Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Module 2: Project appraisal M2. M2. Project appraisal Time lines -10:45 -12:30: Content: Elements of the project appraisal (SSN) –Blunt tools blunt data.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Base Line Methods Developing Forestry and Bioenergy Projects with CDM Quito, Ecuador March, 2004.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Katoomba Group Training Initiative Climate Change, Markets and Services Welcome and Introduction Course Introduction and Guidelines Participant Introduction:
GHG PROTOCOL INITIATIVE Emerging Project Accounting Standards & Guidance Mahua Acharya, WBCSD World Resources Institute.
Baselines and Additionality Training Seminar for BioCarbon Fund Projects July 11-13, Washington DC. Lasse Ringius. World Bank Carbon Finance Business.
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Creating the Carbon Asset: PCF Approaches to Additionality, Baselines, Validation and Verification.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
Presentation “Green Investment Schemes – greenhouse gas emissions quotas trading mechanisms in Ukraine according to the Kyoto Protocol to the Convention.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Canada’s CDM & JI Office Project Facilitation Support Through Canada’s CDM and JI Office.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Creating the Carbon Asset: PCF Workshop on JI & CDM Methodologies COP-8, New Delhi, 22 October 2002 – Johannes Heister, PCF.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Preparation and review of the Project 1. Project ideas reviewed by PCF 2. PCN prepared by project sponsor 3. Host country endorsement sought 4. Further.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Possibilities for promoting environmental protection projects
Presentation transcript:

Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002

Preparation and Review of the Project Preparation of project documents (PDD, BLS, MP, ERS) Validation Process Negotiation of Project Agreements Periodic Verification and Certification Construction and Start- Up Project Completion PCF Project Cycle

Part I What is a Baseline?

A Baseline… …represents the most likely course of action and development in the absence of the project …is a counterfactual future development that provides the same services as the proposed project ….can never be directly observed …is the benchmark against which project CO 2e emissions are compared to estimate reductions achieved

It is not necessarily continuation of the status quo CO2 Emissions CDM project CO2 emissions (observable) Additional CO 2 emissions reduction Years Baseline scenario CO2 emissions (that would occur)

Kyoto Protocol Requirements Emission Reductions (ERs) must: Create real, measurable, and long-term benefits related to the mitigation of climate change. (Art. 12.5b) Be additional to any that would occur in the absence of the certified project activity. (Art. 12.5c)

Why is additionality important? Country A Country B Joint Implementation Emissions Trading CDM Hot Air?

Baseline and additionality: two related concepts If the project equals the baseline scenario, the project is not additional. also: The project is additional if it reduces the amount of emissions vis-a-vis the baseline scenario.

Part II Key Project Documents Required by the PCF

Key Documents and their Objectives Project Design Document (PDD) Project Activity Summary and Annexes: Baseline Study (BLS) What is the most likely future scenario? Why will the project not be implemented without carbon finance, or without the participation of the PCF? (additionality) Monitoring Plan (MP) How will the emission reductions be measured? What will be measured during the course of the project? Emission Reductions Study (ERS) How may emission reductions are expected during the crediting period?

Baseline Study

How to figure out what baseline emissions are? Beliefs about what would happen are a starting point  Possible baseline scenarios but beliefs are not sufficient: a methodological approach is needed, which can be tested  Various baseline methods _____________________________________  Determine the relevant baseline scenario

How to structure baseline studies? Information about:  project  data  project context  Kyto Protocol  etc. Possible baseline methodologies Selection of baseline methodology Possible baseline scenarios Selection of baseline scenario Criteria for baseline method selection, In future: EB list of approved methodologies

An Example Proposed Project: methane recovery at a landfill Possible Scenarios –BAU: no methane recovery –Installation of 10 landfill gas wells as safety curtain –Project: Installation of 100 landfill gas wells Possible Baseline Methodologies –Financial Analysis / inversión –Scenario Analysis Selection of relevant baseline scenario

What is a baseline methodology? A baseline methodology is an application of one of the approaches outlined in para 48, Marrakesh Accords. (48a) “existing actual or historical emissions” (48b) “economically attractive course of action” and “taking into account barriers to investment” (48c) “average emissions of similar activities, in previous 5 years, similar circumstance, top 20% performance” Project proponents have to justify their approach…

Which baseline methods has the PCF applied to date? Project-by-project methods –Investment / financial analysis  Latvia, Chile, Colombia, Costa Rica –Scenario analysis  Nicaragua, Uganda –Control groups  Latvia –Expert opinion  Uganda Standard-oriented methods (small projects) –Technology penetration threshold  El Salvador –Technology standard  Mauritius

Investment analysis is a rigorous approach... Behavioral assumption: –Rational investor maximizes return on investment under given constraints: financial analysis –Public decision maker maximizes public benefit under given constraints: economic / cost-benefit analysis Baseline definition: –The baseline is the (time dependent) investment alternative (scenario) with the highest IRR or the highest NPV or the lowest costs (all risk adjusted). –not considering GHG emissions or the value of ERs.

… and an established methodology … Distinguish between private and public sector projects. Create a menu of investment alternatives (scenarios) –that deal with the problem on hand / satisfy an identified demand (service equivalence). –include only plausible scenarios (constraints) –include zero investment scenario (BAU) and proposed project –Include alternative investment start times Determine investment constraints and parameters (regulatory policy, costs, risks, etc. – but not ERs).

How has the PCF applied investment / financial analysis? Example: Latvia – solid waste management Treated as a private sector investment Plausible investment scenarios were described and analyzed by Task Manager in a feasibility study Financial IRRs were provided Ranking of alternatives with and without carbon value Baseline: highest IRR without carbon value Project: highest IRR with carbon value

Baseline PCF project

Other Baseline Methodologies Scenario Analysis Attempt to understand and describe all aspects and circumstances that contribute to an investment decision, in particular risks and other barriers Provide data and/or expert opinions and references that can be confirmed by a validator. Control Groups The selected control group is the baseline: Describe the baseline! Must be similar in all aspects but for the CDM project

Sections of the BLS Project description and characteristics Sector background etc. Boundaries Selection of baseline method Possible alternative scenarios (to include BAU & project) Legal and other constraints Selection of plausible alternative scenarios Application of selected baseline method and determination of the most likely baseline scenario Discussion of time dimension of baseline and crediting period Leakage (and Permanence for sequestration projects) Greenhouse gases covered Environmental and social impacts => Complete description of determined baseline scenario and its development over time

Monitoring Plan

The Monitoring Plan… …describes how to measure the emission reductions resulting from the project …defines the monitoring obligations of the project operator...becomes operational after project start …serves as the basis for the verification of emission reductions...is a legally binding document

The MP also contains spreadsheets to calculate the ERs Sub-Project Name: Date: HoursDay UnitEquation1…24Sum (hours) Carbon Intensity Factor t CO2 / MWh A -- Reported Power Supply MWhB Emission Reductions t CO2C = (A * B)

Emission Reduction Study

The Emission Reduction Study… …Uses MP calculation tool (spreadsheet) to calculate baseline emissions, project emissions and ERs. … projects expected baseline and project emissions and ERs for each crediting year …provides structured risk information by simulating ER calculation (sensitivity analysis) …provides the basis for informed negotiations

Baseline Exercise

Annex I: Kyoto Protocol and Marrakech Accord on baselines and monitoring

COP-7 – defined baseline for CDM (44) The baseline is the scenario that: –“reasonably represents GHG emissions that would occur in the absence of the proposed project activity”, –“covers emissions from all gases, sectors, sources in Annex A within project boundary”, –is derived using an approved baseline method.

How to develop CDM baselines? (45) A baseline shall be established … (a)using approved and new methodologies, (b)in a transparent and conservative manner, (c) on a project-specific basis, (d) using simplified procedures for small-scale projects, (e) taking account of national and/or sectoral policies. (48) Select baseline method … –that is deemed most appropriate, –that is consistent with guidance from Executive Board, –… and justify the choice.

COP-7 on CDM baseline approaches (48a) “existing actual or historical emissions”  defines BAU as baseline scenario and  a historic control group as monitoring concept (48b) “economically attractive course of action” and “taking into account barriers to investment”  defines an economic baseline method, such as investment analysis (IRR, least cost etc.) (48c) “average emissions of similar activities, in previous 5 years, similar circumstance, top 20% performance”  defines build margin as baseline scenario and  a standard control group as monitoring concept

What is the CDM crediting period? Either: (a) Either a maximum of ten years with no option of renewal. Or: (b) Three seven-year renewal periods (total of 21 years). Condition for renewal: Original project baseline is still valid or has been updated taking account of new data.

COP-7 on Monitoring The monitoring plan must provide for the collection of all data necessary for (a)estimating or measuring project emissions (b)determining the baseline of emissions The monitoring plan must describe the formulae used to (a)calculate and to estimate project emissions (b)calculate and to project baseline emissions

The relevant COP7 texts and information on the sessions and decisions of the CDM Executive Board are available at

Annex II: PCF approach towards projects at an advanced stage of preparation

Criteria for project eligibility A project will not be eligible for consideration for PCF Financing unless the project sponsor is able to show that it has taken into account the opportunities presented by JI/CDM in the structuring of its financing and is aware of the requirements of these mechanisms including environmental additionality. The project sponsor may demonstrate this by providing evidence of, among other things : 1. Contacts and substantive discussions with potential buyers of ERs prior to the conclusion of the financial package; OR 2. Exploration of the environment additionality of the project, e.g. by the initiation of a baseline assessment.