Left side compressor behind Left control box Right side compressor behind Right control box.

Slides:



Advertisements
Similar presentations
Refrigeration Basics 101 By: Eric Nelson.
Advertisements

Coach Air Conditioning
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
NMR-262 Repair Instructions
General System Maintenance BUS 4 COMPONENT FLOW.PPT
Left Side Discharge Pressure Regulator
Truck Trailer Refrigeration Maintenance
Refrigeration Flow Control
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
HVACR312 - Refrigeration Metering Devices.
EXPANSION VALVE SYSTEM
Unit 8: Leak Detection, System Evacuation, and System Clean-up
The Refrigeration System
Service Fittings and Pressure Gauges
COMMERCIAL REFRIGERATION UNIT 25
Trouble Shooting and Performance Testing
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Air Conditioning EPA Type II.
A/C testing and service. Before testing and service, technician must be certified by ASE, MACS, or IMACA.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
Always Learning. CHAPTER 12 A/C System Inspection and Diagnosis.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
1 A/C Pressure Test and Evacuation. 2 Leak Detection Leak detection must be done after every repair job. It must also be done anytime the appliance can.
1 HVACR318 – Refrigeration II Diagrams. 2 Hooking up Gauges on Suction and Discharge Lines.
CCNA1 v3 Module 9 v3 A+ Type 2 JEOPARDY K. Martin.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
GAUGE AND MANIFOLD IDENTIFICATION © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Air Conditioning Charging.
A/C SYSTEM SERVICE 1  A/C manifold gauge set  Manifold valves  Hose end valves  Performance test  Pressure diagnosis  Manifold purging and disconnect.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Advanced Engine Performance Diagnosis, Fourth Edition James D. Halderman Copyright ©2009 by Pearson Higher Education, Inc. Upper Saddle River, New Jersey.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
AIR CONDITIONING (COOLING)
Vacuum, Charging and Recovery Sugiyanto, S.T., M.Eng.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Gauge Installation and Removal Procedures By: Inmer Amaya.
3. Climate Control Systems Service Automotive – Heating & Air Conditioning Topics covered in this presentation: Gauge set and refrigerant Service ports.
Evacuation & Dehydration Seminar
TXV Devices.
delivered with the compressor
Automotive Heating And Air Conditioning
SVC Bulletin for DVM PLUS 2 & 3 [The margin of Oil in the Compressor]
Climate Control Systems Service
R1 Fundamentals of Refrigeration
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
Climate Control Systems Service Air Conditioning System Service
The Step by Step Charging Techniques
Refrigeration Basics By: Mohamed Iqbal Pallipurath.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 6 Controls and Accessories.
R3 Controls, Valves, Accessories & Heat Pumps
R1 Fundamentals of Refrigeration
PCV and EVAP Emission Control Systems
R1 Fundamentals of Refrigeration
By: JAGDEEP SANGWAN Refrigeration Basics 101.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Instructions: Adding refrigerant fluid to system
Presentation transcript:

Left side compressor behind Left control box Right side compressor behind Right control box

Compressor Oil Sight Glass During normal operation sight glass should be ¼ to ¾ full of Oil System must run for 20 minutes prior to checking oil level

Opening the Discharge Access Valve Remove Valve Cap Turn CCW with wrench to back seat

Opening the Suction Access Valve Remove Valve Cap Turn CCW with wrench to back seat

Compressor Service Valves Open to the system - with access to the service connection!

Compressor Service Valves Flow from the compressor to the Suction or Discharge line is stopped Closed to the system - with Compressor Pressure access to the service connection!

Manifold Gauge Sets High Side Gauge Low Side Gauge - Compound Gauge Utility Hose High Side Hose Low Side Hose

Compound Gauge Positive Pressure Scale Built-in PT Charts Adjustment Screw Vacuum Scale (Reference Only!)

MGS - Frontseated Each Gauge is isolated to it’s Hose! High Side Hand Valve Low Side Hand Valve

MGS – Low Side Backseated High Side Hand Valve Low Side Hand Valve

MGS – High Side Backseated High Side Gauge and Utility Hose open to High Side! High Side Hand Valve Low Side Hand Valve

Installation, Purging & Removal of Manifold Gauge Sets (MGS)

Purging a MGS If MGS is new, was exposed to atmosphere or used on a different refrigerant, you must purge them! Remove Compressor Service Valve Stem Caps and insure valves are fully backseated. Remove Access Port Caps. Install High Side Hose and Low Side Hose.

Purging a MGS Do Not Connect the Utility Hoses. Backseat the high side MGS hand valve. Leave low side MGS hand valve frontseated. Open Discharge Service Valve - 1/4 turn. Use purge fitting to purge contaminants from utility hose. Frontseat high side MGS hand valve. Repeat process for low side.

Installation of MGS Remove Compressor Service Valve Stem Caps and insure valves are fully backseated. Remove Access Port Caps. Frontseat MGS hand valves. Install High Side Hose. If MGS has positive pressure and was used for the same refrigerant, purging is not necessary.

Installation of MGS Install Low Side Hose. Connect Utility Hose to MGS dummy port. Midseat Discharge Service Valve - 1/4 turn Midseat Suction Service Valve turns. Gauges are now installed and ready for checking system pressures!

Removal of MGS With the unit operating. –Backseat the Discharge Service Valve. –Midseat the MGS Hand Valves. –Let the pressure in the MGS stabilize to Suction Pressure. –Frontseat the MGS Hand Valves. –Backseat the Suction Service Valve. –Remove Hoses.

Low Side Pump-down Purpose –To perform general service on the Filter-drier, Modulation Valve, Suction Solenoid Valve, Heat Exchanger and TXV Valve. Procedure –Install Manifold Gauge Set. –Operate unit in Cool Mode for minutes. –Close the Liquid Line Hand Valve.

Low Side Pump-down Procedure (con’t) –Monitor the Low Side Gauge and shut unit OFF when it reaches a slight vacuum (5” hg max.) –Monitor the Low side gauge: Pressure rises above 2-3 PSIG - pump down again! Pressure does not rise above 2-3 PSIG - continue! –Front-seat the Suction Service Valve. All Refrigerant is now trapped in the Condenser and the Receiver tank!

Manifold Gages hooked up to monitor Refrigerant Pressures

Refrigerant Charging with Manifold Gages Cylinder Valve R404a refrigerant cylinder

You can now service: