1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.

Slides:



Advertisements
Similar presentations
Rate of Return Multiple Alternatives Lecture slides to accompany
Advertisements

Incremental Analysis Lecture No. 21 Professor C. S. Park
Chapter 7 Rate of Return Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Evaluating Business and Engineering Assets Payback Period.
Capital Budgeting Net Present Value Rule Payback Period Rule
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Chapter 10 - Capital Budgeting
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. NPV, Internal Rate of Return (IRR), and the Profitability Index.
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
COMPARING ALTERNATIVES
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
Rate of Return. Definition The Rate of Return (ROR) is: A percentage (or interest rate) that describes the merit of an investment. (Return on investment.
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Lecture 4 Rates of Return. Summary of comparison methods we know so far: Present worth Future worth Annual worth Still to come: Rate of return Cost/benefit.
Internal Rate of Return (IRR). Is the rate of interest at which –The present value of expected cash inflows from a project Equals –The present value of.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Capital Budgeting Decide how to invest money so that its value is maximized.
COMPARING ALTERNATIVES
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Rate of Return One Project Lecture slides to accompany
FINAL EXAM REVIEW Spring Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present.
Comparing Alternatives with Rate of Return
FINAL EXAM REVIEW Fall Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present Worth.
Chapter 7 Rate of Return Analysis
1 Reviewing… Net Present Worth: Used to select among alternative projects. Used to compare mutually exclusive alternatives. If all expenses and revenues.
IEN255 Chapter 6 - Rate of Return Analysis
Rate of Return Analysis: Multiple Alternatives Consider the following: You have $20,000 to invest in either alternative A or alternative B. Your MARR is.
Chapter 5 Rate of Return Analysis: Single Alternative 5-1.
Comparing Projects Using Time Value of Money
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8.
Net Present Worth Review NPW can compare mutually exclusive projects or prioritize investments (using Incremental Analysis) Criteria: Choose highest NPW.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
EGR Rate of Return Analysis Rate of Return (ROR) is the rate paid on the unpaid balance of borrowed money, or the rate earned on the unrecovered.
Evaluating a Single Project
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
Capital Budgeting Decide how to invest money so that its value is maximized.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
12/17/2015rd1 Engineering Economic Analysis Chapter 15  Selection of a MARR.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next.
2/22/2016rd Multiple Rates of Return nCash FlowCumulativeAdjusted 10% 20% 0-$500-$500 -$500 -$ (quadratic
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
12-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 12 Independent Projects with Budget Limitation ©
Engineering Economics Exam 2 Review. CASH FLOW DIAGRAM Yes -- you do need the Sticks!!
Comparing Economic Alternatives Using time value of money to choose between two or more options.
8-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 8 Rate of Return Multiple Alternatives © 2012 by.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Incremental Analysis Based on concept that any avoidable investment that does not yield at least the MARR should not be made Involves determining the ROR.
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Engineering Economy [8] Rate of Return Analysis Multiple Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Rate of Return Analysis: Multiple Alternatives
Contemporary Engineering Economics
RATE OF RETURN ANALYSIS CHAPTER 7
Chapter 6: Comparison and Selection Among Alternatives
Steps of the Incr. Analysis Process
Chapter 6: Comparison and Selection Among Alternatives
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial equation. If there is more than one sign change in the net annual cash flows over the life of the project, then there is more than one internal rate of return (root)! We may find the IRR by either the manual method we used for the bond yield, or we may use the computer to find the roots by either plots or numerical methods

2 IRR Example Project A costs $10,000 and will last for 10 years. Annual, end of year revenues will be $3000, and expenses will be $1000. There is no salvage value. Project B costs $20,000 and will also last for 10 years. Annual revenues will be $4000 with annual expenses of $1500. Salvage value is $14,500. What is each project’s IRR?

3 Numerical Method Example: IENG 302 IRR.xls Table Example i*(P/A, i*, 10)(P/F, i*, 10) 6% % % % %

4

5 Decisions with IRR When applied to project selection among independent projects – i.e. there are enough funds such that any or all of the projects may be selected – then investing based on IRR is easy: Select all projects with IRR > MARR! Note: Make sure that there is only one IRR (root)!

6 Decisions with IRR When applied to project selection among mutually exclusive projects – i.e. there is not enough money to do them all – IRR can produce the same result as NPW and EAW. However, incremental analysis MUST be used! REASON: IRR is a relative measure of project merit

7 Why Must Incremental Analysis be Used for Competing Projects? Assume that an MARR of 16% per year is required, and $ is available to invest: Project A requires $ upfront to obtain an IRR of 35% per year. Project B requires an $ first cost and returns an IRR of 29% per year. What could we do with the un-invested money from Project A? ($35 000)

8 Why Must Incremental Analysis be Used for Competing Projects? It would be reasonable to invest the remaining $ at the MARR: Overall IRR A = (.35) (.16) = 27.2% per year Project B returns an IRR of 29% per year on ALL the money available to invest.

9 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure should be made. Note: If using NPW or IRR, lifetimes must be equal – so use Least Common Multiple or Study Period!

10 Incremental Analysis Incremental Analysis can used by putting the options in the order of increasing initial investment. Check the feasibility of the first investment. If it is feasible, then you consider the increment to the next level of investment. If it is not feasible, then you check the second investment alternative for feasibility, and so on until all options are considered.

11 Incremental Analysis Incremental Analysis can also be used when you’re already incurring an expense (e.g., DSL internet service) and you are trying to determine if it is a good decision to spend additional funds (e.g., satellite or cable?).

12 Steps of the Process 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next Alternative ( j = j+ 1) 4. Determine cash flows for “current best” and Alternative j. 5. Determine incremental cash flows between “current best” and Alternative j. 6. Calculate PW, AW, FW, IRR (or Benefit/Cost) of only the incremental cash flows.

13 Steps of the Process 7. If incremental investment yields NPW, EAW, or a NFW > 0*, then the new “current best” becomes Alternative j. * (B/C ratio > 1, or IRR > MARR) 8.If there are remaining alternatives, go to Step If all alternatives have been considered, select the “current best” alternative as the preferred alternative.

14 i = 18%Net Cash Flows for Alternatives A 0 - A 3 End of Year, t A 0 A 1 A 2 A 3 0$0 -$50,000-$75, ,50020, ,50020,00025, ,50020,00030, ,50020,00035, ,50020,00040,000

15 IRR Incremental Analysis Rank projects from lowest to highest initial cost Eliminate any projects with IRR < MARR Starting from the least expensive project to the next most expensive, justify each incremental investment IRR HC-LC < MARRAccept LC Project & Reject HC Project IRR HC-LC = MARRIndifferent IRR HC-LC > MARRReject LC Project & Accept HC Project