1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?

Slides:



Advertisements
Similar presentations
Demystifying 6.
Advertisements

Guide to Business Improvement Tools
Lean Six Sigma Project Presentation Template
Project Storyboard Template
Roberto lopez LSSMBB DMAIC project template.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
1 Industrial Design of Experiments STAT 321 Winona State University.
Using Microsoft Project for Implementation of Six Sigma Projects A Tools and Tips Presentation Nora Gessert, Pcubed.
“Safety is a Measure of Success”
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Practical Assessment Project Template
Sigma Lean Execution Plan for Black Belts
Copyright © Six Sigma Academy International LLC All Rights Reserved Introduction To Measure.
MEASURE Copyright Six Sigma Innovations MEASURE Copyright Six Sigma Innovations Where Will Six Sigma Get Us? Everyone will be focused on.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Project Briefing Type Briefer Organization Here
Project Title GB or BB name: XYZ.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Designing products, services, and processes that satisfy both client.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
UNIT 5.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Six Sigma.
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six Sigma Approach.
Improving Existing Products & Services
Six Sigma Greenbelt Training
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Chapter 2 Six Sigma Installation
Quality Certification
DMAIC Project Template
Quality Management Six Sigma
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
Certification Resources Workbook
Measure Phase Wrap Up and Action Items
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

1 Russ Albright, Director

2 Overview Vision and motivation What is Six Sigma?

3 External Six Sigma Results CompanyAnnual Savings General Electric$2.0+ billion JP Morgan Chase*$1.5 billion (*since inception in 1998) Texas Instruments$600 million Johnson & Johnson$500 million Honeywell$600 million Sun has launched a Six Sigma program “SunSigma” focused on improving product quality and reliability (software & hardware)

4 What Is Six Sigma? Six Sigma is a project based problem solving approach that focuses on reducing/preventing defects resulting in increased customer satisfaction and lower costs. Key components are: Project Selection People Disciplined project methodology  DMAIC- Problem solving  DMADI- Product design and Prevention Data analysis and collection tools

5 Project Selection Attributes of a good Six Sigma project: Strong tie to business deliverables  Enhances customer satisfaction and loyalty  Strategic importance  Impact on profit (hard and soft benefits) Results are visible or easily link to a key executive metric  Meaningful results within 6 months (DMAIC only)  Goals can be quantified and measured Project is feasible  Team can commit time to project  Potential solutions are relatively low cost

6 Six Sigma People Executive sponsorship  Clear link between project and critical business goal  Executive is visible and supportive of team efforts  Executive breaks down barriers to improvement Dedicated project manager  Black Belt for large or difficult projects, or projects that require statistical analysis  Green Belt for a smaller project within her/his team Virtual team  Represents the people directly impacted by the problem and will be involved in the improvements  Cross-discipline and cross-group as needed  Data driven decisions greatly enhance cross-group work

7 Six Sigma Project Methodology Control Define Measure Analyze Improve  Lock in the results (control plan) Mistake proofing Control points Monitoring Plan Positive hand off of control plan  Financial impact of the project  Project selection  Project charter  Critical to Customer (CTQ) needs  High level process map  Key output variables (metrics or Y’s)  Possible causes of defects (X’s)  Data collection and presentation plan  Current Performance  Internal/ external benchmarking  Key causes (vital few) of defects (X’s)  Improvement strategy  Prioritize solutions  Tested & measured solutions  Final solutions Project Phases and Deliverables

8 Design for Six Sigma Methodology Implement Define Measure Analyze Design  Implement product/ service  Validated product/ service  Project closure  Final control plan  Product opportunity  Project charter/goals  Project plan  Secondary and primary customer research  Critical customer requirements  Key Product/Service requirements  Product performance  Competitive benchmarks  Conceptual design(s)  Risk assessment  Customer  Implementation  High level implementation process  Functional design  Resource plan  Simulation  Design Scorecard TDPU  Control plan  Test plan  Risk mitigation Project Phases and Deliverables

9 Six Sigma Toolbox Green Belt tools Benchmarking Brainstorming Cause- Effect diagrams Critical to Customer Tree Data Collection Plan FMEA( Failure modes and effect) Improvement strategy Interviews/ Precision questioning Prioritization matrices Project Charter Project plan template SIPOC- Process flow Surveys Workflow mapping Black Belt tools Activity analysis Affinity diagram Data Presentation  Histogram  Box Plot  Line Graphs  Run Charts  Control Charts  Pareto Chart  Bar Graphs  Stacked Bar Graphs  Pie Charts Design of experiments  Full factorial  Reduced fractions  Screening designs Hypothesis tests  t- test  Paired t-test  ANOVA  Chi Square Process sigma Kano modeling Quality Functional Deployment(QFD) Regression Rolled throughput and final yield Sampling Stratification

10 Project Best Practices Projects impact the business scorecard, key initiative, lowlights Executive sponsor status updates at the end of each project phase Weekly updates with Business Process owner and team Dedicated resources (Black/Greenbelts) to manage the project Detailed project plans developed and communicated to team and sponsors Project status on a website to share learning