Tim Date, Manager Risk Management Planning Unit

Slides:



Advertisements
Similar presentations
BLR’s Safety Training Presentations
Advertisements

Radiopharmaceutical Production
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
EPCRA Emergency Planning and Community Right-to-Know Suzanne Powers
Superfund Amendments & Reauthorization Act (SARA TITLE III) OR Emergency Planning & Community Right-to-Know Act (EPCRA) Presented by Ian Ewusi IERC Field.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Contractor Management and ISO 14001:2004
Jack Harrah Governor’s Office of Emergency Services
Environmental Management Systems An Overview With Practical Applications.
How to Implement the CalARP Program
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
School Safety Training
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
CalARP Formal Evaluation Review
Erika White September 11,  1984: Methyl isocyanate release at Union Carbide in Bhopal, India - 2,000 immediate fatalities  1985: M ethylene chloride.
Laws and Regulations Laws and regulations are major tools for protecting people and the environment. Congress is responsible for passing laws that govern.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Developing a Chemical Risk Management Program
Course Material 1.Overview of Process Safety 2.Compliance with Standards 3.Process Hazard Analysis 4.Standard Operating Procedures 5.Safe Work Procedures.
Safety and Health Programs
Process Safety Management of Highly Hazardous & Explosive Chemicals
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Pre-Qualification, Emergency Preparedness, Incident Investigation, Audits.
PSM Covered Chemical Facilities National Emphasis Program.
Process Safety Management - Tips for the Little Guy.
Incident Reporting Procedure
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
Oregon State Police Office of State Fire Marshal Emergency Planning & Response Section An Overview of the Superfund Ammendment & Reauthorization Act (SARA)
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Elements of Process Safety Management
Process Safety Management
EPCRA BACKGROUND EPCRA 301 Toxics Release Inventory (TRI)(Form R)/ RMP (Risk Management Program) Federal Forms Tier Two Oreg on has HSIS.
Hot Topics in CAA – 112(r) Federal Program Update GA AWMA REGULATORY UPDATE CONFERENCE Adam G. Sowatzka April 16, 2013.
ISAT 422: Environmental Management Disasters and Right to Know n Unlike OSHA, focus is on non-employees – Neighbors in community – Emergency responders.
1 E-Plan Web-Based Tier II Reporting System Emergency Planning and Community Right-to-Know Act (EPCRA)
Overview of the Emergency Planning and Community Right to Know Act Southern Plains Area USDA/ARS.
GW Lupton, Management Analyst Risk Management Planning Unit State Emergency Response Commission Risk Management Plan: Protecting the Community Florida.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Ert 312 LECTURE 4 OSHA & DOSH.
State Emergency Response Commission SERC January 5, 2009 TENNESSEE EMERGENCY MANAGEMENT AGENCY.
Clean Air Act Section 112(r) Federal Program Update U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness February 15, 2007 CUPA Training.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Emergency Planning in your business St. Louis City LEPC General Meeting September 4, 2013.
Process Safety Management (PSM)
Lecture 2 ENGR. MARVIN JAY T. SERRANO Lecturer
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
Denise Imbler, Program Administrator Florida Hazardous Materials Planning and Prevention Program
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
State of Georgia Release Management Training
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Safety and Health Program Don Ebert- Risk Manager (509)
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
TIER 2 REPORTING Bernardine Zimmerman TIER 2 CHEMICAL REPORTING PROGRAM or
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Incident Reporting And Investigation Program
CO Chemical Safety Workshops for Regulated Facilities
Emergency Planning 101 A Regulatory Review & Tips for Getting Started
Incident Reporting And Investigation Program
The Emergency Planning & Community Right-To-Know Act
Emergency Planning and Community Right-to-Know Act (EPCRA)
TRTR Briefing September 2013
Process Safety Management
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Radiopharmaceutical Production
Presentation transcript:

Tim Date, Manager Risk Management Planning Unit Risk Management Plan: Protecting the Community Florida Division of Emergency Management www.floridadisaster.org State Emergency Response Commission Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act Tim Date, Manager Risk Management Planning Unit

Safety Brief and Introductions

Risk Management Program Overview Purpose of Section 112(r) and the Risk Management Program Requirements Facilities Typically Regulated Under Risk Management Program Risk Management Program Elements Program Level Screening Compliance Audits Typical Enforcement Audit Findings Division’s Audit Selection Criteria and Process

Federal Actions - Background Information 1984 Releases of methyl isocyanate kills more than 2,000 people in Bhopal, India. 1985 As part of its Air Toxics Strategy, EPA initiates the Chemical Emergency Preparedness Program (CEPPO).

Federal Actions - Background Information (cont’d) 1986 Emergency Planning & Community -Right-To-Know Act (EPCRA), Superfund Amendments and Reauthorization Act of 1986 Aka SARA/Title III States must establish State Emergency Response Commissions (SERCs) and Local Emergency Planning Committees (LEPCs) Covered facilities must provide site information to SERCs, LEPCs and local fire departments for emergency planning. Development of the Toxic Release Inventory (TRI) to characterize pollutants emitted from covered facilities. Emergency notification requirements for accidental releases of certain hazardous substances.

Federal Actions - Background Information (cont’d) The resulting regulations that EPA adopted in accordance with Section 112(r) are the Chemical Accident Prevention Provisions (CAPP) found in 40 Code of Federal Regulations, Part 68. CAPP lists the regulated substances and their thresholds. The CAPP is commonly referred to as the Risk Management Program This is were RMP unit comes into play

Purpose of Section 112(r) and the Risk Management Program Requirements To reduce & prevent accidental chemical releases. To reduce the severity & minimize the consequences of chemical releases. To improve coordination & communication between regulated facilities & local emergency preparedness & response agencies to improve emergency response.

Facilities Typically Regulated Under RMP Drinking water treatment plants Wastewater treatment plants Food and cold storage facilities Ammonia retailers Chlorine repackaging and distributors Chemical manufacturers Utilities Petrochemical facilities Pulp mills Fertilizer producers Swimming pool service/supply businesses Military, energy installations (mostly federal facilities)

Overview of Risk Management Program Requirements If facilities use, store, manufacture, or process substances on the Section 112(r) list above Threshold Quantity (TQ), must develop and implement a Risk Management Program. Section 112(r) Listed Chemicals - 77 Toxic Substances & 63 Flammable Substances. Most Common Risk Management Program Chemicals in Florida - Ammonia, Chlorine, Sulfur Dioxide, Hydrochloric Acid, Hydrofluoric Acid, & Nitric Acid. Requirements & Complexity vary based on Program Level of Process.

Program Level Screening for Regulated Processes Regulated processes assigned to one of three program levels, based on: Potential for off-site consequences Accident history OSHA Process Safety Management (PSM) Within certain Standard Industrial Classification (SIC) Codes identified as having significant accident history. Program Level 1 - no offsite impacts Program Level 2 - streamlined prevention program (7 components) Program Level 3 - full RMP program (12 components)

Submission of Risk Management Plan After developing a facility’s Risk Management Program, a summary of the program must be submitted to the U. S. Environmental Protection Agency online through RMP*Esubmit The summary, called a Risk Management Plan, includes information of all the requirements of the Risk Management Plan

Management of Risk Document when solution was implemented

What is a compliance audit? Self audit of the covered process which triggers a facilities need to file a Risk Management Plan with the EPA. All elements should be reviewed and deficiencies noted tracked and assigned responsibility for completing necessary corrections. U. S. Environmental Protection Agency, and Division of Emergency Management checklists or any auditing tool can be used to evaluate the program requirements. Required to be completed every three years.

Building a Compliance Audit Team Facility is required to have one person who is knowledgeable about the covered process. Review the employee participation program which should include who helped develop the Risk Management Program. Operators, mechanics, administration, contractors, and consultants can be included. “Sister facilities” and allied facilities may help bring outside eyes and ideas into the process. Local responders

Other Requirements of a Compliance Audit A report must be generated. Responses to audit findings must be documented. Action of findings must be documented. Must keep the past two compliance audits. Must certify that the compliance audit evaluated the program.

Management System A qualified person is assigned the overall responsibility of Risk Management Program development, implementation and integration. Other persons responsible for implementing individual requirements of the Risk Management Program are documented through an organizational chart. One person….only one?

Hazard Assessment Off-Site Consequence Analysis Worst-Case Release Scenario – Description of the vessel or pipeline and vessel selected Assumptions and parameters used Rational for selection of assumptions Alternative Release Scenario Description of scenarios identified Method used to determine distance to endpoint Use of most recent Census data

Process Safety Information MSDS sheets Block flow diagram Process chemistry defined Maximum intended inventory Safe Upper and Lower limits of: Temperature, Pressure, flows, and composition Consequences of deviations from the stated limits

Process Hazard Analysis (PHA) If initial process hazard analysis was performed in 1999, was the five year revalidation performed in 2004 Has the facility determined and documented the priority order for conducting the process hazard analysis Has the process hazard analysis addressed the following: Hazards of the process Identification of any incident with potential for catastrophic consequences (This should at least include the what was identified in the process safety information) The facility has established a system to promptly address the team’s findings & recommendations, assures the recommendations are resolved in a timely manner and documented

Operating Procedures Do the operating procedures include the following: initial start up, normal operations, temporary operations, emergency shutdown, emergency operations, normal shut down, start up following a turnaround or after an emergency shutdown Consequences of deviation from operating limits and steps required to avoid or correct deviations in operating limits are addressed Quality control and maximum intended inventory must be defined. Safety systems and their functions must be identified. Annual certification that the operating procedures are current and accurate and procedures have been reviewed as often as necessary

Training Employees involved in operating a process are provided with initial training Initial training includes emphasis on safety and health hazards, emergency operations and safe work practices Refresher training is provided at least every 3 years The facility ascertained and documented in a record that each employee involved in operating a process has received and understood the required training Training records identify the employee, date of the training, and means used to verify that the employee understands the training

Mechanical Integrity Written procedures to maintain the on-going mechanical integrity of process equipment are established and implemented The facility has followed recognized and generally accepted good engineering practices for inspections and testing procedures Each inspection and test is documented Equipment deficiencies found outside acceptable limits defined by the process safety information are corrected before further use or completed in a safe and timely manner

Management of Change Written procedure to manage changes to process chemicals, technology, equipment, and stationary sources that affect a covered process are established and implemented. Operation, maintenance and/or contract employees whose job would be affected by the change are informed of, trained in, the change prior to start-up of the process. If the change resulted in a change in operating procedures or practices, the procedures had been updated accordingly. Completed management of change should be used for revalidating and updating associated program elements such as the process hazard analysis.

Pre-Start Up Review For new and/or modified stationary sources is performed when change or modification in a process was significant enough to require a change in process safety information For new stationary sources, process hazard analysis has been performed and recommendations have been resolved Modified stationary sources meet the requirements contained in the management of change

Incident Investigation Each incident which resulted in, or could reasonably have resulted in, a catastrophic release of a regulated substance has been investigated Each incident investigation is initiated not later than 48 hours following the incident At the conclusion of investigation, a report is prepared A system to address recommendations from the report findings has been established and implemented

Employee Participation Written plan of action regarding the implementation of employee participation is developed Employees and their representatives are consulted on the conduct and development of process hazard analyses and other elements of process safety management Employees and their representatives are provided access to process hazard analyses and to all other information required to be developed by 40 Code of Federal Regulations, Part 68

Hot Work Permit Hot Work permits are issued for each hot work operation conducted on or near a covered process Hot work permits document that fire protection and prevention requirments in 29 CFR 1910.252(a) have been implemented prior to beginning hot work operations Example of work performed with out a Hot Work Permit-Bethune point Water Plant explosion – 2 fatalities

Contractors When selecting a contractor, information regarding contractor safety performance and programs is obtained and evaluated. Contractor is informed of all known potential fire, explosion or toxic release hazards related to the contractor's work and the process. Contractor performance is periodically evaluated in fulfilling the obligations. You can use Occupational Safety and Health Administration data and other insurance information. May times, a company’s procurement policies already meet these requirements.

Emergency Response for Non-Responding Facilities Toxic substances held above TQ are included in the Local Emergency Planning Committee’s community emergency response plan and flammable substances above threshold quantity have response plans coordinated with the local fire department. Appropriate mechanisms are in place to notify emergency responders. Call down lists include the State Warning Point and the U. S. Environmental Protection Agency’s National Response Center within 15 minutes of a release.

Emergency Response Program Requirements for Responding Facilities Written emergency response program is developed & maintained onsite. Procedures/actions to be taken in event of chemical release. Procedures for notifying the public & local responders for releases. Information on first aid & medical treatment. Procedures for use of emergency response equipment & inspection, testing & maintenance. Emergency response program coordination with local responders. Training for employees.

Releases subject to Section 304 Section 304 requires certain releases of chemicals to be reported by the facility owner or operator. There are two types of chemicals that require reporting under this section: Extremely Hazardous Substances (EHSs) Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) hazardous substances If an amount equal to, or greater than, the reportable quantity is released or spilled from a fixed facility, notification must be made immediately (within 15 minutes) to: State Warning Point at (850) 413-9911 National Response Center at (800) 424-8802 Within 7 days after a release it is required the O/O of the facility must provide one or more written follow-up emergency notices. The notice(s) must be submitted to the SERC and the appropriate Emergency coordinator for the LEPC

General On-Site Audit Findings: WTPs & WWTPs Ammonia refrigeration Chlorine & Other Chemical Repackagers Inadequate documentation, development, and/or implementation of 1 or more prevention program components. “Bookshelf” & Generic Programs. Good program, but not implemented. Many facilities complying with technical aspects of program, but documentation incomplete.

Specific On-Site Audit Findings Hazard Assessments - Not available onsite; Incorrect modeling parameters, no rational for selection of release scenarios Incorrect program level status Program Level 1 - Public receptors were identified within endpoint distances. Program Level 2 - Refrigeration facilities subject to OSHA’s PSM. Most deficiencies to date pertained to: Mechanical Integrity Operating Procedures Training Program PHA

Specific On-Site Audit Findings: Mechanical Integrity - PM protocols not developed or implemented. Inspection and testing not performed. Minimal record keeping. Operating Procedures - Operating phases, limits not addressed. Mostly emergency shutdown & assignments. Not Certified Training Program - Operator & Maintenance training / tracking incomplete. Documentation of how employees understood training. Process Hazard Analysis - incomplete hazard ID (such as hurricanes, over pressurization, equipment failure, human error, etc.) – no follow-up on action items

Specific On-Site Audit Findings: Management of Change & Pre-Startup Safety reviews and Employee Participation not performed. Contractor Safety Program - Non-existent. Not implemented Compliance audit has not been completed or action items have not been implemented Emergency Response Program - Not coordinated with local responders. Procedures for ER equipment use & inspections not documented. Inadequate training.

Audit Selection Criteria Previous and current accident history of facility Overall accident history of other facilities in same industry Facility location & proximity to population centers Chemical & quantities of Program-regulated chemicals on-site Compliance with or inspection by allied agency programs High Risk and Results of compliance audits Neutral, random oversight Other factors deemed necessary to protect public safety & health.

Overview of the Division’s RMP Audit Process Basic “Desk Audit” Focuses on the data contained in EPA data base (also complied with prior to on-site audit) Prior to On-Site Audit “Document Audit” this is a review of facility hard copy plan. On-Site Compliance Audit is a complete look at the facility and the hard copy plan.

RMP Audit Process (cont...) Prior to site audits: • Send audit notification letter requesting Risk Management Plan supporting documentation. • Request for process hazard analysis, training records, incident investigation reports, emergency response plan, compliance audit reports. • Use “Documentation Review / On-Site” Audit Checklist. • Review of supporting documentation. • This approach reduces time on-site. Helps determine focus of audit visit. • Schedule date(s) for on-site audit. Send notification of on-site audit.

RMP Audit Process (cont...) On-site audit activities - Focus on overall Risk Management Program Plant Tour of facility’s process chemicals & operations. Interview facility representatives. Review of facility operations, procedures, supporting Risk Management Plan documentation, etc. Adequacy & completeness of Risk Management Program documentation. Development & implementation of required Risk Management Program elements. Emergency Response - Coordination with local response agencies. Document findings - “On-Site” Audit Checklist.

What to Expect During an On-Site Audit? • Risk Management Program Audit Team - Usually 2 persons • Local Emergency Planning Committee Staff Contact invited to accompany team. • Audit agenda & assignments faxed prior to visit date. • Opening meeting (audit purpose/objectives, agenda, safety issues, etc.) • Tour of facility’s regulated chemicals and processes. • Review Risk Management Program supporting documentation. • Interview facility representatives. • Exit briefing (findings, identified deficiencies, recommendations, schedule for audit report, schedule for corrections, copy of audit checklist).

What to Expect After an On-Site Audit? • The Division issues Preliminary Determination Report Includes audit team’s observations, findings, recommendations. Identifies deficiencies to be corrected. Identifies necessary revisions to Risk Management Plan. Includes timetable(s) for correcting deficiencies and/or revising Risk Management Plan.

What to Expect After an On-Site Audit? (cont...) • Facility Response to Audit Report Must be received within approved timetable(s). Usually allow 60 - 90 days for corrections & revisions. Written request for extension prior to deadline date, if needed. Upon receipt & review of requested information, the Division issues: Final Determination Report - If information correct & complete. Interim Audit Report - If additional information is necessary.

How to Prepare for an RMP Audit? • Review the Division’s Audit Checklists. • Obtain & organize RMP supporting documentation prior to scheduled audit date. • Include Standard Operating Procedures, hazard assessments, process hazard analysis & process safety information, training records, maintenance logs, management of change forms, emergency response procedures, etc. • Determine appropriate facility personnel to include in audit.

Role of the Local Emergency Planning Committees (LEPCs) LEPCs support the Emergency Planning and Community Right to Know Act (EPCRA) by using the data collected on Tier II’s to develop hazardous materials emergency plans used for responding to and recovering from releases or spills of hazardous or toxic substances They also conduct Hazard Analysis for facilities within their districts

Department of Homeland Security Site Security for Chemical Facilities http://www.dhs.gov/xprevprot/laws/gc_1166796969417.shtm

Questions?

Available Technical Assistance and Resources Contact the Division’s Risk Management Planning Program staff at: (850) 413-9970 (800) 635-7179 (Florida only) Florida’s RMP Program web page for state & federal requirements, audit checklists, step-by-step guidelines. http://www.floridadisaster.org/cps/arprmp/start.htm Guidance documents, model RMP plans, other RMP resources also available from EPA http://www.epa.gov/emergencies/index.htm E-mail: tim.date@em.myflorida.com