TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.

Slides:



Advertisements
Similar presentations
The Smart Battery Assembly Process
Advertisements

Line Efficiency     Percentage Month Today’s Date
1 James M c Intyre. 2 Outline Overview  TAGM Milestones  Documents & Travelers  Personnel Training  Special Training & Hazards Construction Plan 
EET Survey of Electronics Chapter 7 - Simple Series, and Parallel circuits.
Distributed Voltage Controlled Oscillator Team Members: Dane StiversTodd Beyer Tim MacShaneMonica Studnicki Advisor: Dr. Prasad N. Shastry Funded By: Electrical.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Brittany Qualls 4 th period.  Motherboard - is the central printed circuit board (PCB) in many modern computers and holds many of the crucial components.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Questions on IFPAC_SCHEMATIC. Signal Chain Preamplifier Compensation Capacitor should go to –Vs, not GND Where is resistor For compensation Network? Does.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Computer Components Natasha Baker.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
US Belle II Project – Technical Elements David Asner Pacific Northwest National Laboratory.
Jan 2016 Solar Lunar Data.
Project Management W. J. Foyt
IT Strategy Roadmap Template
Timeline Roadmap Template
Power Supply Development for JEDI Polarimeter Modules
G0 Detector Working Group Meeting
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Performance based contract I-MHERE Project
Tour of the Facility Clean Organized Facility And Latest Equipment
Appendix C New Administration General Assembly Session
Average Monthly Temperature and Rainfall
Status of n-XYTER read-out chain at GSI

Self-Insurance Application Schedule – Key Dates*
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Tagger Microscope Detector & Electronics Status
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
GLAST Large Area Telescope
Power of Choice (PoC) Program Overview

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
XRN Feb 19 Minor Release - Status Update
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2013 Safety Group Advantage Program Timeline
Presentation transcript:

TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes

Outline  Final Construction Plan  Facilities  Quality Assurance Plans and Acceptance Test Plans  Documentation and Travelers  Personnel Training  Schedule and Tracking 2 Readiness Review February 7, 2013

Final Construction Plan  Board design packages submitted to JLab for review  Assembly of 1 st articles  Complete testing of 1 st article boards  Complete assembly and testing of all boards  Complete software for cosmic-ray testing  Complete software library for control/monitoring of bias voltages  Complete cosmic-ray testing of detector 3 Readiness Review February 7, 2013

Facilities – Receiving and Inspection  Dedicated receiving and inspection benches  An ESD mat will be added to our inspection bench 4 Readiness Review February 7, 2013

Facilities - Storage  Electronic components will be stored in bins with static bag layers  Each type of board has its own set of bins  There will be a bin for each stage of construction  Each will be labeled appropriately 5 Readiness Review February 7, 2013

Facilities – Assembly and Repair  The micro-inspection and repair bench has both a soldering iron and a hot air gun  Microscope for small components 6 Readiness Review February 7, 2013  Dc testing bench has an ESD mat and will have its own power supplies

Facilities - Testing 7 Control board testing bench: Original dark box Can test new control boards Pulser capabilities Readiness Review February 7, 2013 Second testing bench: JLab FADC Computer with CODA Can be used for all aspects of quality assurance

Quality Assurance - Preamplifiers  Initial visual component inspection  Preamp regulated voltages and dc levels  High/low gain pulse shapes with pulser circuit  Low: measure and compare single and summed outputs  High: use 10x attenuator, measure and compare low and high summed outputs, measure single pixel pulse height  Electronic crosstalk  Performance tests  Cosmic ray detection  Extended runtime with pulser circuit 8 Readiness Review February 7, 2013

QA – Control Board and Backplane  Control board  Initial visual component inspection  Programming of the FPGA  FPGA execution of the software suite  Backplane  Initial visual component inspection  Visually examine Lemo connectors 9 Readiness Review February 7, 2013

Documentation and Travelers  Travelers will be kept with the parts  Preamplifiers: Inspection, soldering, dc voltage tests, pulse shape tests, crosstalk, cosmic, final performance  Control boards: inspection, soldering, FPGA programming, software suite execution notes  Backplanes: inspection, soldering 10 Readiness Review February 7, 2013

Personnel Training  Students will be required to complete UConn lab safety training  I will teach students how to inspect boards  Soldering of the Eurocards will be supervised and only students deemed capable will be trained  Students measuring dc voltages will have a reference sheet as well as a logbook and will be taught by me 11 Readiness Review February 7, 2013

Schedule and Tracking  All boards will have their SN engraved upon inspection  Assuming 01 Jan 2013 start date:  Board design submission – 25 Mar 2013  Receipt of 1 st article boards – 20 May/17 Jun 2013  Assembly of 1 st article boards – 17 Jun/01 Jul 2013  Testing of 1 st article boards – 15 Jul/12 Aug 2013  Receipt of all boards – 12 Aug 2013  Assembly and testing of all boards – 21 Oct 2013  Software for cosmic testing – 03 Jan 2014  Software library for control of bias voltages – 03 Jan 2014  Complete cosmic ray testing – 31 Jan Readiness Review February 7, 2013