O Objective:  Asses the feasibility of achieving the disinfection requirement of the primary effluent overflow during wet weather events through the existing.

Slides:



Advertisements
Similar presentations
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Terry Keep September 18, 2013 ADVANCES IN UV TECHNOLOGY FOR 4-LOG VIRUS DISINFECTION OF GROUNDWATER.
Nutrient Issues at the Blue Plains WWTP February 2004.
Anne Arundel County Department of Public Works
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Prepared by WMC Consulting Engineers Inc. John A. Wengell.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Fecal Colform Bacteria Contamination during Rain Events in Sayler’s Creek, Virginia Blake N. Robertson Senior Honors Research Under the Supervision of.
Paving a Path to Potable Reuse Flexible Treatment for To Be Determined Regulations Michael Watts, PhD, PE Water Technology Leader Garver.
Detroit WWTP NPDES Permit Informational Meeting Michigan Department of Environmental Quality October 23, 2014.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
Decision for DCWASA “ SELECT CHEMICALS TO IMPROVE WASTEWATER TREATMENT PROCESS”
Chlorination Chemistry; Considering Chloramines and Free Chlorine
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Chlorine Contact Chambers; Chlorine Mixing and Contact Time for Ct Harris County Wastewater.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
XI. Swimming Pools & Bathing Beaches A. Regulations & B. Design and safety.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Applicability to Developing Nations Cholera outbreaks are prevalent in developing nations that use domestic wastewater for irrigation. PAA is effective.
Building A Better Biosolids Future. A Brief History Sewage Treatment in Detroit  “ The Grand Sewer” 1836  The Fairview Sewer 1913  The Detroit WWTP.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
PHOSPHORUS REMOVAL FOR LAGOON OPERATORS WHY THE CONCERN OVER P.
People. Ideas. Innovation. Reduction of Natural Gas Usage for City of Corvallis Waste Water Facility Kendra Seniow, Melissa Ghiglieri, Kelly Wilson Sponsor:
Cortez Sanitation DistrictSeptember 2002 Arber Cortez UV Disinfection Steven M. Ravel, P.E. Travis E. Meyer, P.E. Richard P. Arber Associates.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Detroit WWTP NPDES Permit Informational Meeting Michigan Department of Environmental Quality October 17, 2013.
THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
Relative benefits of piped water supply over other “improved” sources: a case study from rural Vietnam Brown, J.*, Vo Thi, H.**, and Sobsey, M.*** *Corresponding.
OMSAP Public Meeting September 1999 Update on the Boston Harbor Project n In 1999, the $3.7 billion construction project is nearly complete, occupying.
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
Christopher Hill December 6, 2006 CE 679
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
November 17, 2015 NC AWWA-WEA Annual conference
Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Introductory Workshop for Blue Plains Users.
Bacteria Rulemaking Inclusion of Bacteria Limits in TPDES Permits.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
After Permitting –or- just when you thought you were out of the woods There is NO After! Between Permitting Compliance Schedules Permit Amendments Permit.
NH International (Caribbean) Ltd Penal Rock Hindu School Presented by : Sudesh Ramroop.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Integration of Accelerated Precipitation Softening - Microfiltration (APS-MF) Assembly to Maximize Water Recovery from the Treatment of Brackish Water.
Average Discharge per flush = 5 gallons Average blackwater flow (toilets) = 700 gals/day Average graywater flow = 2377 – 700 = 1677 gals/day.
Recycled Water Project Basis of Design Report
Water Treatment for Solar Panel Cleaning using Membrane Distillation
CTC 450 Review Open Channel Flow (Manning’s Equation)
Update on PI Modeling and Nitrogen Removal at Blue Plains
Cudworth Professor of Urban Water Systems
How Do Wastewater Facilities Address Contaminants in Water
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
PERACETIC ACID DISINFECTION Demonstration of PAA as Sole Wastewater Disinfectant at the Berkeley Heights WPCP Chris Jepson Van Cleef Engineering Assoc.,
City of Noblesville Wastewater Utility
Background Appledore Island, ME: Aerial View.
CTC 450 Review Open Channel Flow (Manning’s Equation)
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
ADVANCED WATER PURIFICATION SYSTEM
Wastewater Facilities Upgrade Project
Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7th Biennial Meeting of the Lake Erie Millennium Network.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Trihalomethanes Removal Evaluation
Presentation transcript:

o Objective:  Asses the feasibility of achieving the disinfection requirement of the primary effluent overflow during wet weather events through the existing Rouge River Outfall (RRO) o Methodology:  High rate disinfection approach Application of high-rate mixing (G value between 500 and 1,000 s -1 ) in combination with a chemical disinfectant Contact/detention time of less than 15 minutes  Flow rerouting schemes during wet weather events  Evaluate disinfection alternatives use a Triple Bottom Line (TBL) approach Peracetic Acid (PAA) Ultraviolet Irradiation (UV) Bromine based Guanidine based Chlorine/Sodium Hypochlorite Existing Flow SchemeProposed Flow Scheme Balancing Environmental Stewardship and Cost in the Disinfection of Wet Weather Flows in Water Resource Recovery Facilities Isaiah Shapiro, EIT  Dimitri Katehis PhD, PE  Lin Liang, PE Overview Methodology Bench Scale Testing Recommendation o Detroit Sewerage and Water Department (DWSD) o Largest single-site wastewater treatment facility  Primary Capacity = 1,800 MGD  Secondary Capacity = 1,100 to 1,400 MGD  Primary Overflow during Wet Weather: 400 to 700 MGD o Largest single-site wastewater treatment facility o Permit requirement for both secondary effluent and primary effluent overflow:  Fecal Coliform 7-day: 400 cfu/100 mL  Fecal Coliform 7-day: 200 cfu/100 mL o Proposed Rouge River Outfall 2 (RRO-2) to provided 30 minutes of contact time. o Based on the Triple Bottom Line (TBL) evaluation concluded that chlorination is the most viable option o Hence, bench scale was conducted to validate the disfection efficiency at a contact time of less than 15 minutes for both secondary effluent and primary effluent under wet weather conditions o Three scenarios were considered at vary level of chlorine dose:  Chlorination of Primary Effluent  Chlorination of Chemically Enhance Primary Treatment (CEPT)  Chlorination of Secondary Effluent Results Primary EffluentChemically Enhanced Primary TreatmentSecondary Effluent Findings Existing Flow Scheme Proposed Flow Scheme o Primary Effluent :  Bench testing results show that the target f. coli level was not achieved at chlorine doses of 5 or 10 mg/L even at a contact time of 30 minutes. Although, adequate disinfection can be achieved within minutes at the highest chlorine dose applied of 20 mg/L. o Chemically Enhance Primary Treatment:  Test results indicate that the f. coli target level can be achieved at between 2 and 15 minutes depending on the chlorine dose. At doses of 10 mg/L and greater, less than 10 minutes of contact time are adequate to meet disinfection targets. o Secondary Effluent:  Results show that adequate disinfection of secondary effluent occurs between 2 and 10 minutes depending on the chlorine dose. At a dose of 5 mg/L up to 10 minutes of contact time is required to achieve the disinfection target; however at doses of 10 and 20 mg/L, less than 5 minutes of contact time is required. Table: Results of the bench testing in terms of contact time required to achieve a f. coli count of 200 MPN/100 mL for a given chlorine dose Outcome o Based bench scale results and hydraulic modeling analysis, this study concluded that high rate disinfection with chlorine in conjunction with the proposed flow rerouting scheme during wet weather conditions is a viable alternative to the construction of the Rouge River Outfall 2 (RRO-2). o This approach was recommended to the Detroit Sewerage and Water Department (DWSD) o Michigan Department of Environmental Quality (MDEQ) has approved disinfection of the secondary effluent through the existing RRO and the excess primary effluent through DRO during wet weather events. o Averted $70-90 million capital project to construct RRO-2 o Estimated capital cost to allow for the flow modifications is $10-15 million Acknowledgments: Dan Schechter – DWSD Nicole Spieles – Greeley and Hansen Jared Buzo – Greeley and Hansen