BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Operator Qualification Program Basics. Operator Qualification This presentation on Colonial Pipeline’s Operator Qualification program is accompanied by.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
EvalS Application User Guide version September 17, 2011.
Job Loss Analysis Overview
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
PHMSA Perspectives Construction Process & Standards
Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—
EQUIPMENT VALIDATION.
Pipeline Personnel Qualification
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Contractor Safety Management
ASME B31Q U PDATE Michael Gruenberg WRGC August 2013.
LOCKOUT/TAGOUT.
Inspection and Testing of Fire Alarm Systems (ITFAS)
FPSC Safety, LLC ISO AUDIT.
ISO 9000 Certification ISO 9001 and ISO
Network security policy: best practices
4. Quality Management System (QMS)
BUILD WITH US. ™ Contractors
Managing Project Procurement
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Fundamentals of ISO.
Center for Offshore Safety
PMP® Exam Preparation Course
Authorization and Inspection of Cyclotron Facilities Inspections.
FDA Regulatory review in Minutes: What Product Development Executives Need-to-Know. Specifically, frequent causes of recalls and related areas that investigators.
Houston Business Roundtable Field Audit Form Review
CWP Gas Job Funnel. CWP Funnel  CWP recently completed a gas funnel program for entry level laborer positions  Candidates were prescreened prior to.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
CIS Case History NACE Eastern Area Conference
“Incident Free Starts With ME”
Setting up an Internal Audit Program By
ISO 9001: 2000 Certified Audit Process What to do.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
Lockout/tagout (LOTO) is a technique used to prevent energy from being released during the servicing of equipment. This is accomplished by placing locks.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Division of Risk Management State of Florida Loss Prevention Program.
Hunter Douglas Corporate Safety Conference
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Team Ramrod. Identify and Define The Problem Identify The Problem Low enrollment in the ICT programs. There seems to be a lack of interest in ICT related.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
DALLAS CALGARY SYDNEY LONDON LOS ANGELES NEW YORK TORONTO ISN ISN Midstream TQ [Date]
Cost effective while providing customer focused solutions.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Operator Qualification
“Success in Safety”.
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Hot Work Loss Prevention Program
Fundamentals of ISO.
Setting up an Internal Audit Program
Leo Associates Services
AGA – OQ & Training Best Practices Roundtable
Safety is part of our culture at Halliburton
What is the UL QFCP? FCIA Webinar Presenters:
Roadmap to COR.
Monitoring Cathodic Protection Effectiveness and Record keeping
Organisational NRW Management
Final Design Authorization
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Presentation transcript:

BP, OQ & You

2 Why do we have OQ? Walnut Creek

3 Bellingham Washington

4 ISNetworld BP Contractor Statistics 235,712 - OQ Reports 15,623,253 - Total Contractor OQ Qualifications for BP 25% of all the records in ISN 1987 Jobs Archived in ISN

5 Our expectations for OQ covered task work… Sign up with ISNetworld Determine which BP approved vendor will be used to qualify your employees. Currently BP accepts: −OQSG −NCCER −NACE −TDW & Clockspring

6 Expectations continued… Qualify the employees who will be performing OQ covered tasks BP will be requiring both a written and practical evaluation after January 1, 2008 Ensure all qualification results are sent to your vendor in a timely manner for upload into ISNetworld Once the job site has been created in ISNetworld contractor should receive an notification to generate an OQ Report (s) Review your employee qualifications against the qualifications assigned to the job ensuring there are no GAPS

7 It is the contractors responsibility to ensure that all of their assigned OQ covered tasks are performed or directed and observed by an OQ qualified employee. If insufficient qualified employees are sent to the jobsite the job could be suspended until qualified employees are provided If an employee is replaced on the jobsite due to illness, vacation, etc., the new employee must bring their most current OQ report, and give it to the BP project inspector Expectations continued…

Using the Gap Matrix Tool An essential front end loading tool

9 Gap Matrix functions…. BP uses this for project planning/front end loading Ensure qualified employees have been assigned to the job Look at one or all contractors −Single employee −multiple employees View all tasks assigned to the job or specific tasks assigned to a specialty contractor (i.e. NDT, excavation, etc.) Contractors now have the ability to run a Gap Matrix

10 Job Site Gap Matrix Tool Corrosion Prepare surface for coating by abrasive blasting

BP’s OQ path forward What is changing…..

12 DOT Audit Shares  DOT auditors are becoming more OQ savvy  Field audit findings…. Focus is centered abnormal operating conditions (AOCs) −Auditors will be asking BP employees −Auditors will be asking contract employee Checking qualifications at job sites Checking to see if work is being performed correctly

13 Recent changes that affect contractors… BP now accepts OQSG, NACE & NCCER as OQ providers for our contractors January 1, 2008 written tests and performance verifications will be required for every task ISNetworld working to distinguish between initial qualifications and requalifications −Initials will always require both a written and practical evaluation −Most requalifications will only require a written OR practical evaluation Span-of-control is now task specific Contractors can now run their own GAP Matrix

14 BP’s contractor covered task list Task No.NCCER Above Ground Covered Task Name Span of Control Acceptable Qualification Methods Conduct Annual Surveys or Electrically Inspect Unprotected Bare Pipe 1.1 Measure structure-to-soil potentials 1:1OQSG, NCCER or NACE 1.2Conduct close interval surveys 1:1OQSG, NCCER or NACE 1.3Test to detect interference 1:1OQSG, NCCER or NACE 1.4 Inspect and perform electrical test of bonds 1:1OQSG, NCCER or NACE 1.5Inspect and test isolation devices 1:1OQSG, NCCER or NACE Maintain Test Leads 2.1Inspect and verify test lead continuity 1:1OQSG, NCCER or NACE 2.2Repair damaged test leads 1:1OQSG, NCCER or NACE 2.3Install test leads by non-exothermic welding methods 1:1OQSG, NCCER or NACE 2.4Install test leads by exothermic welding methods 1:1OQSG, NCCER or NACE Inspect Rectifier 3.1Obtain a voltage and current output reading from a rectifier 1:1OQSG, NCCER or NACE 3.2Check for proper operation of a rectifier 1:1OQSG, NCCER or NACE Maintain Rectifier 4.1Troubleshoot rectifier bond connections 1:1OQSG, NCCER or NACE 4.2Repair or replace defective rectifier components 1:1OQSG, NCCER or NACE 4.3Adjustment of rectifier 1:1OQSG,NCCER or NACE

15 API-OQ Committee update… Currently working on TPCP Standard Small step toward portability −If OQ providers meets criteria?? −API-OQ Liquids operators will accept their programs −Allows contractors to use 1 provider for multiple operators Revising covered task list and elements within the tasks Revising the API 1161 Standard on Operator Qualification

16 Wrap-up In order to make the jobs easier please work with BP project managers, construction supervisors & inspectors to meet the intent of the OQ rule Follow the required procedures around OQ Assign only the employees who will be working on the job to the jobsite in ISN −Continue to work safely −Continue to do the excellent job you have done for us in the past If you are having issues with a job site in ISN, call the construction supervisor, project manager or team leader who hired you Visit the BP OQ Website for contractors

17 Operator Qualification Welcome to the BP US Pipelines & Logistics Operator Qualification (OQ) page for contractors. Here you will find everything you need to know about our OQ Program. BP has been involved and is committed to the ASME B31Q Standard. Through 2008, BP will be adjusting our program to align with this standard. BP uses ISNetworld to track covered tasks performed by contractors on our Jobsites. At BP we are dedicated to developing and applying innovation through education and empowerment. Everything we do relies on people; no oil rig, pipeline or terminal produces ideas or drives results. Helpful Links & Documents BP's Covered Task List OQ Communications “Letters to Contractors": OQ Plan Excerpts Span of Control Changes OQ Project/Field Audit Form Acceptance of all OQSG Covered Tasks Frequently Asked (OQ) Questions BP Approved OQ Providers & Solutions OQ Contact Information Bill Bannister - OQ Coordinator, PLBU Molly Louviere - Contractor Mgmt Specialist BP’s External OQ Page

Any Questions…???