9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
More CMM Part Two : Details.
First Article Inspection Report
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
First Article Inspection
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Effective Methods for Software and Systems Integration
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Introduction to Software Quality Assurance (SQA)
From Research Prototype to Production
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Development Plans, Logistics, and Facilities Fred Best 9 March 2004.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Software Project Configuration Management
EFW DFB Systems Assurance
EFW DFB Systems Assurance
THEMIS Mission Assurance
ISUAL Product Assurance
University of California - Berkeley
Flooding Walkdown Guidance
First Article Inspection
Peer Review Agenda (Suggested).
Quality Management Systems – Requirements
GLAST Large Area Telescope:
BRIAN KLATT MISSION ASSURANCE MANAGER
Integration and Test Organization Chart
First Article Inspection
HART Technologies Process Overview
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004

9 March 2004 Slide 2 Cost Total Spending through Jan 04:$1,430,176 Total of latest Request to SDL:$1,954,515 Balance to complete program $ 524,338

9 March 2004 Slide 3 Past and Projected Spending Time of Projected Delivery Time Funding will be spent Spending by Month on GIFTS BB Project

9 March 2004 Slide 4 Schedule Updated project schedule shows the following key delivery dates: –Blackbody Alignment Tools: –Flight Blackbodies and Controller: Other key dates –Flight parts needed for board assembly: –Flight Surrogate Cable for calibration:

9 March 2004 Slide 5 Procurement Plan UTMC Aeroflex will get the Controller Board fabricated (Coretec) and will assemble using UW provided parts. Board fabrication vendor may be the same one used for EM-1 and EM-2, or we may go with the same vendor as SDL if it is different. Thermometrics is providing the S-60 thermistors in UW provided housings. Electronics Parts status provided on next page.

9 March 2004 Slide 6 Flight Parts Status All UW parts on hand except #17, #13 - expect in time for board assembly

9 March 2004 Slide 7 Resources Blackbody –UW has all resources necessary to fabricate and assemble the blackbody. –SDL will provide Blackbody MLI. –Random Vibration can be done either at UW or SDL. –SDL facilities will be used for Thermal Vacuum Testing. Controller –UTMC Aeroflex will manufacture and assemble the board (to UW design, using UW provided parts) –UW has resources to perform temperature cycling and acceptance testing over required temperature range. –SDL will conformal coat board –SDL will perform Random Vibration in box fixture.

9 March 2004 Slide 8 Resources Blackbody/Controller –UW has all the resources and facilities to perform the end-to-end calibration of the Blackbody subsystem.

9 March 2004 Slide 9 Document Control Documents numbered –# format: (8300 = GIFTS Project) – is the Drawing List –Documents numbered in sequence (no “intelligent” number scheme) Major features –Drawing list is source of information about current revision of document –Pre-release: originator can update as needed and drawing list will have date of latest version

9 March 2004 Slide 10 Document Control –After release: changes only by ECN –All ECNs result in Rev change (8300-xxxx Rev N is complete definition - no ECN as part of doc reference) Control –Source files stored in central FTP location –Drawing list searchable on-line –Current PDF available via web search/browse page

9 March 2004 Slide 11 Configuration Management CIL basis of hardware CM Manufacturing records show all assembly & test steps - includes lower level assy & test records - part traceablility Result: can answer questions about what is where, what was done, who did it, etc.

9 March 2004 Slide 12 Product Assurance Requirements GIFTS Specific Product Assurance Requirements are derived from the Statement of Work and Product Assurance Plan. The GIFTS specific Quality Assurance Implementation Plan describes the methods and controls to be implemented by the University of Wisconsin. The requirements of GIFTS specific Product Assurance Implementation Plan are levied to subcontractors and suppliers. Personnel training and certification to NASA standards. Identification of risk and evaluation during all aspects of the work. Support design reviews, manufacturing readiness reviews, test readiness reviews, and pre-ship reviews.

9 March 2004 Slide 13 Product Assurance Roles & Responsibilities The GIFTS Performance Assurance Manager (PAM) shall direct and monitor the activities to assure conformance, identify the need for preventive and/or corrective actions, and implement them when necessary. The PAM shall coordinate all Safety, Reliability, and Quality Assurance issues and will report progress to SDL.

9 March 2004 Slide 14 Product Assurance Roles & Responsibilities Product Assurance activities include: –EEE Parts Engineering and Electronic Packaging –Radiation Effects Analysis –Reliability Engineering –Quality Assurance –Review and Inspection –Procurement Product Assurance –System Safety –Material and process control

9 March 2004 Slide 15 Product Assurance Roles & Responsibilities Product Assurance activities include cont’d: –Manufacturing and process control –Nonconformance Control & Reporting using close loop work order database (WOA) Problem Report (PR) Material Review Board (MRB), Waiver, Failure Analysis and Corrective Action report (FACR) –Ground Test Software Quality Assurance –Configuration Control

9 March 2004 Slide 16 Product Assurance Roles & Responsibilities Verify workmanship standards. Train and certify personnel on ESD, contamination control, manufacturing processes and procedures. Inspect and witness testing of hardware. Verify test equipment calibration. Conduct surveys and perform audits of subcontractors and manufacturers. Provide test software quality assurance. Ensure contamination control requirements are met. Identify, review and approve special processes. Review, approve, and control work orders, problem reports, and failure reports.

9 March 2004 Slide 17 Create Work Order With Unique ID # View / Modify Work OrderApprove Work Order Work Order Forms Button Work Order Status Reports Button Work Order Status (All)Work Order Status (Open) Authorized Manager List Integration & Testing Mechanical Electrical Systems Quality Assurance Other Date Initiated Originator Responsible Person Description of Work Required Documents Flight or Non-Flight Part and Serial ID Required Support / Yes or No QA Witness QA Final Inspection Safety Photograph Update and/or Revise Work Order Events Add Events Delete Events Perform Work Order Events Event Problems Resolved ? No Closeout Work Order With QA and Program Manager Approval Yes # Work Orders Generated # Opened # Closed Problem Status # Work Orders Open Date Opened # Days Opened Problem Status Green or Yellow Status Yes No MRB or FACR Resolved? Computer Controlled Work Order and Problem Record Process Flow

9 March 2004 Slide 18 Reliability and Quality Assurance Program Parts Selection & Application System Design Workmanship & Testing Integration & Testing Understanding the Environment Design Margin Review Internal Peer Review Test Level 2 parts as per GSFC 311-INST-001 Part Derating to PPL-21 GIDEP review of all parts Stress Analysis Parts review Testing where required Test Random Failures (ground equipment, etc.) Test Close loop anomaly system & continuous risk management Shipping and Transport Flow Down of Requirements of GIFTS Product Assurance Plan Flight Fabrication Reliability Verification FMEA when required Questions answered – what can go wrong, what is likely, what are the consequences. Mitigate risks Manufacturing readiness review. Approved procedure Close loop anomaly system with continuous risk management. Inspection as per approved procedures Test readiness review. Inspections Approved procedures Controlled environments

9 March 2004 Slide 19 EEE Parts, Electronic Packaging and Traceability Requirements Requirements Summary –Parts screening and qualification per GSFC 311-INST- 001, Level 2, requirements derived from the GIFTS- IOMI statement of Work. –SDL/LaRC review and approve EEE Part Lists. –Derate EEE Parts per PPL-21 –Perform GIDEP Search –Parts Control Board (PCB) Approach, a partnership arrangement with NASA/LaRC parts engineer and SDL.

9 March 2004 Slide 20 EEE Parts and Traceability Implementation Plan Part lists are reviewed and approved by the project team prior to flight procurements. Special considerations include: –Radiation evaluation of all active components –Radiation testing (TID and/or SEE ) when necessary –No pure tin, cadmium, and zinc plating is allowed –Single lot (preferred), date code, traceability from part procurement, assembly, rework, and integration testing via parts identification and as build part lists

9 March 2004 Slide 21 EEE Parts and Traceability Implementation Plan Special considerations include cont’d: –Mandatory surge current testing on all tantalum capacitors –Age control requirements. Lot Date Code (LDC) older than 9501 requires DPA and room temperature re- screen –Parts traceability from procurement to assembly of boards. –GIDEP Alerts & NASA Advisories review and disposition –Parts Identification list (PIL) includes LDC, MFR, Radiation information of the flight lot

9 March 2004 Slide 22 No Hazards Identified for GIFTS BB Subsystem