MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,

Slides:



Advertisements
Similar presentations
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Advertisements

Christian Löffler Collaring to cold mass finishing 2 Outline Available tooling and operational status CMM of 5.5m coils Instrumentation Pairing.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF Shell & Yoke Assembly Procedure
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LARP Internal Review of the MQXFA Mechanical Structure Design and Functional Requirements 7/16/2015 Dan Cheng, Helene Felice Development of the Shell-Based.
MQXC Nb-Ti 120mm 120T/m 2m models
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Rodger Bossert/Shlomo Caspi
ESAC Review February 2013 CEA Saclay
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
ERMC/RMM activities May 2017
J.C. Perez on behalf of SMC collaboration team J.C. Perez
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
Glyn Kirby Magnet AssemblyTechniques.
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Presentation transcript:

MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice, P. Ferracin, Ph. Grosclaude, R. Hafalia, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T. Sahner, A. Temporal

OUTLINE MQXFS magnet Main assembly steps and status of components and tooling External aluminium shell configuration 150 mm mechanical model Assembly and Cool-down to 77K Conclusions November 18th 2014 J.C. Perez3

MQXFS cross section November 18th 2014 J.C. Perez4 Stainless steel shell Iron Yoke Alignment Pins Pad Iron Master Aluminum Collars Aluminum shell Welding key

Shells preparation for vertical assembly November 18th 2014 J.C. Perez5 The shells are instrumented with the strain gauges before starting the assembly sequence 4 short alignment pins are inserted and glued in the lower inner shell slots of the first shell to be installed on top of the assembly base plate The relative angular alignment between the 2 shells is guaranteed by the use of the 2 long pins The base plate will be leveled and bolted to the floor The shells are manipulated using a 4 sling lifting tool and adjustable bolted lifting eyes.

First batch of aluminium Shell November 18th 2014 J.C. Perez6 4 shells have been ordered and CMM controlled at CERN and LBNL (pins slots position out of tolerance) 1 pair of shell has been delivered to LBNL The CERN and LBNL pairs of shells have been instrumented and are ready for assembly

¼ yoke lifting and preparation for insertion November 18th 2014 J.C. Perez7 The ¼ yokes are manipulated with a dedicated lifting and pivoting tool. The yokes will be inserted on the shells in vertical position Two lifting tools CE certified have been delivered end of October (1 will be shipped to LBNL by end of November 2014)

¼ yoke insertion November 18th 2014 J.C. Perez8 Upper radial clamp Lower radial clamp Dedicated clamping tools will be used to radially clamp the ¼ yoke in the shells The angular alignment of the first ¼ yoke is defined by 1 long middle pin and 2 small pins located at the shell extremities

Removing central pin holding tool November 18th 2014 J.C. Perez9 The holding tooling of the middle pin is removed before clamping the yoke at its final radial position (required gap between yoke and shell to allow pin removal ± 0.3 mm) Two sets of iron yokes have been delivered. One set is going to be shipped to LBNL

3rd and 4th ¼ insertion November 18th 2014 J.C. Perez10 The Yoke lifting tool is equipped with 2 guiding wheels forcing the yoke against the plastic spacers 2 longitudinal plastic spacers will be used to guarantee a constant gap between yoke and shell preventing interference with the already inserted yokes 2 stainless steel blocks for welding key alignment and tack welding will be bolted to the yokes

Bladders support structure for shell loading November 18th 2014 J.C. Perez11 A cross-shape support inserted in the structure is used to support the bladders for shell pre-loading operation Temporary yoke keys will be inserted in the yoke gaps 4 bladders 1549 mm * 57 mm will be used for shell pre-loading operation.

Lifting and rotating Yoke and Shell assembly CERN concept November 18th 2014 J.C. Perez12 The yoke and shell assembly will be transported, using a 4 sling lifting tool and adjustable lifting eyes bolted on the yoke, to an existing rotated device. The yoke and shell assembly will be flipped from vertical to horizontal position.

Lifting and rotating Yoke and Shell assembly LARP concept 18/11/2014 J.C. Perez13 The vertical yoke and shell assembly will be lifted by two offset lifting eyes from “ears” that are attached to the yoke tie rods. A chain fall is connected to a third lifting eye at the bottom, which allows the rotation of the assembly to horizontal. The horizontal assembly is placed on modified LQ cradles.

Coils and collars preparation November 18th 2014 J.C. Perez14 The coils are equipped with 2 layers of Kapton for ground insulation. The fiber glass keys are inserted in the longitudinal pole slot. Two ground insulation layers are glued to the aluminum collars. Assembly table delivered and will be tested during mechanical model assembly The aluminum dummy coils are being instrumented with strain gauges (will be ready by end of November at CERN and LBNL)

Coils rotation November 18th 2014 J.C. Perez15 CERN: The first pair of coils to be assembled will be rotated up-side down and lifted from their inner face. The coil handling tooling is designed to manipulate the coils from inner and outer radius. LBNL: coil lifting tooling designed based on LARP experience CERN: adaptation of an existing 11 T dipole rotating device for MQXFS. Delivery expected by end of November LBNL: adaptation of a LARP rotating device for MQXFS. Assembled.

Coil pack assembly: mounting the coils November 18th 2014 J.C. Perez16 The fabrication drawings of the coil pack assembly tooling parts are ready at CERN and design ongoing at LBNL The assembly bench delivery is foreseen in February 2015 at CERN The first mechanical assembly using aluminum dummy coils will not be performed with this tooling

Collars and pads assembly November 18th 2014 J.C. Perez17

Masters and coil pack preparation November 18th 2014 J.C. Perez18

Coil-pack insertion CERN concept November 18th 2014 J.C. Perez19 Linear guides will be used to slide the coil-pack into the yoke cavity

Bladders operation CERN concept November 18th 2014 J.C. Perez20 Bladders and slip shims are removed after full loading operation Coil pack inserted in the yokeMaster clamps are removed Lower bladder is pressurized and top nominal key inserted Insertion guides are removed and lower nominal keys inserted Bladders operation

Coil-pack insertion LARP concept J.C. Perez Hydraulic actuators Assembly master Concept for MQXFS Scalable for MQXFA November 18th

Coil-pack insertion LARP concept J.C. Perez Coil pack assembled on assembly master November 18th

Coil-pack insertion LARP concept J.C. Perez Coil pack assembled on assembly master Activation of the actuators November 18th

Coil-pack insertion LARP concept J.C. Perez Coil pack assembled on assembly master Activation of the actuators Installation of the rollers modules (8 polyurethane wheels each) underneath the coil pack November 18th

Coil-pack insertion LARP concept J.C. Perez Coil pack assembled on assembly master Activation of the actuators Installation of the rollers modules (8 polyurethane wheels each) underneath the coil pack Actuator released 1 mm gap between assembly master and coil pack November 18th

Coil-pack insertion LARP Concept J.C. Perez “Rolling” of the coil-pack into structure using a winch Wheels roll in the cooling channels Wheel rack removal during bladder operation Bladders delivered at LBNL November 18th

Longitudinal loading and splicing November 18th 2014 J.C. Perez27 Magnet equipped with the longitudinal pre-loading system 2 sets of tooling ready Nitronic 50 end-plates, aluminum rods and the pre-loading tooling will be shipped to LBNL beginning of December Splice box design: work in progress

New outer aluminium shell configuration November 18th 2014 J.C. Perez28 4 new shells are being machined and foreseen to replace the existing batch The possibility to use 1 shell (774 mm long) and two half shells (387 mm long) for MQXFS is being considered 2 weeks turnaround at LBNL to split one existing shell Using 3 shells instead of 2 for the 1.5 m model will not significantly impact the assembly procedure nor the schedule Impact of shell segmentation on MQXFS MQXFA/B

Mechanical 150 mm mock-up November 18th 2014 J.C. Perez29 3 cool-down to 77K have been performed showing good correlation with FEM models Data analysis is in progress The force intercepted at cold by the G11 coil keys will be quantified with a dedicated test Low-grade coil #101 will be cut and used for further assembly trials

Conclusions MQXFS assembly procedure has been defined and partially tested during the assembly of the 150 mm mock-up Tooling design and assembly procedures are scalable for longer magnets 2 sets of Yoke and shell assembly tooling are operational (CERN & LBNL) Shells, collars, masters and dummy aluminium coils have been delivered to LBNL Pads, yokes and yoke lifting tool will be delivered to LBNL by end of November 2014 All CERN missing assembly tooling (except coil pack assembly table) will be delivered in November CERN and LBNL will be ready to start the mechanical assembly with instrumented aluminium dummy coils beginning of December/January After Xmas brake, 3 cool-down to 77K,with different pre-stress applied to the dummy coils, are foreseen in CERN SM18 LN 2 test station and 1 cool-down at LBNL A decision for the final aluminium shell configuration on MQXFS is required within 2 weeks The 150 mm mock-up equipped with segments of coil #101 will be used to better understand the structure behaviour and define the shimming values November 18th 2014 J.C. Perez30

November 18th 2014 J.C. Perez31 The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement ご清聴ありがとうございま した