Underground Mine Mapping Itasca County, Minnesota Peter Clevenstine, P.E. Manager of Engineering & Mineral Development.

Slides:



Advertisements
Similar presentations
The future of navigation in Cambodia Provided by Smarter Solutions © 2010 Smarter Solutions Co., Ltd. All rights reserved. All information contained herein.
Advertisements

The National Diabetes Management Strategy: Diabetes Facts and Figures By using these slides, you agree to the terms on the next slide. The development.
IIT Office of General Counsel Education Program Non-Disclosure/Confidentiality Agreements.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
Pension Fund Trustees Liability Ncedi Mbongwe. Introduction to Camargue Underwriting Managers Established in 2001 Underwriters: Mutual and Federal and.
1 Copyright © 2012 Mahindra & Mahindra Ltd. All rights reserved. 1 Change Management – Process and Roles.
A Genetically Modified Solution?
QBE European Operations The QBE Foundation: Giving something back.
Statewide Water Needs and future estimated costs September 20, 2011.
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2010 Standard.
Unit 6 Review Flashcards Unit 6 Review Flashcards ALA: Pre-Algebra Unit 6 Integers.
Changing Databases This presentation gives a quick overview on how to change databases in Osprey.
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
MacLean Finance Pty Ltd Australia CONFIDENTIALITY DISCLAIMER: The Presenter is not a United States Securities Dealer or Broker, or U.S. Investment Adviser.
Legal Disclaimers Accuracy Every effort is made to provide information that is accurate. However any information contained in this website or the “article.
MCCWDTA OER Repository Implementation Barbara Treacy, Education Development Center August 20, 2014 This work is licensed under a Creative Commons 3.0 License.
References to ‘Control’ can either refer to superiors in a control room or any decision making authority.
2009 Coal Seam Gas Safety Forum Paul Zealand, Executive General Manager Upstream Oil & Gas Friday 14 August 2009.
Ideally only staff that have been media trained should manage media releases. If you’re not media trained limit your focus on the facts.
For Oracle employees and authorized partners only. Do not distribute to third parties. © 2008 Oracle Corporation – Proprietary and Confidential.
1 of 26 For Oracle employees and authorized partners only. Do not distribute to third parties. © 2009 Oracle Corporation – Proprietary and Confidential.
Pumps. DIAPHRAGM PUMPS DIAPHRAGM PUMP DIAGRAM(cont’d)
Unit 7 Review Flashcards Unit 7 Review Flashcards ALA: Pre-Algebra Unit 7 Algebra.
Elevator Pitch – one liner
-1- For Oracle employees and authorized partners only. Do not distribute to third parties. © 2009 Oracle Corporation – Proprietary and Confidential Oracle.
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2011 Standard.
The secure site rendering issue (all navigation crushed together as a list at the top of the page) is a compatibility issue with Internet Explorer only.
Spring 2016 ICC Meeting – Subcommittee F Estimating the Value / Benefit of Diagnostics 1 of 3 – Perhaps? Josh Perkel and Nigel Hampton NEETRAC.
-1- For Oracle employees and authorized partners only. Do not distribute to third parties. © 2009 Oracle Corporation – Proprietary and Confidential Oracle.
Connectivity to bank and sample account structure
RaboDirect Financial Health Barometer 2016
Minnesota Crash Mapping Analysis Tool and Crash Data
SIMPLE SWOT MATRIX TEMPLATE
S W T O SWOT ANALYSIS TEMPLATE STRENGTHS (+) WEAKNESSES (–) • •
AGILE PRODUCT ROADMAP AGILE PRODUCT ROADMAP
South Florida Water Depth Assessment Tool (SFWDAT)
Self-Registration walk-through
IT STRATEGY ROADMAP TEMPLATE
MULTIPLE PRODUCT ROADMAP
S W T O SWOT ANALYSIS TEMPLATE STRENGTHS (+) WEAKNESSES (–) • •
DISCLAIMER and COPYRIGHT RESERVATION
S W T O SWOT ANALYSIS TEMPLATE STRENGTHS (+) WEAKNESSES (–) • •
S W T O SWOT ANALYSIS TEMPLATE STRENGTHS (+) WEAKNESSES (–) • •
Export snapshot October , 2018
IT STRATEGY ROADMAP TEMPLATE
日本株 リアルタイム株価の申込方法.
TEXT TEXT TEXT TEXT BUSINESS OBJECTIVES.
ANNUAL BUSINESS REVIEW
QUARTERLY BUSINESS REVIEW
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
TASK LIST YOUR LOGO PROJECT: [ TITLE ] COMPLETED BY: [ NAME ]
TITLE Source: Footnotes:. TITLE Source: Footnotes:
© 2013 Sri U-Thong Limited. All rights reserved
BUSINESS CONTINUITY FRAMEWORK BUSINESS IMPACT ANALYSIS
BUSINESS CONTINUITY PROCEDURE
M&A INTEGRATION SCORECARD
YOUR COMPANY NAME Tag Line YOUR LOGO 00/00/0000 PRESS KIT.
BLOG NAME Mission Statement / Tag Line YOUR LOGO 00/00/0000 PRESS KIT.
LAW FIRM DISASTER RECOVERY PLAN
PAYROLL DISASTER RECOVERY PLAN
SCHOOL DISASTER MANAGEMENT PLAN
PROJECT NAME YOUR LOGO PROJECT CODE: PROJECT MANAGER: DATE OF REPORT:
DISASTER CALL TREE YOUR LOGO COMPANY NAME Street Address
DATA DISASTER RECOVERY PLAN
SaaS DISASTER RECOVERY PLAN
APPLICATION DISASTER RECOVERY RESPONSE
PROJECT NAME YOUR LOGO [ NAME ] [ DATE ] BUSINESS CASE PRESENTATION
IT DISASTER RECOVERY PLAN
Presentation transcript:

Underground Mine Mapping Itasca County, Minnesota Peter Clevenstine, P.E. Manager of Engineering & Mineral Development

Disclaimer The Minnesota Department of Natural Resources makes no representation or warranties, express or implied, with respect to the reuse of data provided herewith, regardless of its format or the means of its transmission. There is no guarantee or representation to the user as to the accuracy, currency, suitability, or reliability of this data for any purpose. The user accepts the data 'as is', and assumes all risks associated with its use. By accepting this data, the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user shall include with the data a copy of this disclaimer. The Minnesota Department of Natural Resources assumes no responsibility for actual or consequential damage incurred as a result of any user's reliance on this data.

Three Phases

Phase 3 Work Tasks Research the study area Research the study area Collect and organize maps of known underground mine workings. Collect and organize maps of known underground mine workings. Scan plan maps and sections Scan plan maps and sections Develop GIS coverages Develop GIS coverages Link the scanned images to specific mine parcels. Link the scanned images to specific mine parcels. Identify other potential areas Identify other potential areas

Phase 3 Budget CategoryDescriptionCost DNR StaffGeologist, Mining Engineer, Information Technologist $183,000 Contract workerGeological Scientist from NRRI105,000 OtherEquipment, supplies and travel 2,000 Total$290,000

Phase Funding Funding SourcePhase 1Phase 2Phase 3 State Bonding CIRSSD) $304,000 IRR Innovation Grant$150,000 DNR60,000125,000 Private60,00030,000 State MN/DOT25,000 County 0 5,000 Unfunded $105,000 Total$304,000$300,000$290,000

I’m asking for your endorsement?

mndnr.gov