Watershed Council June 22,2010 BAIRWMP Update BAIRWMP Update State Funding: State Funding: Prop 50 Prop 50 Prop 1-E (Stormwater Flood Management), Prop.

Slides:



Advertisements
Similar presentations
Safe and Sustainable Water Resources Research Integrate the existing Drinking Water and Water Quality research programs into one holistic program that.
Advertisements

Integrating Water Management The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water.
Borrego Valley Borrego Valley Integrated Regional Water Management Planning Integrated Regional Water Management Planning.
Proposed Projects The Bay Institute Students and Teachers Restoring a Watershed ($15k) Napa Resource Conservation District Student and Landowner Education.
1 California Water Plan Update 2009 We Are Here => Work Plan Recap 1 st Plenary Meeting Sacramento October 22-23, 2007.
2013 Bay Area Integrated Regional Water Management Plan Overview Carol Mahoney, Zone 7 Water Agency BAIRWMP Public Workshop July 23, 2012.
Sierra Water Work Group Summit June Upper Mokelumne River Watershed Authority.
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
Department of Water Resources Division of Integrated Regional Water Management Financial Assistance Branch July 17, 2012 Trevor Joseph, P.G., C.HG.
2 1)Familiarize State agency staff with Water Plan Update 2013 information, tools and resources 2)Identify opportunities for State agencies to derive.
Bay Area IRWMP Public Workshop #1 July 23, OBJECTIVES I BAIRWMP-Goals and Objectives II. DWR Guidance- “Measures” III Process IV. Proposed.
October 6, Water Security, Clean Drinking Water, Coastal and Beach Protection Act of 2002 Chapter 3 Water Security Chapter 4 Safe Drinking Water.
WATER BOND Mark Watton General Manager - Otay Water District Speakers: Moderator: Ken Weinberg Director Water Resources - San Diego County Water Authority.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
1 Improving Analytical Capabilities of the California Water Plan Rich Juricich, California Dept. of Water Resources.
1 California Water Plan Update 2013 Delta-Sierra Connections Sierra Water Work Group 2014 Summit June 12, 2014.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
1 California Water Plan Update 2009 Where We’ve Been Where We Are Going South Lahontan Regional Workshop Palmdale July 10, 2007.
1 California Water Plan Update 2009 Resource Management Strategies Overview 1 st Plenary Meeting Sacramento October 23, 2007.
1 California Water Plan Update Administrative Draft Staff Draft Highlights Tribal Water Summit Proposal DWR Executive Briefing.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Clean Beaches Initiative Proposition 50 Draft Guidelines.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
American River Basin Integrated Regional Water Management Plan Update Process SCGA Board Meeting July 13, 2011.
NBWA 2010 Conference Administrative Steering Committee Meeting- May 14, 2009 Target dates *One Friday in April- April 2, 9, or 16 Location Sheraton, Petaluma.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
1 California Water Plan Update 2009 Advisory Committee June 4, 2007.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Integrated Regional Water Management Planning Proposition 50: Integrated Regional Water Management Planning Grant Program North Coast IRWMP: region, process,
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Region Acceptance Process Draft Recommendations Workshop Department of Water Resources Sept 8, Sacramento Sept 9, Los Angeles Sept 10, Fresno.
NBWA Project Update Watershed Council April 27, 2011 Recently funded Projects Recently funded Projects Projects proposed in 2011 Projects proposed in.
John K. Woodling CA Department of Water Resources Integrated Regional Water Management Program Update Southern California Water Dialogue May
State Perspective… Water Reliability, Conservation, Recycling Bill Bennett Department of Water Resources NBWA Conference, Napa April.
Bay Area IRWMP Project Review Process Stakeholder Workshop #1 Association of Bay Area Governments July 23, 2012 Carl Morrison.
April 12, 2010 – Sacramento April 13, 2010 – Santa Rosa April 14, 2010 – Ventura April 20, 2010 – South Lake Tahoe.
Watershed Council BAIRWMP Update 1/25/2011 Watershed Council BAIRWMP Update 1/25/2011 Prop 84 Planning Grant Proposal IRWMP Implementation Grant Proposal.
A Vision for the Future Presented to the North Bay Watershed Association by the Sonoma County Water Agency and Zone 7 Water Agency.
Sierra Water Workgroup Water Summit Kings Beach, California June 11, 2013 Barry Hill, Hydrologist Pacific Southwest Region USDA Forest Service.
SFEP/EPA Proposal Background- prior NBWA grant EPA Funds and Process SFEP Process EPA Approval and Schedule NBWA Proposal-$1.5 Million Other Funds.
Cooperating Partners Presentation October 12, 2006 Integrated Regional Water Management Plan (IRWMP) B S Strategies and Objectives C ANTA ARBARA OUNTY.
Watershed Council June 25, DWR Funding and Bay Area IRWMP Project Selection Background Regional Acceptance Process (RAP) Regional Projects North.
IRWM Grant Program Scoping Meeting Department of Water Resources January 23, Sacramento January 31, Alhambra.
California Water Plan Update 2005 Draft Slides for Public Hearings in June April 14, 2005.
BAIRWMP Bay Area Integrated Regional Water Management Plan Background/History Background/History Prop
Bay Area IRWMP North Bay Process for Project Selection I Background II- Decisions-Subareas and Funding III Regional Acceptance Process (RAP) IV North Bay.
1 California Water Plan Update Integrated Flood Management Central Valley Flood Protection Board April 17, 2009.
1 California Water Plan Update 2013 A Roadmap for Integrated Water Management Transportation Planning Conference Transportation Planning Conference December.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Regionalism in Water Resources Management
California Water Plan Update Advisory Committee Meeting January 20, 2005.
One Water LA is a collaborative approach to develop an integrated framework for managing the City’s watersheds, water resources, and water facilities in.
1 Public Workshop Los Angeles June 22, 2005 Public Review Draft California Water Plan Update 2005.
Adapt, Flee, or Perish John T. Andrew Department of Water Resources North Bay Watershed Association Petaluma, California April 4, 2008.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
1 Public Workshop Chino July 13, 2005 Public Review Draft California Water Plan Update 2005.
BAIRWMP Update September 9, 2011 Prop 84 Prop 84 Plan Update Plan Update Implementation Grant Implementation Grant North Bay Process North Bay Process.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Integrated Regional Water Management Grant Program Implemented Jointly by Department of Water Resources and State Water Resources Control Board.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
2018 November Water Bond Act Initiative
San Luis Obispo County Integrated Regional Water Management (IRWM) Region Regional Water Management Group (RWMG) Meeting SLO City/County Library Community.
BAIRWMP Update 6/4/2010 Prop 50 Supplemental funding Prop 1-E
Washington State Infrastructure Financing
Budget Options Background -Baseline Budget -Project funding
BAIRWMP Update 10/1/2010 Background Prop 50 Supplemental funding
American River Basin Integrated Regional Water Management Plan Update Process SCGA Board Meeting July 13, 2011.
Presentation transcript:

Watershed Council June 22,2010 BAIRWMP Update BAIRWMP Update State Funding: State Funding: Prop 50 Prop 50 Prop 1-E (Stormwater Flood Management), Prop 1-E (Stormwater Flood Management), Prop 84 Prop 84 Planning Planning Implementation Implementation Federal Funding Federal Funding

Supplemental Prop 50 schedule 10 % match Maximum Grant -$3.7 million Final PSP-May 5, 2010 Final PSP-May 5, 2010 Application dueJune 1, 2010 Application dueJune 1, 2010 Applicant interviewsJune 20-July 2 Applicant interviewsJune 20-July 2 DWR Draft recommendations- late July DWR Draft recommendations- late July Public comments dueearly August Public comments dueearly August DWR announces awards Mid August DWR announces awards Mid August

Original April Proposal Regional Green Infrastructure $ 800,000 Regional Green Infrastructure $ 800,000 SCVWD Recycling $1,100,000 SCVWD Recycling $1,100,000 Bay Area DAC/ Watershed$ 650,000 Bay Area DAC/ Watershed$ 650,000 Mercury and PCB Risk Reduction $ 300,000 Mercury and PCB Risk Reduction $ 300,000BACWA Regional Steelhead Monitoring$ 370,000 Regional Steelhead Monitoring$ 370,000 CEMAR CEMAR NMWD Phase 2 Recycling $ 280,000 NMWD Phase 2 Recycling $ 280,000 Grant Administration$ 200,000 Grant Administration$ 200,000 TOTAL $3,700,000 TOTAL $3,700,000

Latest Proposal SCVWD Recycling $ 1,500,000 SCVWD Recycling $ 1,500,000 Regional Green Infrastructure $ 850,000 Regional Green Infrastructure $ 850,000SFEP/ABAG NMWD Phase 2 Recycling $ 850,000 NMWD Phase 2 Recycling $ 850,000 Mercury and PCB Risk Reduction$ 300,000 Mercury and PCB Risk Reduction$ 300,000BACWA Grant Admin. BACWA $ 200,000 Grant Admin. BACWA $ 200,000 TOTAL $3,700,000 TOTAL $3,700,000

Prop 1 E Stormwater Flood Management Grant program Draft PSP= March $212 million statewide -Minimum local match-50 % -Maximum Grant Award-$30 million

Requirements Consistent with adopted IRWMP Consistent with adopted IRWMP Designed to manage storm water runoff to reduce flooding Designed to manage storm water runoff to reduce flooding Yield multiple benefits Yield multiple benefits may include one of the following elements: Groundwater recharge Groundwater recharge Water quality improvement Water quality improvement Ecosystem restoration and benefits Ecosystem restoration and benefits Reduction of instream erosion and sedimentation Reduction of instream erosion and sedimentation

BAIRWMP Process Complete an IRWMP Project Template Complete an IRWMP Project Template Submit Submit Subcommittee will screen Subcommittee will screen BAIRWMP Coordinating Committee will vote on acceptance and adding project BAIRWMP Coordinating Committee will vote on acceptance and adding project

Outreach BAFPAA distributing flyer BAFPAA distributing flyer Sub-regions supporting outreach Sub-regions supporting outreach North Bay North Bay -Highlight today -Highlight today June 15 Joint technical Committee meeting June 15 Joint technical Committee meeting June 22-Watershed Council June 22-Watershed Council

Prop 84 Planning Guidelines Planning Guidelines Implementation Guidelines Implementation Guidelines Bay Area Process Bay Area Process

Planning Guidelines $20 million statewide $20 million statewide $ 1 million max per grant $ 1 million max per grant 50 % match (??) 50 % match (??) New Plan elements New Plan elements Land use Land use Climate Change Climate Change Must commit to update plan if you get Implementation funds Must commit to update plan if you get Implementation funds

F u n d I n g Areas

Approved Regions 46 total 46 total 3 cover entire funding area 3 cover entire funding area North Coast $37 m North Coast $37 m Bay Area $138 m Bay Area $138 m SAWPA $114 m SAWPA $114 m Other 8 funding regions average 5+ approvals Other 8 funding regions average 5+ approvals

Implementation- P roposal Solicitation Package– March $ 100 Million Total for state-Round 1 $ 100 Million Total for state-Round 1 Funding targets -$ 20 m for Conservation Projects to meet 2020 target of 20% reduction -$10 m for DAC projects Bay Area- 1/9 of Total allocation ($138 m) Bay Area- 1/9 of Total allocation ($138 m) $ 15.3 m to $30.6 m(??) $ 15.3 m to $30.6 m(??) 25% match 25% match Projects must be consistent with adopted IRWM Plan Projects must be consistent with adopted IRWM Plan

Scoring 8450 Workplan1515 Funding match /////// 5 (10%) Scientific Merit ////////15 F. A Balance? (5)//// Budget55 Schedule55 Mon. & Assess. 55 Econ. Analysis-Benefits 2015 W S & Other benefits 510 Program Preferences 105 Total 60 (?)-70 80

Economic (Benefits) Analysis Water supply benefits Water supply benefits Water Quality and Other benefits Water Quality and Other benefits Flood damage reduction benefits Flood damage reduction benefits -Under Other for prop 50

Program Preferences Prop 50 Include integrated projects with multiple benefits; Include integrated projects with multiple benefits; Support and improve local and regional water supply reliability; Support and improve local and regional water supply reliability; Contribute expeditiously and measurably to the long- term attainment and maintenance of water quality Contribute expeditiously and measurably to the long- term attainment and maintenance of water qualitystandards; Eliminate or significantly reduce pollution in impaired waters and sensitive habitat areas, including ASBSs; or Eliminate or significantly reduce pollution in impaired waters and sensitive habitat areas, including ASBSs; or Include safe drinking water and water quality projects that serve disadvantaged communities. Include safe drinking water and water quality projects that serve disadvantaged communities.

Program Preferences-Prop Include regional projects or programs (CWC §10544) Include regional projects or programs (CWC §10544) Effectively integrate water management programs and projects within a hydrologic region identified in the California Water Plan; the Regional Water Quality Control Board (RWQCB) region or subdivision; or other region or sub-region specifically identified by DWR (50) Effectively integrate water management programs and projects within a hydrologic region identified in the California Water Plan; the Regional Water Quality Control Board (RWQCB) region or subdivision; or other region or sub-region specifically identified by DWR (50) Effectively resolve significant water-related conflicts within or between regions Effectively resolve significant water-related conflicts within or between regions Contribute to attainment of one or more of the objectives of the CALFED Bay-Delta Program Contribute to attainment of one or more of the objectives of the CALFED Bay-Delta Program Address critical water supply or water quality needs of disadvantaged communities within the region (50) Address critical water supply or water quality needs of disadvantaged communities within the region (50) Effectively integrate water management with land use planning Effectively integrate water management with land use planning For eligible SWFM funding, projects which: a) are not receiving state funding for flood control or flood prevention projects pursuant to PRC § or §75034 or b) provide multiple benefits, including, but not limited to, water quality improvements, ecosystem benefits, reduction of instream erosion and sedimentation, and groundwater recharge. For eligible SWFM funding, projects which: a) are not receiving state funding for flood control or flood prevention projects pursuant to PRC § or §75034 or b) provide multiple benefits, including, but not limited to, water quality improvements, ecosystem benefits, reduction of instream erosion and sedimentation, and groundwater recharge. Address statewide priorities Address statewide priorities

Regional Projects or Programs Identified In an IRWM Plan that accomplish any of the following: (a) Reduce water demand through agricultural and urban water use efficiency. (b) Increase water supplies for any beneficial use through the use of any of the following, or other, means: (1) Groundwater storage and conjunctive water management. (1) Groundwater storage and conjunctive water management. (2) Desalination. (2) Desalination. (3) Precipitation enhancement. (3) Precipitation enhancement. (4) Water recycling. (4) Water recycling. (5) Regional and local surface storage. (5) Regional and local surface storage. (6) Water-use efficiency. (6) Water-use efficiency. (7) Stormwater management. (7) Stormwater management. (c) Improve operational efficiency and water supply reliability, including conveyance facilities, system reoperation, and water transfers. (d) Improve water quality, including drinking water treatment and distribution, groundwater and aquifer remediation, matching water quality to water use, wastewater treatment, water pollution prevention, and management of urban and agricultural runoff. (e) Improve resource stewardship, including agricultural lands stewardship, ecosystem restoration, flood plain management, recharge area protection, urban land use management, groundwater management, water-dependent recreation, fishery restoration, including fish passage improvement, and watershed management. (f) Improve flood management through structural and nonstructural means, or by any other means.

Statewide Priorities Drought Preparedness Drought Preparedness Use and Reuse water more efficiently Use and Reuse water more efficiently Climate Change Response Actions Climate Change Response Actions Expand Environmental Stewardship Expand Environmental Stewardship Practice Integrated Flood Management Practice Integrated Flood Management Protect Surface and Ground water Quality Protect Surface and Ground water Quality Improve Tribal Water and Natural Resources Improve Tribal Water and Natural Resources Ensure Equitable Distribution of Benefits Ensure Equitable Distribution of Benefits DAC or tribes DAC or tribes

Bay Area Process Prop 84 Prop 84 - Emphasize “Regional” projects - Update 2009 list -Through Functional areas -Through Functional areas - Through Sub-regions

2009 “Regional” List Existing -in Plan 11-Landscape Irrigation Calculator (2009 update) 11-Landscape Irrigation Calculator (2009 update)2009-$250k- 11-Drought Relief and Water Conservation Innovation Project ( 2009 update) 11-Drought Relief and Water Conservation Innovation Project ( 2009 update) 2009-$11 million 26-Developing/Implementing Options for Mitigating Public Health Impacts of Eating Fish (2010 update) 26-Developing/Implementing Options for Mitigating Public Health Impacts of Eating Fish (2010 update) Prop 50-$300k

2009 Regional Projects -New Projects Added to the IRWM Plan-Appendix G 128 FP-SM Regional Green Infrastructure Capacity Building Project (SFEP/ABAG) $7.5 m 128 FP-SM Regional Green Infrastructure Capacity Building Project (SFEP/ABAG) $7.5 m 129 WW-RW Regional Water Recycling Outreach Project (SCVWD) -$225k 129 WW-RW Regional Water Recycling Outreach Project (SCVWD) -$225k 130 WM-HP&R Disadvantaged Communities Watershed Program (SFEP/ABAG) $ m 130 WM-HP&R Disadvantaged Communities Watershed Program (SFEP/ABAG) $ m 131 WM-HP&R Evaluating Regional Ecosystem Restoration Using Steelhead Trout (CEMAR) 131 WM-HP&R Evaluating Regional Ecosystem Restoration Using Steelhead Trout (CEMAR) $562.5 k 132 FP-SM Flood and Waterways Infrastructure Analysis and Communication Tool (SFEI) -$750k 132 FP-SM Flood and Waterways Infrastructure Analysis and Communication Tool (SFEI) -$750k

Regional? Green Infrastructure Green Infrastructure Sonoma write-up submitted Marin? Napa? Solano? New NBWRA- submitted write-up for Phase 1 NBWRA- submitted write-up for Phase 1 Project -$100 million total 25 % federal share

Federal Funding Federal Funding Recent Recent NBWA -EPA Water Quality Improvement Fund NBWA -EPA Water Quality Improvement Fund NBWA- $1.5 million-TMDL Implementation NBWRA- ARRA funds NBWRA- ARRA funds Proposed Legislation-HR 5061 Proposed Legislation-HR 5061 ?? $100 million/ year Plan CCMP Plan CCMP Updated 2007