SC Project Review of NCSX WBS5 - Central Controls and Computing August 15-17, 2007 WBS5 Manager: Paul Sichta.

Slides:



Advertisements
Similar presentations
Relocation of the Operations Control Center Oil Movements May 4, 2007 For RCAC Board Meeting.
Advertisements

June 2010 At A Glance The Room Alert Adapter software in conjunction with AVTECH Room Alert™ devices assists in monitoring computer room environments as.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Process Control and Data Acquisition Systems
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Operations Management and Technology Ross L. Fink.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Downtown Seattle Transit Tunnel (DSTT)
NCSX NCSX CDR May 21-23, 2002 G. E. Oliaro Slide 1 WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro for the Computer I&C, Network.
Computer Process Control Application. Computer process control In computer process control, a digital computer is used to direct the operations of a manufacturing.
SCADA and Telemetry Presented By:.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
Central I&C Computing Presented at the Physics Operations Course Feb P. Sichta.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Networks and Telecommunications Strategies Dr. Robert Chi Chair and Professor, IS department Chief editor, Journal of Electronic Commerce Research.
SC Project Review of NCSX, April 8-10, 2008 NCSX Heater Control System P. L. Goranson Work package 1270.
Princeton University Cost & Schedule Review of NCSX May 1-4, 2007 WBS5 – Central Controls and Computing Paul Sichta.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
SCSC 311 Information Systems: hardware and software.
NCSX NCSX Project Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
NCSX NCSX CDR May S. Ramakrishnan Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX CDR May
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Asa Parker Jase Skellie Geovanny Rodriguez Cow Power MOM (Monitoring and Operating Module) CVPS Contacts: David Dunn Rob Nelson Faculty Mentor: Josh Bongard.
Topics of presentation
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PWR System April
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
Prepared: March 2000 / PANORAMA System Architecture for SC ELECTRIC.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
NCSX NCSX Project Meeting March 21, 2003 G. E. Oliaro Slide 1 WBS5 Central Instrumentation/Data Acquisition and Controls G. E. Oliaro Computer I&C, Network.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
CERN Timing Workshop, Geneva, 15 Feb Geneva, 15 Feb 2008 Franck Di Maio – ITER IO Geneva, 15 Feb 2008 Franck Di Maio – ITER IO CERN Timing Workshop.
I & C.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Princeton University Review of the NCSX Project, March 2008 WBS5 - Central Controls and Computing March 13,2008 WBS5 Manager: Paul Sichta.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
IT Jobs Positions available in the field of Information Technology.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
Latency and Communication Challenges in Automated Manufacturing
Lesson 3 SCADA.
The ILC Control Work Packages
How SCADA Systems Work?.
COntrol, Data Access and Communication System for ITER
ILC Integrated Control System (Functional View)
PLANNING A SECURE BASELINE INSTALLATION
ESS Main Control Room & ICS Infrastructure
PSS verification and validation
Presentation transcript:

SC Project Review of NCSX WBS5 - Central Controls and Computing August 15-17, 2007 WBS5 Manager: Paul Sichta

SC Review, WBS5 Central Controls and ComputingPage2 WBS5 Elements NCSX Central Controls and Computing will provide the equipment and services for: 1) integrated and remote control; 2) data acquisition, analysis, and storage; 3) facility timing and synchronization; 4) central safety and interlocks. Network and Fiber Optic Infrastructure (WBS 51) Central Instrumentation and Control (WBS 52) Data Acquisition and Facility Computing (WBS 53) Facility Timing and Synchronization (WBS 54) Real Time Plasma and Power Supply Control (WBS 55) Central Safety and Interlock System (WBS 56) Control Room Facility (WBS 57)

SC Review, WBS5 Central Controls and ComputingPage3 NCSX Computing Overview OPIs workstations Diagnostics VLAN NCSX MDSplus Server SAN Tape Archive PPPL Network Timing & Sync Systems Diagnostics: Magnetics Visible Camera E-Beam PPPL Core Switch & Internal Firewalls HIGH PERFORMANCE FIBER CHANNEL Offices Control Systems VLAN EPICS Engineering Computing Systems NCSX Computing Pool 4/20/07 PS PLC VLAN PLC Programmable Logic Controllers www offsite collaborators PPPL Firewall

SC Review, WBS5 Central Controls and ComputingPage4 Budget Partition WBS5 Resources WBS5 Budget $ 1.1 M Softwr/Elec Engineers: 2.4 years Elec/Mech/Draft Techs: 1.6 years ‘Materials & Services’: $ 211 K

SC Review, WBS5 Central Controls and ComputingPage5 WBS5 Schedule Tasks: PDR, FDR, Fabricate, Install, PreOp Test

SC Review, WBS5 Central Controls and ComputingPage6 Basis of Estimate Labor: –NSTX first plasma effort. –personal experience. –~25% for ‘green’, mentored engineering talent. –field estimates (e.g. Eric Perry). M&S –recent purchases of similar equipment. –current catalog prices. Design Complexity & Maturity –The systems are generally based upon the existing NSTX design, so complexity is relatively low. However, the current workscope has neither Preliminary or Final design.

SC Review, WBS5 Central Controls and ComputingPage7 WBS 51 – Networking & Fiber Optic Infrastructure an infrastructure of fiber optic cables that connect the main experimental areas. All WBS can use these. conventional (tcp/ip) networking equipment such as switches and routers and wireless-access-points (WAP).

SC Review, WBS5 Central Controls and ComputingPage8 WBS 51- Cost & Schedule Detail Labor Engineering: 160 hours Technician: 770 hours M&S Contingency & Risk Design Maturity: Medium Design Complexity: Low Uncertainty Range: -10%/+15%

SC Review, WBS5 Central Controls and ComputingPage9 WBS 52 – Central Instrumentation and Controls Supervisory and integrated control of NCSX engineering subsystems and diagnostics. Like NSTX, will use the EPICS software. System provides data trending, alarm logging, operator displays, and integrated process control and monitoring functions for NCSX. NCSX Test Cell audio and video support.

SC Review, WBS5 Central Controls and ComputingPage10 WBS 52- Cost & Schedule Detail Labor Engineering: 720 hours Technician: 460 hours M&S Contingency & Risk Design Maturity: Medium Design Complexity: Low Uncertainty Range: -10%/+15%

SC Review, WBS5 Central Controls and ComputingPage11 WBS 53 – Data Acquisition and Facility Computing Automated pre-shot device configuration and post-shot data acquisition. Like NSTX, will use the MDSplus software. A software infrastructure to catalog and manage experimental data for subsequent retrieval and analysis. A pool of computers for data analysis. An Applications Program Interface (API) for commonly used software, such as C, IDL, Matlab, LabVIEW, and EPICS.

SC Review, WBS5 Central Controls and ComputingPage12 WBS 53- Cost & Schedule Detail Labor Engineering: 820 hours Technician: 80 hours M&S Contingency & Risk Design Maturity: Medium Design Complexity: Low Uncertainty Range: -10%/+15%

SC Review, WBS5 Central Controls and ComputingPage13 WBS 54 – Timing and Synchronization The Facility Timing and Synchronization System (T&S) will provide the hardware and software that facilitates the synchronization of hardware and equipment to the ‘microsecond’ degree, and computer programs on NCSX computers to the ‘seconds’ degree. The T&S requirements include: Local timing resolution of 100 nanoseconds, complex-wide synchronism < 10 microseconds. Support 64 hardware events. Timing signals are low voltage, high speed, and electrically isolated, equivalent to TFTR and NSTX. Generation_1 of the event decoder has been in use on NSTX for several years.

SC Review, WBS5 Central Controls and ComputingPage14 WBS 54- Cost & Schedule Detail Labor Engineering: 760 hours Technician: 560 hours M&S Contingency & Risk Design Maturity: Medium Design Complexity: Medium Uncertainty Range: -15%/+25%

SC Review, WBS5 Central Controls and ComputingPage15 WBS 55 – Real Time Plasma and Power Supply Control For CD-4/MIE, the control system must provide synchronized control signals for the (approx.) seven NCSX power supplies, and one gas injector. The control methodology will be open-loop; no feedback will be used to determine the computer’s outputs. WBS4 will specify the detailed requirements and algorithms for power supply control. WBS2 will provide the detailed requirements for gas injection control. A standard PC/LabVIEW-based system architecture will be used to fulfill the WBS55 systems.

SC Review, WBS5 Central Controls and ComputingPage16 WBS 55- Cost & Schedule Detail Labor Engineering: 620 hours Technician: 104 hours M&S Contingency & Risk Design Maturity: Medium Design Complexity: Low Uncertainty Range: -10%/+15%

SC Review, WBS5 Central Controls and ComputingPage17 WBS 56 – Central Safety and Interlock System The Central Safety Interlock System (CSIS) will provide system wide coordination of personnel and hardware interlocks. Each NCSX high-energy (or otherwise hazardous) entity will interface with the CSIS. The high-energy subsystem will be responsible for ensuring that the design of its (local) interlocks and safety features are adequate. The CSIS will provide a global E-Stop system, permitting individuals the ability to shutdown all hazardous equipment using E-Stop pushbuttons located throughout the NCSX complex. An Access Control System will be incorporated to control access into hazardous areas, such as the Test Cell. Entry into these areas while “unsafe” will cause an automatic E-Stop. The CSIS will provide the NCSX Chief Operation Engineer (COE) with a centralized point of control to enable/disable, arm/disarm, and shutdown each NCSX high-energy (or otherwise hazardous) subsystem The CSIS M&S costs estimates are based on a cursory review of online pricing. A system configuration, parts list, and price quotes have not been developed.

SC Review, WBS5 Central Controls and ComputingPage18 WBS 56- Cost & Schedule Detail Basis of Estimate This estimate is based upon a conceptual design for an off-the-shelf Safety-class Programmable Logic Controller (Safety PLC). Contingency & Risk Design Maturity: Low Design Complexity: Low Uncertainty Range: -15%/+25% Labor Engineering: 600 hours Technician: 840 hours M&S $44 K for Safety PLC, I/O, communications, software, training, and installation. A price-quote has not been obtained.

SC Review, WBS5 Central Controls and ComputingPage19 WBS 57 – Control Room Facility The Control Room will support PPPL physicists, engineers, and collaborators. The former PLT and PBX control rooms are approximately 2200 sq. ft. and will be used as the NCSX main control room. –For CD-4/MIE, WBS 5 will provide approximately six surplus office-style tables and chairs. The Computing Center will hold the bulk of networking equipment, NCSX server computers, and will be a fiber optic cable hub location for the WBS51 fiber optic cable infrastructure. Approximately 1200 sq. ft. of the former PLT DAS computer area will be used as the NCSX Computing Center. A ‘normal’ Control Room Facility will not be provided for CD-4/MIE. However, facilities such as lighting, power, fire suppression, HVAC, basic network communications, and telephones will be provided (not part of the NCSX workscope). The extent to which the Control Room Facility will be outfitted under GPP (as a general-use area) is unclear at this time. GPP planning is in-process.

SC Review, WBS5 Central Controls and ComputingPage20 Summary The similarity to NSTX’s central controls and computing and the availability of an experienced and technically diverse staff provides confidence that WBS5 can effectively support the NCSX project. The remaining work has generally been identified. The effort that leads to the Final Design Reviews will produce the best estimate. Simultaneously supporting two ‘large’ machines (NSTX, NCSX) is ‘new ground’ for the computer engineering staff. This situation presents a potential for impacting WBS5 schedule performance. WBS5’s workscope and cost have been substantially reduced since the NCSX CDR (2002) and PDR (2003). Although the M&S costs could be further reduced, doing so would lessen the effectiveness of the staff which would tend to increase the labor costs.