Air Monitoring website real time data: http://air.nmenv.state.nm.us/ *Also in process of installing mercury total deposition air monitor at Navajo Lake site 2008 *Four Corners Ammonia study recently published in Journal of Environmental Monitoring

A number of sites are above or just below the level of the new standard. - above = Navajo Lake - just below = Ute Hwy 550, Shiprock, Canyonlands, Mesa Verde Trend is slightly upward at Mesa Verde and Canyonlands sites. Trend is slightly downward at Shiprock Substation and Bloomfield sites. Ute-Hwy. 550 (Bondad) site was trending down and is now upward. Ute-Ignacio site was upward before dropping and is now indefinite on a trend. Navajo Lake trend is to be seen in a few years. (Only 2-years of data so far.)

Northwestern New Mexico Air Quality Monitoring JB clarification (10/8/08): new standard says an exceedance occurs when the three-year average of the 4th highest annual 8-hr average is greater than 0.075 ppm.  The old standard was given as 0.08 ppm (note two decimal places).  That meant that the standard was exceeded when the three-year average of the 4th highest annual 8-hr average reached 0.085 ppm. Anything between 0.081 ppm and 0.084 ppm would round to 0.08 ppm.  Now there is no longer any rounding taking place.  Once the truncated average is over 0.075, (i.e. 0.076), it is an exceedance. *We have observed relatively high levels of ozone at Navajo Lake site this October 2008. & based on a few high days middle of October our 4th highest 8-hour average there this year increased to 77 ppb [Oct 18] (preliminary). 3-yr average exceeds 75 ppb NAAQS at Navajo Lake site.

Four Corners Monitoring Information Monitoring data for our 3 ozone monitors in San Juan County are available online (real time & archived) as well as in summary format showing the annual design values that are compared to the federal standard for attainment status The 3-year average design values for the NM San Juan County ozone monitors are currently 65, 71, and 77 ppb Passive ozone studies and other research has been done throughout the area

San Juan VISTAS VISTAS History Voluntary Innovative Strategies for Today’s Air Standards San Juan VISTAS is a voluntary emission control program administered by the New Mexico Environment Department (NMED) for the improvement of air quality. VISTAS History Began in 2005 as a result of EAC work Modeled after EPA Gas STAR program

What’s The Purpose? Prevent pollution • The purpose of San Juan VISTAS is to identify, promote, and implement practices and technologies to reduce emissions that contribute to ozone, haze, and climate change.

Questions? New Mexico Environment Department Air Quality Bureau Farmington Office Santa Fe 3400 Messina Drive 1301 Siler Rd., Bldg. B Farmington, NM 87402 Santa Fe, NM 87507 (505) 566-9746 (505) 476-4300 Project Websites: Four Corners Air Quality Group: http://www.4cornersair.org Four Corners Modeling Project: http://www.4cornersair.org – go to modeling project link San Juan VISTAS: http://www.nmenv.state.nm.us/aqb/projects/SJV/index.html Homepage: http://www.nmenv.state.nm.us/aqb/