CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.

Slides:



Advertisements
Similar presentations
X Window JianJing Cao (ID #98284). Content Introduction X Window System Function Window Principle How X Window Works Security.
Advertisements

Mark Ortiz Enterprise Architecture & Standards. CIM Data Requirements Overview Based on SEP 2.0 TRD Included previous SEP data requirements, NASBE, and.
McGraw-Hill/Irwin © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. Web Services Ellen Pearlman Eileen Mullin Programming the Web Using XML.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 5/3/2011.
INTEGRATION USING CIM BASED INTERFACES Endeavour Energy.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
EPRI Smart Grid Demonstration and CIM Standards Development
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2009 SISCO, Inc. IOP Status Report CIMug Meeting Margaret.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Advanced Networking for DVRs
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Security.
KaZaA: Behind the Scenes Shreeram Sahasrabudhe Lehigh University
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
INTRODUCTION TO WEB DATABASE PROGRAMMING
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
© 2011 EnerNex. All Rights Reserved. UCAIug OSG Conformity Meeting.
SNIA/SSIF KMIP Interoperability Proposal. What is the proposal? Host a KMIP interoperability program which includes: – Publishing a set of interoperability.
NASA/ESA Interoperability Efforts CEOS Subgroup - CINTEX Alexandria, Sept 12, 2002 Ananth Rao Yonsook Enloe SGT, Inc.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc – 9 Meter Reading and Control.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
Common Information Model and EPRI Smart Grid Research
Introduction to Interprocess communication SE-2811 Dr. Mark L. Hornick 1.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
Lecture 15 Introduction to Web Services Web Service Applications.
OpenSG and Conformity Bruce Muschlitz EnerNex Corporation Knoxville October 2009.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
AURA MOWG EMOS & IST Re-Engineering 2 October 2007 Pat Johnson.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
AEP IOP Suggestions Greg Steinmetz 11/11/2009. AEP's gridSMART Project - Implementation of CIM within Metering/AMI South Bend pilot 2 IOP Suggestions.
Service Definition Technical Guide AMI-Enterprise.
Chapter 15 The Internet Cisco Learning Institute Network+ Fundamentals and Certification Copyright ©2005 by Pearson Education, Inc. Upper Saddle River,
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Ameen H. Hamdon, P.Eng President, SUBNET Solutions Inc. EMMOS 2015 September 22, 2015.
CIM Test Methodology Overview John Simmins 5/24/2011.
CIM Test Methodology Overview John Simmins 5/3/2011.
Project CIM Test Development Process
Typical M²M applications InduBox GPRS sample applications.
Objective What is RFT ? How does it work Architecture of RFT RFT and OGSA Issues Demo Questions.
CheckPoint Reporting System for Seismic Surveys Setting Up for Multiple Users December 2012 Mid Point Geo Limited PO Box 7437 Reading Berkshire RG27 7HQ,
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
Install, configure and test ICT Networks
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Speaker’s Name Speaker’s Job Title Event Name Date Main Title Subtitle.
Chapter 13 FTP and Telnet Cisco Learning Institute Network+ Fundamentals and Certification Copyright ©2005 by Pearson Education, Inc. Upper Saddle River,
5th Edition, Irv Englander
Testing Technical Committee Paris, France August 24, 2010
CIM Test Development Process
Module 4 Remote Login.
CIM Test Methodology Overview
CIM Test Development Process
File service architecture
RSA 2019 Interop Demonstration Event
Chapter 5 멀티스레드 u-Network Design Lab 4.
Client/Server and Peer to Peer
Interoperability Test Message Patterns for IEC
Error Handling for IEC Scott Neumann September 29, 2009.
Interoperability Test Message Patterns for IEC
Interoperability Test Message Patterns for IEC
IS 4506 Configuring the FTP Service
Presentation transcript:

CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011

2 © 2011 Electric Power Research Institute, Inc. All rights reserved. Agenda 1.Progress since last meeting 2.Issues, opportunities and risks arising during the previous week 3.Verify progress against stakeholder expectations 4.General issues discussion 5.Action items for individuals 6.Expected work output during next week

3 © 2011 Electric Power Research Institute, Inc. All rights reserved. Progress Since Last Call Mark Ortiz furnished VPN client for Consumers server –Windows 64 bit version available EPRI FTP site –Windows 32 bit version also needed Sample messages created

4 © 2011 Electric Power Research Institute, Inc. All rights reserved. Paris CIM Interop Test Last Week

5 © 2011 Electric Power Research Institute, Inc. All rights reserved. Meter Outage System Test ECITP 2.05 / 2.06

6 © 2011 Electric Power Research Institute, Inc. All rights reserved. Outage Management Part 9 Message Mapping Test Procedures Systems Under Test Service Operati ons MessagesPayload XSD XSD created 1.05 Meter Outage Nominal Conformance 1.06 Meter Outage Message and XML Errors 2.05 Meter Outage Nominal Interoperability 2.06 Meter Outage System Errors MDMS, OMS Created Create Reply Create Reply Create Reply EndDeviceEvents MeterServiceRequest MeterServiceRequest EndDeviceControls EndDeviceControls MeterReadings MeterReadings EndDeviceEvents MeterServiceRequest (Message) EndDeviceControls (Message) MeterReadings MeterReadings EndDeviceEventsMessage MeterServiceRequestsMessage MeterServiceRequestsMessage EndDeviceControlsMessage EndDeviceControlsMessage MeterReadingsMessage MeterReadingsMessage

7 © 2011 Electric Power Research Institute, Inc. All rights reserved. CIM Common Message Structure

8 © 2011 Electric Power Research Institute, Inc. All rights reserved. UML for EndDeviceControls Messages

9 © 2011 Electric Power Research Institute, Inc. All rights reserved. Sample CreateEndDeviceEvents Message Create EndDeviceEvent T12:00:00-05:00 source_identifier of requesting machine Need Sample “Initiate Service” message

10 © 2011 Electric Power Research Institute, Inc. All rights reserved. Sample “Last Gasp” Meter Power Outage EndDeviceEvent Message Created EndDeviceEvent T12:00:00-05: T18:52: : Meter Last Gasp loss of power 3dc53ee5-777e-50b a1c224f45f3d Meter23253

11 © 2011 Electric Power Research Institute, Inc. All rights reserved. Open Action Items AssigneeActionStatus John SimminsWork with internal resources to separate lab network completely from the EPRI operational network. In process Mark OrtizProvide written procedures on access to Consumer’s DMZ network and server In process Kay StefferudContract Mark Ortiz to request written procedures to access the Consumers server. In process Margaret GoodrichReview sample abstract test case.In process Mark OrtizSend Kay excel spreadsheet with test set-up information. In process

12 © 2011 Electric Power Research Institute, Inc. All rights reserved. Expected Work Output During the Next Week Meeting with Consumers (Mark) and EnerNex (Kay) –Consumer server login process Continue Sample Messages –Sample message from IOP would be helpful Process to connect multiple test sites needs to be dry run

13 © 2011 Electric Power Research Institute, Inc. All rights reserved. Together…Shaping the Future of Electricity