Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA 4.12.2011.

Slides:



Advertisements
Similar presentations
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Advertisements

Aria Health | Torresdale Campus Emergency Department | Expansion Robert M. Stano | AE | Construction Option Adviser | Dr. Chimay Anumba Senior Thesis Presentation.
Pennsylvania State Employees Credit Union Corporate Headquarters Senior Thesis Presentation | lighting / electrical | Sarah Wujcik | | Dr Houser.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Christopher Havens Spring 2012 Dr. Chimay Anumba – CM Advisor Construction Management Penn State AE Senior Capstone Project The Northeastern Pennsylvania.
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
JOHN PAUL JONES ARENA CHARLOTTESVILLE, VIRGINIA JOHN PAUL JONES ARENA CHARLOTTESVILLE, VIRGINIA FINAL DESIGN PRESENTATION LOGAN BROWN LIGHTING/ELECTRICAL.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Adam Trumbour 2010 AE|CM Introduction Building Overview Thesis Overview Breadth Analysis 1: CHPS Study Breadth Analysis 2: Green Roof Breadth Analysis.
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Research Facility Core and Shell (RFCS) Presented by Tim Maffett on April 8 th, 2013.
AE Senior Thesis 2007 Bloomindales Department Store Chevy Chase, MD.
Paul Roberts Senior Thesis 2010 Construction Management.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Senior Thesis Presentation 2009 The Pennsylvania State University.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
PENN STATE AE SENIOR CAPSTONE PROJECT Adam Lasher │Construction Management Dr. Robert Leicht Susquehanna Health Patient Tower Expansion Williamsport, PA.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
1 Penn State AE Senior Capstone Project Ryan Korona | Construction Management Dr. David Riley – CM Advisor Indian Valley High School Lewistown, PA.
AE Senior Thesis Natalie Bockhorst│Construction Management Chimay Anumba, PhD. PE Advanced Individual Training A.I.T. Barracks Fort Eustis, VA.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
HAMAD ALRAHMANI ARCHITECTURAL ENGINEERING SENIOR THESIS PRESENTATION
Penn State AE Senior Capstone Project
North Hall | American University| Washington D.C.
Redifer Commons Addition & Renovation Project
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Daniel Suter Unknown Data Center Somewhere, USA
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
AMBRIDGE AREA HIGH SCHOOL
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Architectural Engineering, The Pennsylvania State University
Coppin State University
Presentation transcript:

Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA

Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Electrical Breadth Tablet PC’s for Commissioning Acknowledgements Questions Presentation Outline:

PROJECT OVERVIEW o Owner – Anonymous o Occupancy Type - Business o Size - 17,445 SF South Expansion o Cost - $ 50 Million (Design+Construction) o Construction Duration - December 2008 – August 2010 o Delivery Method - Design-Bid-Build o Project Team CM – Turner Construction Architect/Engineers – Sigma 7 Design Group Civil – Birdsall Services Group Structural – Goldstein Associates 3 Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Conclusions Acknowledgements Questions

Presentation Outline: PROJECT OVERVIEW 4 Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Conclusions Acknowledgements Questions o Building Enclosure Architectural Precast Panels Total of 33 Panels to enclose the building Penthouse enclosed with EIFS o Existing Roof Structure: Primary Roof - Composite, EPDM w/ Concrete Pavers Penthouse Roof – Composite, Standing Seam Metal Roof

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Façade Redesign/Tilt-Up Construction o Opportunity Redesigning the 20’ Parapet Wall Tilt-up vs. Precast o Objective Lower Material/Labor Cost Accelerate Schedule 5 Project Overview Façade Redesign/Tilt-Up Construction Area of Potential Improvement Proposed Design Tilt-Up Sequence Cost Analysis Schedule Impact Conclusion Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Façade Redesign/Tilt-Up Construction o Conceptual Design: o Deduction of 10’ o Design Criteria: o Line of Sight o Penthouse vs. Building Enclosure 6 Project Overview Façade Redesign/Tilt-Up Construction Area of Potential Improvement Proposed Design Tilt-Up Sequence Cost Analysis Schedule Impact Conclusion Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Façade Redesign/Tilt-Up Construction o Sequence o Follow the same sequence as Precast (33) o Panels are formed and stacked onsite o Site Layout o Need to Revise Site Layout Plan o Tilt-up Increases Site Congestion 7 Project Overview Façade Redesign/Tilt-Up Construction Area of Potential Improvement Proposed Design Tilt-Up Sequence Cost Analysis Schedule Impact Conclusion Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Façade Redesign/Tilt-Up Construction o RS Means: o $41.5/ SF – Precast o $15/ SF – Tilt-up o Total Savings o $160,000 – Includes design o $327,000 – Includes design and method 8 Project Overview Façade Redesign/Tilt-Up Construction Area of Potential Improvement Proposed Design Tilt-Up Sequence Cost Analysis Schedule Impact Conclusion Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Façade Redesign/Tilt-Up Construction o Schedule Impact: o Precast – 3.3 panels / day o Tilt-up – 4 panels / hour o 33 panels in a nine hour work day o 9 days cut off cut from the critical path 9 Project Overview Façade Redesign/Tilt-Up Construction Area of Potential Improvement Proposed Design Tilt-Up Sequence Cost Analysis Schedule Impact Conclusion Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Façade Redesign/Tilt-Up Construction o Conclusion: o Total Savings of 327,000 o 9 Days off the Critical Path o Recommendations: o The owner should pursue Tilt-up Method, but take note on the safety issues and quality concerns. o Highly recommended for the Redesign – Savings of $160,000 o Money could pay for PV system 10 Project Overview Façade Redesign/Tilt-Up Construction Area of Potential Improvement Proposed Design Tilt-Up Sequence Cost Analysis Schedule Impact Conclusion Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o Opportunity o Building is Oriented South o Opportunity to utilize the Penthouse roof for design o Objective o Design a Preliminary Photovoltaic System o Perform a Financial Feasibility Study o Reduce Energy Cost of the Building 11 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o What will the power from the panels essentially replace? o Conclusion: o The design will be able to power all of the lighting fixtures in the building. o 125 panels required – Design consist of 129 panels o 105 panels located on west penthouse o 24 panels located on east penthouse 12 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o Calculate Optimal Tilt in Panels o West Penthouse – 40° o East Penthouse - 32° o Determine Most Efficient Panel: o Sanyo Electric, HIP-200BA19/20 13 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o PV Watts Calculations: o System Produces 31,000 kWh / Year o Yearly Savings of $ Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o Energy Distribution: o DC – Inverter – AC – Grid system o Inverter: o Sunny Tower ST 36 o Easy mount o Includes all DC/AC connections o Voltage Drop: o DC - Use #8 AWG Wire 15 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o Total System Cost: o $250,000 o W/ Rebates and Incentives: = $160,000 o Potential Buy back – years 16 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions o Schedule Impact: o Once the penthouses are constructed, the PV contractor can start o Main Concern is Crane Usage o Should not affect the critical path

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Alternate Roof Type – Photovoltaic System o Conclusion : o Up front cost - $160,000 o Potential Buyback of years o Does not affect schedule’s critical path o Recommendation: o Highly recommended for the owner to consider this preliminary design. o Owner has potential to pay for the whole up front cost of this system 17 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Area of Improvement Proposed PV System Electrical Breadth Cost Analysis/Schedule Impact Conclusion Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Tablet PCs for Commissioning o Tablet PC Use: o Quality Control o Punch List Management o Production Tracking o Materials Management o Safety o Commissioning o BIM in the Field o Visual Reporting 18 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Introduction Potential Benefits/Challenges Case Study Conclusion Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Tablet PCs for Commissioning o Potential Benefits: o Store PDF and paper forms of the budget, schedule, and specs. o Easier to organize and manage while onsite o Record performance of mechanical equipment o Record issues during the commissioning process o Reference the data on future projects 19 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Introduction Potential Benefits/ Challenges Case Study Conclusion Acknowledgements Questions o Challenges: o Tablet are exposed to hazards on the construction jobsites o Weather may affect the life of the tablet o Lack of knowledge in this industry o Using the tablets to it’s full advantage

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Tablet PCs for Commissioning o Case Study (Maryland General Hospital) o Barton Malow – CM o $57 Million renovation o Includes an array of indoor AHU o 650 –ton electric chillers/cooling towers o Tablets for commissioning o Collected data and documents as one integrated unit with their 3D model. o Eliminated all data re-entry o Commissioning and their BIM Model totally in synched 20 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Introduction Potential Benefits/Challenges Case Study Conclusion Acknowledgements Questions “The same tasks that used to take us days to manage and track, now take just hours”

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Tablet PCs for Commissioning o Recommendations: o All CM firms to use tablet PCs for the whole construction process o For commissioning – highly recommended for complex MEP projects (hospitals, data centers) o Conclusion: o Hard to determine actual value in cost and schedule acceleration. 21 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Introduction Potential Benefits/Challenges Case Study Conclusion Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Acknowledgements o Academic Acknowledgments o Penn State AE Faculty o Dr. Rob Leicht o Industry Acknowledgements: o Turner Construction o Sigma 7 Design Group o Special Thanks to: o Frank Turner Construction o Tom Turner Construction o Family and Friends 22 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions

Presentation Outline: Daniel Suter | Construction Management | Unknown Data Center Somewhere, USA Questions 23 Project Overview Façade Redesign/Tilt-Up Construction Alternate Roof Type – Photovoltaic System Tablet PC’s for Commissioning Acknowledgements Questions