The Silicon Vertex Detector of the Belle II Experiment

Slides:



Advertisements
Similar presentations
The Belle II Silicon Vertex Detector Markus Friedl (HEPHY Vienna) for the Belle II SVD Group VCI, 13 February 2013.
Advertisements

17 February 2010 The Silicon Vertex Detector of the Belle II Experiment VCI 2010 M.Friedl, T.Bergauer, I.Gfall, C.Irmler, M.Valentan (HEPHY Vienna)
The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6-7 Dec Nagoya Univ.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Belle SVD status & upgrade plans O. Tajima (KEK) Belle SVD group.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
The Silicon Vertex Detector of the Belle II Experiment
Status and Physics Prospects of the SuperKEKB Project Y. Horii Tohoku Univ. (Japan) 1 5th March 2011, La Thuile 2011.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
The Belle Experiment at KEK Christoph Schwanda Institute of High Energy Physics (HEPHY) Austrian Academy of Sciences Symposium Wissenschaftliche Kooperation.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
University of Nova GoricaBelle Collaboration S. Stanič, STD6, Sep , 2006 Status of the Belle Silicon Vertex Detector and its Development for Operation.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Operation of the CMS Tracker at the Large Hadron Collider
Vertex detector for the KEK B factory upgrade Toru Tsuboyama (KEK) 1 March 2008 Instr08 Novosibirsk.
Kodali Kameswara Rao TIFR, Mumbai
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
25 Oct 2011 The Silicon Vertex Detector of the Belle II Experiment IEEE NSS 2011 Thomas Bergauer (HEPHY Vienna) Valencia.
The Mechanical Structure for the SVD Upgrade
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
Dec 11th, 2008 Thomas Bergauer Market survey for double sided silicon strip detectors HEPHY Vienna.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
25 April 2013 Thomas Bergauer (HEPHY Vienna) Components and ladder quality control and testing procedures Belle II Vienna-Pisa meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Belle II Science and Overall Project Tom Browder University of Hawaii.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Markus Friedl (HEPHY Vienna)
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Comments to the SVD4 structure
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

The Silicon Vertex Detector of the Belle II Experiment Thomas Bergauer (HEPHY Vienna) Vertex 2010 Loch Lomond 10 June 2010

Introduction Belle II: The Future Double Sided Sensors SVD-II Components Readout System Summary 10 June 2010 T. Bergauer

KEKB and Belle @ KEK Asymmetric machine: 8 GeV e- on 3.5 GeV e+ Belle ~1 km in diameter Mt. Tsukuba KEKB Belle Linac About 60km northeast of Tokyo Linac Belle KEKB Center of mass energy: Y(4S) (10.58 GeV) High intensity beams (1.6 A & 1.3 A) Integrated luminosity 1 ab-1 recorded by end of 2009 10 June 2010 T. Bergauer

Belle Detector (1999– 20. June 2010) Aerogel Cherenkov counter n=1.015~1.030 SC solenoid 1.5 T 3.5 GeV e+ CsI(Tl) 16 X0 TOF counter 8 GeV e- Central Drift Chamber small cell +He/C2H5 Si vertex detector 4 lyr. DSSD µ / KL detection 14/15 lyr. RPC+Fe 10 June 2010 T. Bergauer

The Present SVD – Overview 4 layers (6/12/18/18 ladders), r = 2.0…8.8 cm 17°…150° polar angle coverage 246 double sided silicon detectors (DSSDs), 0.5 m2 overall active area VA1TA readout chip (Viking variant; 800ns shaping time) 110592 channels in total 10 June 2010 T. Bergauer

Introduction Belle II: The Future Double Sided Sensors SVD-II Components Readout System Summary 10 June 2010 T. Bergauer

KEKB/Belle upgrade (2010–2014) Aim: super-high luminosity ~81035 cm-2s-1  11010 BB / year LoI published in 2004; TDR was written in spring this year and is presently under review Refurbishment of accelerator and detector required http://belle2.kek.jp 10 June 2010 T. Bergauer

Belle II SVD Upgrade (2010–2014) Ultimately 40-fold increase in luminosity (~81035 cm-2s-1) Present SVD limitations are occupancy (currently ~10% in innermost layer)  need faster shaping dead time (currently ~3%)  need faster readout and pipeline Needs Detector with high background tolerance pipelined readout robust tracking low material budget in active volume (low energy machine) Current SVD is not suitable for Belle II 10 June 2010 T. Bergauer

Present SVD Layout (until 2010) 4 straight layers of 4" double-sided silicon detectors (DSSDs) Outer radius of r~8.8 cm Up to 3 sensors are ganged and read out by one hybrid located outside of acceptance 10 June 2010 T. Bergauer

SVD-II Layout (2014-) Geometry optimization is underway 4 layers of double-sided strip sensors Double-layer of DEPFET pixels Geometry optimization is underway New central pixel double-layer using DEPFET Strip layers extend to r~14 cm Every sensor is read out individually (no ganging) to maintain good S/N  chip-on-sensor concept 10 June 2010 T. Bergauer

Introduction Belle II: The Future Double Sided Sensors SVD-II Components Readout System Summary 10 June 2010 T. Bergauer

Vendors for 6” DSSD Aim is to use double sided silicon detectors with AC-coupled readout and poly-silicon resistor biasing from 6 inch wafer Hamamatsu decided in the past to abandon the production of double sided sensors Thus, negotiations with Canberra, SINTEF and Micron started Finally HPK could be convinced to restart DSSD production on 6” wafers 6” prototypes ordered from Hamamatsu (rectangular): First batch delivered in April Micron (trapezoidal): First batch in July 10 June 2010 T. Bergauer

Thomas Bergauer (HEPHY Vienna) SVD Layout Layer # Ladders Rect. Sensors [50μm] [75μm] Wedge Sensors APVs 6 17 68 850 5 14 42 560 4 10 20 300 3 8 16 192 Sum: 49 130 41 1902 19. Nov. 2009 Thomas Bergauer (HEPHY Vienna)

First batch from HPK First 20 pieces of 6’’ sensors have been delivered in April 2010 Technical details: Dimensions: 59.6 x 124.88 mm p-side: Readout pitch: 75 µm 768 strips n-side: Readout pitch: 240 µm 512 readout strips n-side P-stop scheme 10 June 2010 T. Bergauer

First Batch of 6” DSSD from HPK Electrical Characterization IV, CV Stripscan (p- and n-side) Longterm stability vs. temperature and humidity Inter-strip resistance and capacitance currently under investigation Pull-tests to show bondability ok 10 June 2010 T. Bergauer

HPK Polysilicon Resistors Specifications of Polysilicon Resistors 18 March 2010 by HPK Process parameters Poly resistor Measurment results (Mega Ohm) Serial No. Pside Nside   MAX MIN AVE 1 P1 N1 17.6 15.1 16.3 2 P2 46.3 35.6 41.1 3 P3 7.1 6.4 6.8 4 N2 5 20.5 15.3 17.4 6 7.2 6.2 6.5 7 N3 3.3 2.7 2.9 8 9 10 11 12 13 14 15 16 17 18 19 10 June 2010 T. Bergauer

Trapezoidal Sensors (Micron) Full wafer designed using self-developed framework Including test structures and mini sensors to test different p-stop designs Delivery due July 2010 Trapezoidal sensor with test structures Sensor “programming language” 10 June 2010 T. Bergauer

Introduction Belle II: The Future Double Sided Sensors SVD-II Components Readout System Summary 10 June 2010 T. Bergauer

APV25 Readout Chip Schematics of one channel Developed for CMS (LHC) by IC London and RAL (70k chips installed) 0.25 µm CMOS process (>100 MRad tolerant) 40 MHz clock (adjustable), 128 channels 192 cell analog pipeline  no dead time 50 ns shaping time  low occupancy Noise: 250 e + 36 e/pF  must minimize capacitive load!!! Multi-peak mode (read out several samples along shaping curve) Thinning to 100µm successful 10 June 2010 T. Bergauer

APV25 – Hit Time Reconstruction Possibility of recording multiple samples (x) along shaped waveform (feature of APV25) Reconstruction of peak time (and amplitude) by waveform fit Will be used to remove off-time background hits Measurement 10 June 2010 T. Bergauer

Occupancy Reduction 10 June 2010 T. Bergauer

Origami – Chip-on-Sensor Concept Chip-on-sensor concept for double-sided readout Flex fan-out pieces wrapped to opposite side (hence “Origami“) All chips aligned on one side  single cooling pipe Side View (below) Prototype for 4” DSSD (later with 6” sensors) 10 June 2010 T. Bergauer

First Origami Module (2009) 4th Open Meeting of the Belle II Collaboration First Origami Module (2009) Top and bottom side Origami concept (4” sensor) Prototype completed in August 2009 Successfully evaluated in lab and beam tests Currently building module based on 6” sensor 10 June 2010 T. Bergauer 23

Second Origami Module (2010) Now using new 6 inch sensors Kapton PCB and pitch-adapters ordered by Japanese company Currently under test in Vienna Followed by complicated assembly procedure 10 June 2010 T. Bergauer

Sketch of the Outermost Ladder (Layer 6) Composed of 5 x 6” double-sided sensors Center sensors have Origami structure Border sensors are conventionally read out from sides ca. 60cm Cooling pipe Electronics for border sensor Structural element (CF) Connector (Nanonics) Flex circuits Electronics for border sensor 10 June 2010 T. Bergauer

Ladder Mechanics (preliminary) Cooling Pipe Sensor Carried by ribs made of carbon fiber and Rohacell Averaged material budget: 0.58% X0 Cooling options under study Conventional liquid cooling CO2 cooling Support Ribs 10 June 2010 T. Bergauer

Introduction Belle II: The Future Double Sided Sensors SVD-II Components Readout System Summary 10 June 2010 T. Bergauer

Readout System Prototype readout system exists Verified in several beam tests Basis for future SVD system shown below 10 June 2010 T. Bergauer

Prototype Readout System Repeater Box Level translation, buffering FADC+PROC (9U VME) Digitization, zero-suppression, hit time reconstruction 10 June 2010 T. Bergauer

Beam Tests KEK (Apr 2005) PSI (Aug 2005, Aug 2006) KEK (Nov 2007, Nov 2008) CERN (June 2008, September 2009) 10 June 2010 T. Bergauer

Introduction Belle II: The Future Double Sided Sensors SVD-II Components Readout System Summary 10 June 2010 T. Bergauer

Summary KEKB is the highest luminosity machine in the world Upgrade of KEKB and Belle (2010-2014) 40-fold increase in luminosity Needs upgrades of all subdetectors New, enlarged Silicon Vertex Detector DEPFET pixel double-layer Four strip layers Strip Detector R&D New 6” Double Sided Strip Detectors by HPK Origami chip-on-sensor concept for low-mass DSSD readout Readout with hit time reconstruction for improved background tolerance (up to 100x occupancy reduction w.r.t. now) 10 June 2010 T. Bergauer

Backup Slides 10 June 2010 T. Bergauer

Beam Parameters KEKB Design KEKB Achieved : with crab SuperKEKB High-Current SuperKEKB Nano-Beam Energy (GeV) (LER/HER) 3.5/8.0 4.0/7.0 by* (mm) 10/10 5.9/5.9 3/6 0.27/0.42 ex (nm) 18/18 18/24 24/18 3.2/2.4 sy(mm) 1.9 0.94 0.85/0.73 0.059 xy 0.052 0.129/0.090 0.3/0.51 0.09/0.09 sz (mm) 4 ~ 6 5/3 6/5 Ibeam (A) 2.6/1.1 1.64/1.19 9.4/4.1 3.6/2.6 Nbunches 5000 1584 2503 Luminosity (1034 cm-2 s-1) 1 2.11 53 80

KEKB accelerator upgrade Crab cavity 3.5GeV e+ 8GeV e- New beam-pipes with ante-chamber Damping ring for e+ New IR with crab crossing and smaller by* More RF for higher beam current SR beam 10 June 2010 T. Bergauer

Belle-II New dead-time-free pipelined readout and high speed Faster calorimeter with waveform sampling and pure CsI (endcap) New particle identifier with precise Cherenkov device: (i)TOP or fDIRC. Endcap: Aerogel RICH KL/m detection with scintillator and next generation photon sensors Background tolerant super small cell tracking detector Si vertex detector with high background tolerance (+2 layers, pixels) New dead-time-free pipelined readout and high speed computing systems 10 June 2010 T. Bergauer

Micron Wafer Layout 19. Nov. 2009 Thomas Bergauer (HEPHY Vienna) 3 different GCDs for the n-side Quadratic baby sensors 2,3,4 p-side: 512 strips 50 µm pitch 1 interm. strip n-side: 256 strips 100 µm pitch 0 interm. strip different p-stop patterns Main sensor p-side: 768 strips 75-50 µm pitch 1 interm. strip n-side: 512 strips 240 µm pitch combined p-stop Teststructures for p-side 1) atoll p-stop varying distance from strip 2) conventional p-stop varying width 3) combined p-stop Baby sensor 1 p-side: 512 strips 50 µm pitch 1 interm. strip n-side: 512 strips 100 µm pitch atoll p-stop 1) 2) 3) Teststructures for n-side (no GCD) 19. Nov. 2009 Thomas Bergauer (HEPHY Vienna)

Thomas Bergauer (HEPHY Vienna) Micron: p-stop layout combined p-stops connected p-stops isolated 19. Nov. 2009 Thomas Bergauer (HEPHY Vienna)

Current Barrel Layout Origami Cooling Tubes Slanted Sensors Layer Sensors/ Ladder Origamis/ Ladders Length [mm] Radius [mm] Slant Angle [°] 3 2 7/8 262 38 4 1 10 390 80 11.9 5 14 515 115 17.2 6 17 645 140 21.1 Origami Cooling Tubes Slanted Sensors Hybrid Boards 10 June 2010 T. Bergauer

Comparison VA1TA – APV25 VA1TA (SVD) Commercial product (IDEAS) Tp = 800ns (300 ns – 1000 ns) no pipeline <10 MHz readout 20 Mrad radiation tolerance noise: ENC = 180 e + 7.5 e/pF time over threshold: ~2000 ns single sample per trigger APV25 (Belle-II SVD) Developed for CMS by IC London and RAL Tp = 50 ns (30 ns – 200 ns) 192 cells analog pipeline 40 MHz readout >100 Mrad radiation tolerance noise: ENC = 250 e + 36 e/pF time over threshold: ~160 ns multiple samples per trigger possible (Multi-Peak-Mode) 10 June 2010 T. Bergauer

Measured Hit Time Precision Results achieved in beam tests with several different types of Belle DSSD prototype modules (covering a broad range of SNR) 2...3 ns RMS accuracy at typical cluster SNR (15...25) Working on implementation in FPGA (using lookup tables) – simulation successful (TDC error subtracted) Origami Module 10 June 2010 T. Bergauer

Origami Material Budget X0 comparison between conventional and chip-on-sensor (4” sensors): +50% increase in material, but also huge improvement in SNR Trade-off between material budget and SNR According to simulation, additional material is prohibitive in 2 innermost layers, but no problem for layers 3-5  OK with layout 10 June 2010 T. Bergauer

Maximum Radiation Length Distribution APV Kapton Pipe Coolant Sensor CFRP Rohacell 10 June 2010 T. Bergauer

Cooling Boundary Conditions Power dissipation/APV: 0.4 W 1 Origami sensor features 10 APVs Origamis/Ladder Ladders APVs Origami APVs Hybrid Layer 6 3 17 510 340 Layer 5 2 14 280 Layer 4 1 10 100 200 Layer 3 8 192 Total Origami power dissipation: 356 W 404 W dissipated at the hybridboards Total SVD power dissipation: 760 W 10 June 2010 T. Bergauer