National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.

Slides:



Advertisements
Similar presentations
A Service Disabled Veteran Owned Small Business. A FULL SERVICE ELECTRICAL CONSTRUCTION COMPANY.
Advertisements

Jim McElwain College Architect SETTING UP A LABORATORY.
Monthly Management Report February By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013
The Cryopit Fraser Duncan Cryopit Workshop 16 August 2011.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Proprietary and Confidential Liberty Mutual Insurance Fire Protection Laboratory Welcome To view tour:
The Life Safety Surveyor Facility Tour
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
Fire safety is an important business. You need to take proper precaution in order to prevent a fire. Yes, fire may be inevitable but if prepared, you can.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 30, 2013 Clean room administrative committee.
Furnaces and Wet bench area Savitha P. Wet bench July and August month was very busy CeNSE usage includes lab course, INUP hands-on electroplating slots.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
Physical Security Chapter 9.
Micro and Nano Characterization Facility
Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:
Furnaces and wet benches Savitha P. TEOS installed – problems stabilizing temperature and pressure Solved with First Nano’s help – Under optimization.
Furnaces and wet benches Savitha P. Annealsys new RTP: Pump quote, hook up quote in process, time for spare parts Visit to SITAR regarding TEOS deposition.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Shop Safety and Conduct By: Mr. Beese. Safety In The Work Area Keep Work Area Clean Tools Put Away Fire Hazards can be avoided Shop Floor.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Cleanroom Admin Committee Meeting Prabhakara Rao April 28,
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
LABORATORY DESIGN AND SAFETY EQUIPMENT. 1. LABORATORY DESIGN a. Egress b. Traffic Patterns c. Floor Surfaces d. Master Controls e. Automated Detection.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Sl.NoItemOwnerStatus 1a. To get the cost estimate of having a centralized compressor for all the labs at CeNSE. b. Estimate the cost of running a new pipeline.
HE UTTAR PRADESH FIRE PREVENTION AND FIRE SAFETY RULES 2005
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Furnaces and Wet bench area Savitha P. Wet bench - Movement CMOS wet bench moving to the new clean room Purchase orders for chemicals still not released.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
Monthly Management Report Submitted By Facility Management Team
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Sept 25, 2013 Clean room administrative committee.
Bering Drive G W E Quantum Labs, Inc 2108 Bering Dr., B. San Jose Aborn Electronics RSJ Machining ! Center Point Gas Shut-off Electricity Shut-off Water.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Micro and Nano Characterization Facility Girish Kunte July 1 st 2014.
Micro and Nano Characterization Facility Girish Kunte October 28 th 2014.
Associated detection/extinction systems D. Swoboda.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Fire Prevention Facilities of Building 1 Civil Engineering Department Safety Promotion Project.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
Science Safety Why Do We Start With Safety?  The Right to Know Act.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
ME444 ENGINEERING PIPING SYSTEM DESIGN
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Welcome to the Safeguard IndustriesSafeguard Industries.
Argon By: Chloe. -A-Argon is a gas. At room temperature that is. -Argon is non metal.
50% LBNE Concept Design LAr Infrastructure. Mechanical.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
Public Safety Committee New Construction Dallas Fire Rescue Inspection and Life Safety Education Section Chief James Adams June 13, 2016.
Safety and Prevention of Typical Fire Plan
FIRE PROTECTION & SECURITY in ELI Beamlines
Science 1206 Lab Safety.
FACILITY EMERGENCY PROCEDURES
Paige Klem OR Consortium
FULL SUPPLY OF FIREFIGHTING EQUIPMENT ANS SERVICES
Fire safety Module 10.
Presentation transcript:

National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting

Arun Kumar Menon Fire alarm system CeNSE- Service started, Detectors communication problems resolved. Cease fire – wire less detectors demo done at cleanroom, some areas like Litho its not functioning properly. Clarify wireless frequency does not interfere with equipment Fire sprinkler system automation works completed. All fire extinguishers refilling completed. Only Ceasefire has quoted partially for wireless detectors and water mist extinguisher Oct 7, 2014 Fire Safety Cleanroom Admin Commitee Meeting

Arun Kumar Menon RTP - Electrical, PCW, CDA hook up done by FM Team. – Exhaust contract given to Nanoclean Wet bench – Electrical, drain line hook up done by FM team – Exhaust will be connected by Nanoclean – Ovens exhaust works pending. 2 nos Argon gas lines provided for Tempress Furnace in Equipment development room AHU-2 Blower 1 motor rewinding done and re installed. Oct 7, 2014 Other activities Cleanroom Admin Commitee Meeting

Arun Kumar Menon Utility building water leaks fixed. MNCF- Chilled water lines provided for Raman spectra scope and Low temperature probe station by FM Team. Liquid nitrogen tank yard- Floor cracking filled with chemical foam and ramp works completed. Packaging lab- Dedicated Electrical connection provided for Laser tool by FM team. Oct 7, 2014 Facilities works completed Cleanroom Admin Commitee Meeting

Arun Kumar Menon Oct 7, 2014 Thank You Cleanroom Admin Commitee Meeting