National Seminar on Decentralized Governance in Water & Sanitation in Rural India Decentralization initiatives in RWSS Sector in Uttarakhand: A Case Study.

Slides:



Advertisements
Similar presentations
Contract Management and Regulation Vickram Cuttaree The World Bank St. Petersburg – May 24, 2008.
Advertisements

INDEPENDENT WATER SCHEMES IN SAMOA
Water Policy Programme 1 Kampala Workshop February Synthesis of emerging issues/themes 1.Coordination Donors and NGOs (shared objectives) appropriate.
Water Integrity Forum, Delft June 5th 2013 Community Managed Project (CMP) approach: an opportunity to foster integrity in rural WaSH Experience from Ethiopia.
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
MONITORING FUND MANAGEMENT SCHEME Today’s Software for tomorrow YOJNA.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE. 2 Implemented in 12 countries of Africa, Asia, Latin America and the Middle East, through IUCN regional.
A presentation on e-Procurement
Sustainability Evaluation of Community Managed Rural Water Supply Schemes: A Case Study V. K. Sinha Kapil Lall 26 th June, 2012.
Sustaining Secure Water for Rural communities- Prospects for Future ? Rajindra de S Ariyabandu Sri Lanka
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
ENVIRONMENTAL MANAGEMENT PLAN
SUSTAINABLE OPERATIONS OF WATER SUPPLY & SANITATION SERVICES IN INDIA
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
Mauritania MTEF Workshop Water and Sanitation Sector MTEF Experience in Uganda.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
THE PRESENT EXPERIENCE AND CHALLENGES BEFORE THE BULGARIAN HEALTH INSURANCE SYSTEM IN THE FIELD OF HOSPITAL CARE Jeni Nacheva Director of Department for.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
Financing Urban Public Infrastructure
Participatory Audit and Planning (PAP) Process A tool for monitoring and ensuring “Decentralized planning’’ in utilization of Hospital Management Committee.
INDIA: RURAL WATER SUPPLY AND SANITATION PROJECT FOR LOW INCOME STATES.
GRAM VIKAS- AN OVERVIEW. LOCATION OF WORK 19 districts 38,397 families 542 habitations 200,000 people.
A Microfinance Solution for Water, Sanitation, and Health in Peri-Urban and Rural Areas Presented at the Fifth World Water ForumDr. Richard E. Thorsten.
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
Community Managed Project approach Arto Suominen CTA/COWASH/MoWE/Ramboll.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
1 Action Planning to Address Corruption in Water Supply and Sanitation (WSS) Dr. Donal O’Leary Senior Advisor, TI Secretariat.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Infrastructure Service Delivery: An Overview. India’s infrastructure deficits Two types of deficits:  “Investment gap”: Gap between existing and required.
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
Seminar on Village Health and Sanitation Committee A Vision under NRHM Shib Sekhar Datta
1. 2 Size: 33,700 sq. km Population: 4.7 mln, 54% rural GNP per capita: US$ 410, the poorest country in Europe 55% of population poor.
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
Consultation on sustainable sanitation 9 th September 2009 Bangalore Water and Sanitation Program – South Asia (WSP-SA) New Delhi, India
Flow of Project-wise budget Monitoring Internal Controls effectively redefined Group of activities in the project which can be defined and monitored in.
Water Services Trust Fund A presentation for Water Services Boards and Water Service Providers Eng. John Orwa 1  Support provided by the WSTF  Expectations.
Presentation to Joint Budget Committee on: Urban Renewal and Rural development NATIONAL DEPARTMENT OF HOUSING.
Urban Group Presentation. Commitment and Leadership Legislate Policies Increase Allocation Sanitation Champions at different levels Sanitation as a separate.
Social and Gender Equality for Water and Sanitation in Rural India Joe Madiath, Executive Director, Gram Vikas, Orissa Presentation based on the paper.
Jela Tvrdonova, The EU priorities:  Use the Leader approach for introducing innovation in the thematic axis  better governance at the local level.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
ActionSoft Tool for Scheme Implementation & Monitoring.
Tamil Nadu Empowerment and Poverty Reduction Project Audits and Risk Management.
Integrating Demand for Good Governance (DFGG) Elements at the Project Level GAC Core Skills Workshop for Task Teams Janmejay Singh (SDV) June 22 nd 2011.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
World Bank Assisted. Government of Karnataka has set up Karnataka Rural Water Supply & Sanitation Agency (KRWS&SA) at State & District Support Unit at.
Leader Axis Rural Development Policy by Jean-Michel Courades AGRI-F3.
Budgeting and financial management
Treasury of the Republic of Kazakhstan
ITIL: Service Transition
Water Services Trust Fund Field Monitors Training Workshop
National Rural Drinking Water Programme
Parliament and the National Budget Process
Enhancing employers’ involvement in Social Protection policy debates
DEPARTMENT OF WATER AFFAIRS & FORESTRY
PEMPAL, Moscow, October 2016 Natalia Pilets Deputy Head,
Enterprise Content Management Owners Representative Contract Approval
Malawi - Vision Long-term Vision Focus for
TRIPARTITE PARTNERSHIP PROJECT
The SWA Collaborative Behaviors
Portfolio Committee On Sports and Recreation 7 November 2017
GCF business model.
Principles of Financial Management and Disbursement
United Nations Voluntary Fund on Disability (UNVFD)
Rural Partnerships between Small Farmers and Private Sector
Commission proposal for a new LIFE Regulation CGBN meeting
Presentation transcript:

National Seminar on Decentralized Governance in Water & Sanitation in Rural India Decentralization initiatives in RWSS Sector in Uttarakhand: A Case Study By Kapil Lall Director “SWAJAL”, Uttarakhand

Background The sustainable delivery of rural water supply and sanitation service has been a cause of concern for policy planners of the country. The sustainable delivery of rural water supply and sanitation service has been a cause of concern for policy planners of the country. This has led to a paradigm shift in the way the Government now approaches the rural water supply and sanitation sector. This has led to a paradigm shift in the way the Government now approaches the rural water supply and sanitation sector. Uttarakhand state is the first state in the country to implement this paradigm shift in both letter and spirit across its entire territory, as a Sector-wide Approach (SWAp). Uttarakhand state is the first state in the country to implement this paradigm shift in both letter and spirit across its entire territory, as a Sector-wide Approach (SWAp). The objective of this presentation is to share good practices being adopted in the state under the Uttarakhand Rural Water Supply & Sanitation Project (URWSSP) and NRDWP etc. for replicability of the processes in all other parts of the country by adapting to suit their specific situations. The objective of this presentation is to share good practices being adopted in the state under the Uttarakhand Rural Water Supply & Sanitation Project (URWSSP) and NRDWP etc. for replicability of the processes in all other parts of the country by adapting to suit their specific situations.

URWSSP IN BRIEF URWSSP is the first project in the RWSS which is based on Sector wide approach (SWAp)- URWSSP is the first project in the RWSS which is based on Sector wide approach (SWAp)- The project covers entire rural areas of the Uttarakhand State. The project covers entire rural areas of the Uttarakhand State. The project is facilitated by the Department of Drinking Water, GoUK and executed by three agencies namely Uttarakhand Peyjal Nigam (UJN), Uttarakhand Jal Sansthan (UJS) and Project Management Unit (Swajal). The project is facilitated by the Department of Drinking Water, GoUK and executed by three agencies namely Uttarakhand Peyjal Nigam (UJN), Uttarakhand Jal Sansthan (UJS) and Project Management Unit (Swajal). The project has a total budget of $ 224 million of which the IDA credit is limited to a maximum of $ 120 million. The project has a total budget of $ 224 million of which the IDA credit is limited to a maximum of $ 120 million. The Project period is November 2006 to June, The Project period is November 2006 to June, The project aims to benefit about 1.2 million people or about 20% of the rural population and improve sanitation in about 30% of rural communities to be declared free of open defecation. The project aims to benefit about 1.2 million people or about 20% of the rural population and improve sanitation in about 30% of rural communities to be declared free of open defecation.

4 Uniqueness of the Project Sector Wide Approach (SWAp) Project demonstrates paradigm shift to Sector-wide Approach (SWAp) ‘Global First’ for uniform policies and institutional arrangements Project demonstrates paradigm shift to Sector-wide Approach (SWAp) ‘Global First’ for uniform policies and institutional arrangements PRIs and local communities plan, procure, construct, operate and maintain RWSS facilities PRIs and local communities plan, procure, construct, operate and maintain RWSS facilities Intra-village SVS & intra-village MVS: full responsibility of Gram Panchayats Intra-village SVS & intra-village MVS: full responsibility of Gram Panchayats Bulk Water Supply MVS: responsibility of sector institution. Bulk Water Supply MVS: responsibility of sector institution. Three implementing agencies (UJN, UJS and Swajal) working in synergy for implementing the SWAp Three implementing agencies (UJN, UJS and Swajal) working in synergy for implementing the SWAp Community UWSSC Gram Panchayat NGO Social Audit Committee Village Level DIAs DWSC DWSM District Level State PMU/ UJN/UJS SWSM DWD State Level Striving to give the community a voice

RWSS INSTITUTIONAL ARRANGEMENTS

FUND FLOW MECHANISM The funds from the State Govt. flow directly to the State level implementing agencies (PMU, UJN and UJS). The funds from the State level are transferred to the district level institutions of PMU, UJN and UJS, based on Annual Work Plans and Budgets. GoUK UJN HQUJS HQPMU HQ DIA-UJNDIA-UJSDPMU GP UWSSCBeneficiary GoUK PMU HQ GoUK UJN HQ PMU HQ GoUK UJS HQ UJN HQ PMU HQ GoUK DIA-UJS UJS HQ UJN HQ PMU HQ GoUK DIA-UJN DIA-UJS UJS HQ UJN HQ PMU HQ GoUK DPMU DIA-UJN DIA-UJS UJS HQ UJN HQ PMU HQ GoUK GP DPMU DIA-UJN DIA-UJS UJS HQ UJN HQ PMU HQ GoUK UWSSC GP DPMU DIA-UJN DIA-UJS UJS HQ UJN HQ PMU HQ GoUK

Processes Followed Implementation Pre Planning Planning O&M

8 Process: Planning Phase Review by DWSC Grievances redressal in community wide meetings. Approval by DWSM Monitoring & Public Disclosure Awareness Creation, Organizing Community into Groups, Trainings Preparation of Community Action Plan Feasibility & Agree-To-Do Meeting DPR & Implementation Phase Proposal Collection of Upfront Contribution Signing of IPQA Record Keeping by UWSSC Wall Writing/Hoardings Monthly Progress Report by SO to DIA Community Wide Meeting UWSSC Formation & Opening Capital and O&M Account Continuous monitoring by DIA Concurrent monitoring by Third Party. Web based monitoring system. SO Yes

9 Process: Implementation Phase Funds Release to GP by DIA Quality Control Supervision by Third Party Preparation of IPCR Start of O&M Phase Vetting o IPCR by GP/UWSSC Account Settlement by DIA/DWSM Transfer to Funds from GP to UWSSC UWSSC/GP Material Procurement & Construction Collection of balance Contribution Utilization of Fund Record Keeping Fulfillment of Payment Conditions by GP/UWSSC SO Training & Capacity Building Management Support to GP/UWSSC

10 Process: O&M Phase UWSSC/GP O&M of Scheme Collection of O&M Tariff Enforcing Bye Laws Sanction new connection Record Keeping SO Refresher Training Handholding on Maintenance of Account Establishment Of O&M System Exit DIA Exit from the village after 4 months Technical Support to UWSSC

INNOVATIONS AT A GLANCE URWSSP Single Set of Schedule of Rates Constitution of TRC Capacity building of all stakeholders IEC HRD MVS vs SVS Integrated delivery Fine-tuning of SOs Selection Criteria Model Bye-laws for UWSSC Legal Status to UWSSC Planning Unit: Habitation Insurance of schemes Social Audit Committee Grievance redressal Elaborate Exit Strategy Online M&E Community Contracting

‘Agree-To-Do’ meeting for finalization of technological option Training on documentation & account keeping maintenance

Wall writing FTK training

Social Audit Committee Wall Writing of Social Audit Committee

Social Audit Committee The Gram Panchayat will directly constitute a Social Audit Committee with five members for a period of two years. The Committee members; The Gram Panchayat will directly constitute a Social Audit Committee with five members for a period of two years. The Committee members; Should be respectable members of the community and on whom the poor have faith. Should be respectable members of the community and on whom the poor have faith. Not immediately related to the GP members or UWSSC members. Not immediately related to the GP members or UWSSC members. Should not be members of any of the decision making committees Should not be members of any of the decision making committees At least three members should be from target population. At least three members should be from target population. The Social audit Committee will perform the following functions: The Social audit Committee will perform the following functions: Ensure that all the committees follow Procurement Manual. Ensure that all the committees follow Procurement Manual. Report any violation or deviation of rules to Gram Panchayat. Report any violation or deviation of rules to Gram Panchayat. Monitor the adherence of project principles and rules in selection of beneficiaries, implementation of sub projects and all decisions of UWSSC. Monitor the adherence of project principles and rules in selection of beneficiaries, implementation of sub projects and all decisions of UWSSC. 15

Monitoring and performance tracking Web based monitoring

Exit: Withdrawal from village Transfer of Assets & Tools Trouble Free Sustainable O&M Public Interest Disclosure in community wide meeting

Impacts Building Local capacities: The new decentralized approach has been received with a high level of enthusiasm from local governance institutions. By building the capacity of these institutions to design, implement and manage their own works - in addition to managing procurement, finances and accounting- they have been equipped to take on other development projects in their areas, whether under MNREGA or any other program. Building Local capacities: The new decentralized approach has been received with a high level of enthusiasm from local governance institutions. By building the capacity of these institutions to design, implement and manage their own works - in addition to managing procurement, finances and accounting- they have been equipped to take on other development projects in their areas, whether under MNREGA or any other program. Eliminating Layers of bureaucracy: Decentralization to local communities has eliminated layers of bureaucracy, reducing the scope for leakage of funds - an estimated 40 percent of funds deployed. time and expenses involved in lodging complaints with the authorities, paying bills, getting corrections in wrong bills, and getting sanctions for new water connections. Repairs are now much quicker and more long-lasting because of the strict supervision exercised by local communities. Eliminating Layers of bureaucracy: Decentralization to local communities has eliminated layers of bureaucracy, reducing the scope for leakage of funds - an estimated 40 percent of funds deployed. time and expenses involved in lodging complaints with the authorities, paying bills, getting corrections in wrong bills, and getting sanctions for new water connections. Repairs are now much quicker and more long-lasting because of the strict supervision exercised by local communities.

Impacts Savings for state exchequer: Detailed assessments show that by decentralizing service delivery to local communities, the state government’s savings include: savings in institutional costs and O&M costs. Thus the State Government has to provide lesser budgetary support through State Exchequer as GP meets the O&M expenses including energy costs. Savings for state exchequer: Detailed assessments show that by decentralizing service delivery to local communities, the state government’s savings include: savings in institutional costs and O&M costs. Thus the State Government has to provide lesser budgetary support through State Exchequer as GP meets the O&M expenses including energy costs. Greater availability of time for Line Departments: GP/UWSSC takes up the full responsibility of O&M, with back-up support by the UJS, as and when required. Thus line department have more availability of time for managing complex schemes and lesser management problems. Greater availability of time for Line Departments: GP/UWSSC takes up the full responsibility of O&M, with back-up support by the UJS, as and when required. Thus line department have more availability of time for managing complex schemes and lesser management problems.

Impacts Communities have the following advantages: Communities have the following advantages: lesser dependence on outsiders for water supply service i.e. Gram Swaraj (Village Self Rule)- leading to ‘community pride’ & ‘community control’. lesser dependence on outsiders for water supply service i.e. Gram Swaraj (Village Self Rule)- leading to ‘community pride’ & ‘community control’. reduction in coping cost as well as more availability of house hold space due to elimination of storing water in larger containers reduction in coping cost as well as more availability of house hold space due to elimination of storing water in larger containers elimination of travel time and travel cost in lodging no-water complaints, making payment of bills and getting sanction of new water connection elimination of travel time and travel cost in lodging no-water complaints, making payment of bills and getting sanction of new water connection Improvement in Mean Time Between Failure (MTBF) due to better quality of repairs and strict control/supervision by the community. Improvement in Mean Time Between Failure (MTBF) due to better quality of repairs and strict control/supervision by the community. Reduction in women’s drudgery of about 2-3 hours per day leading to better quality of life i.e. utilization of their quality time in caring their children and leisure time besides income generation in some cases. Reduction in women’s drudgery of about 2-3 hours per day leading to better quality of life i.e. utilization of their quality time in caring their children and leisure time besides income generation in some cases.

21 Thanks to the empowered community for keeping the SWAp philosophy and program on the path to success !