Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,

Slides:



Advertisements
Similar presentations
Energiekamer Tariffs in the Virtual Test GRI NW Investment Ariane Kruijtzer Dutch Office of Energy Regulation.
Advertisements

Classification: Internal Status: Draft Statoils view on the ERGEG GRI Secondary Capacity work Helga Franse – EU & Regulatory Affairs Stockholm – 26 November.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
The big picture in the EU Managing conflicting objectives in tariff design Tom Maes, Vice-Chair CEER Gas Working Group Understanding the impact of regulatory.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
1 Brussels workshop: 26 and 27 February 2009 Conclusions and minutes Workshop 26 – 27 February 2009 GRI NW Investment I1- Virtual Test/Business Simulation.
Towards Regional Independent Operators – a main driver for successful market integration.
1 Cross-border Investment TRIGGERS GRI NW Investment I1- Virtual Test – Stockholm September 24, 2009 By : Johan Allonsius.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
1 Investment workstream, GRI NW Investments and Incentives an economic perspective Machiel Mulder Office of Energy Regulation Netherlands Competition Authority.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
How TSOs can further contribute to efficient competition GIE ANNUAL CONFERENCE ATHENS 2005.
Incentive Regulation for business development GTE Conference, Copenhagen 24th September 2004 Paolo Caropreso, COO Business Development.
Securing competitive energy for industry A “target model” on market integration from the perspective of industrial energy consumers Florence Forum Rome,
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Working on investment climate in the NW-region Update By projectleader Investment I1 GRI North-West Investment workstream
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
GRI - SSE Workshop on system access Vienna, EFET SSE © Copyright 2006 EFET European Federation of Energy Traders 1.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
GRI NW Investment Cross border investment Dublin 19 May Bid Capture Process Adam Cooper & Mike Young.
1 The Spanish Gas Industry and the 3 rd Package Antoni Peris Mingot – Sedigas President GIE Annual Conference – Madrid.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Investment workstream 08 June 2009 Cross-border gas transmission‏ Investment project (I1) Update for Joint GRI NW Meeting Where are we heading since last.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Doug Wood GTE-CEER transit workshop Brussels, 24 January 2007 Doug Wood GTE-CEER transit workshop, 24 Jan 2007 European Federation of.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Marie-Claire AOUN CRE
Background and Process
ERGEG GRI – N/NW Region Stakeholder Group Meeting
European Transparency Requirements
Presentation transcript:

Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,

2 Market parties: what should be the result? Investment costs Risk allocation Regulatory framework InputOutput Investment model Economic test Cost per unit Investment thresholds Transparent process for long and short term allocation

3 What has been realised in the first step? First description of the input in the model (costs, risks, regulatory regimes) Development of the Excel model Realisation of the differences between views and perceptions of TSOs, NRAs and market parties Realisation of the differences between markets Basis for one model per country Main result: Better understanding between TSOs, Regulators, Market parties

4 Shippers’ Input Capacity booking interest depending on shippers’ type: –E&P companies : Secure Sales Mainly LT firm base-load capacity –Midstream : Access to various hubs and LT transit from E&P Reduced exposure to secondary market volatility Partly LT and ST optimization –Traders Capacity and spread optimization (Arbitrage) From Intraday/Day-Ahead to 2-3 years Shippers’ position about investment –Capacity bookings are key, NOT flows –Agree for LT commitment, as requested by TSO –Avoid scarcity of capacity by regular development process (Open Seasons or other) –Need for spare capacity when FID is taken –Transparent & Visible Tariff (but not mandatorily fixed for the whole period) –Efficient capacity management practices

5 Tariff methodology calculation impact WACC IRR (Internal Rate of Return) –Combination of assumed costs and assumed revenues –Rate (%) and regulatory period depending on country regulation –Initial XX years tariff (depreciation period), to be revised after each regulatory period Assumed revenues –Tariff (calculated) * Capacity bookings (assumptions) Capacity bookings have various structure: –LT booking before FID and –Actual additional ST bookings and –Future bookings assumptions (new & future LT and future ST) IRR upsides –X years tariff (Regulatory period) –After revision of costs and revenues, new tariff applies for on-going regulatory period –LOW variation expected and smoother tariff compare to WACC –Fair reward in a low risk environment for TSO

6 Investment Trigger : visibility for TSO To answer market needs, TSO must still have visibility Trigger necessary for shippers to have transparency on TSO decision All revenues could not be 100% guaranteed –spare capacity and commitment duration shorter than depreciation Tariff is set on assumptions Trigger for investment : Net Present Value (NPV) ratio Guaranteed NPV based on tariff * Firm bookings before FID (commitments) XX% level to be discussed and agreed between stakeholders Trigger should respond to all stakeholders concerns

7 Other issues What decision after depreciation period ? –Economic value is 0 BUT market value > 0 Efficiency of Investment –What does that mean ? Regulated Asset Base –New investment : dedicated tariff or RAB ? Coexistence with existing tariff –Socialization of cost and revenues ? –Different tariffs for same “route” ? Is this discriminatory for new entrants ? Dedicated New Transit model (Hub-to-Hub) –Entry-Exit Model evolution to Hub-to-Hub model ?

8 Way forward after Dublin Completion of per country overview Integration of national and regional models into one European common methodology Transparent differentiation between costs, risks and risk premiums Clarify investment thresholds Link investment model of Core Group with Economic test and Bidding sheet of EFET

9 Back-up

10 Hub-to-Hub model