Unihose Dispenser Workshop June 16, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental Protection Agency.

Slides:



Advertisements
Similar presentations
2007 CAH HF Program Group 2 Roadmap Next Steps for Phase II January – March 2007 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Engage Internal Stakeholders Plan/Educate.
Advertisements

June 16, 2010 California Air Resources Board LaMar Mitchell1 Basic Guide to Gasoline Vapor Recovery at the Gasoline Dispensing Facility Gasoline vapor.
Environmental Protection Commission of Hillsborough County Rule Revision Update June 28, 2012.
SCAQMD Boiler Rules Rule – Emissions of Oxides of Nitrogen from Large Water Heaters and Small Boilers March 22, 2006.
MCIC Workshop 2012 Complying with NC Air Quality Regulations Boiler MACT/GACT and 112j Steve Schliesser Division of Air Quality Environmental Engineer.
November 14, 2003 Aboveground Storage Tank Enhanced Vapor Recovery.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Public Workshop Proposed Modifications to the Clean Fuels Regulations Regarding Clean Fuel Outlets March 18, 1999 California Environmental Protection Agency.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
California Air Resources Board Enhanced Vapor Recovery.
Electric Vehicle Infrastructure and Accessibility David Worthington Fleet Manager County of Sonoma “Plug In” Electric Vehicle Workshop How Local Governments.
California Air Resources Board December 12, 2002 Enhanced Vapor Recovery Technology Review.
12/25/2009 Pleasure Craft Proposal Draft Pleasure Craft Evaporative Emissions Regulation and Standards.
Gasoline Dispenser Hose Permeation Workshop November 13, 2003 Monitoring and Laboratory Division Air Resources Board California Environmental Protection.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
1 ENHANCED VAPOR RECOVERY An Update Presented by Laura McKinney at the Petroleum Equipment Institute’s CONVEX2000 October 2, 2000 California Environmental.
2006 Grants Programs to Reduce Air Pollution Public Workshop Feather River Air Quality Management District March 17, 2006.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Vandenberg Air Force Base E-85 Fueling Facility California Air Resources Board E-85 Workshop Presented by Stu S. Webster Metcalf & Eddy 02 February 2006.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
Evaluation and Appraisal Comprehensive Plan Amendments City Council Workshop December 9, 2014.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
E85 Fuel Dispensing at LBNL CARB E85 Workshop, February 2, 2006 Slide # 1 Berkeley Lab’s Involvement in the California Air Resources Board’s Research and.
Enhanced Vapor Recovery Amendments Workshop September 9, 2002 Air Resources Board California Environmental Protection Agency.
OTC Attainment Planning Update SIP Steering Committee April 13, 2011.
STATEWIDE WORKSHOP ON THE CALIFORNIA MOTOR VEHICLE EMISSIONS STANDARDS INCLUDING GREENHOUSE GASES December 5, 2007 Department of Environmental Regulation.
1 June 23, 2004 Sacramento Thermal Spraying ATCM Second Public Workshop.
Public Meeting to Discuss the Feasibility of Meeting the 25 Percent VOC Standard for Aerosol Adhesives November 8, 1999 California Environmental Protection.
Cargo Tank Program Emissions and Regulation Development Public Workshop March 2, 2005 ARB, MLD 1st Floor Conference Room th Street Sacramento, CA.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
1 Fuels Workshop California Environmental Protection Agency Air Resources Board May 2, 2005.
MLD - Proposed TP Proposed Vapor Recovery Test Procedure TP DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.
Stage II Vapor Recovery Update SIP Steering Committee Meeting April 13, 2011.
Vapor Recovery Requirements for E85 Dispensing Facilities Meeting to Discuss Vapor Recovery Requirements for Facilities that Dispense E85 February 2, 2006.
13/3/2010 Spark-Ignition Marine Engine Draft Proposal.
CALIFORNIA’S AIR TOXICS PROGRAM: IMPROVEMENTS TO ASSESS HEALTH RISK Update to the Air Resources Board July 24, 2014 California Environmental Protection.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
1 Public Hearing for Amendments to Rule 2020(Exemptions) Rule 4621(Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants)
Public Workshop Proposed RACT/BARCT Determination for Stationary Spark-Ignited Internal Combustion Engines August 29, 2000 California Environmental Protection.
City Council Meeting December 15, 2015 Planning Division File No. CUP
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Work Related to Senate Bill 2202 (effective January 1, 2001)
1 Final Regulation Order for Truck and Bus Regulation California Environmental Protection Agency Air Resources Board November 20, 2014.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
Refueling Spillage Control For Small Off-Road Engines Air Resources Board August 6, 1998 Dean Bloudoff.
Presented at the Fifth Annual California Unified Program Conference February 6, 2003 Enhanced Vapor Recovery Cindy Castronovo Air Resources Board Cal-EPA.
1 Draft Landfill Methane Control Measure California Air Resources Board April 22, 2008.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING April 17, 2002.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
Public Workshop: California Regulations and Test Procedures for Sand Cars October 24, 2006 Air Resources Board California Environmental Protection Agency.
Phase II Enhanced Gasoline Vapor Recovery and In-Station Diagnostics
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
General Permits and General Operating Permits under construction
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Petroleum Storage Tanks – Program Updates
Division of Waste Management
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Arsenic Acceptable Ambient Level Revision
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Environmental Management Commission, March 9, 2017
Petroleum Storage Tanks – Program Updates
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
CLEPA comments on OBD II GTR 18 Draft
Presentation transcript:

Unihose Dispenser Workshop June 16, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental Protection Agency

2 Agenda Introductions Background for Unihose Requirement Proposed amendments Economic Impact Cost-Effective Analysis Schedule

3 Gasoline Dispenser Configurations: Unihose vs. Six-pack

4 Unihose Requirement History Feb Proposed for EVR Phase II systems Mar Proposal modified at board meeting to exempt existing stations if installed before effective date of CP-201 Oct unihose effective date clarified to be April 1, 2003 as part of 2002 EVR tech review amendments Jan Industry comments on high cost of ORVR compatibility due to unihose trigger

5 Onboard Refueling Vapor Recovery or “ORVR”

6 ORVR - Phase II Incompatibility

7 EVR Emission Reductions

8 Revised EVR Timeline Dotted box: time between start of 4-year clock and operative date Start of solid bar: date required for new or modified facilities (operative date) End of solid bar: date required for existing facilities (installed before start of bar) Not required for dispensers installed before April 2003 March 2004

9 ORVR Compatible Phase II Systems Healy(G and G ) nozzle senses ORVR vehicle and turns off assist vapor pump Balance(G-70-52, etc) no forced air ingestion approval letter 03-04, March 2003 Hirt(G AA) limited to 8 fueling points approval letter 03-06, March 2003

10 Unihose Requirement: Proposed Amendment There shall be only one hose and nozzle for dispensing gasoline on each side of a multi-product dispenser (MPD). This shall not apply to facilities installed prior to April 1, 2003 unless the facility replaces more than 50 percent of the dispensers or makes a modification, other than the installation of required sensors, that modifies over 50 percent of the vapor piping in the dispensers. Facility modifications that meet the definition of “major modification” for a Phase II system in D-200 trigger the unihose requirement as the facility is considered a “new installation”. Exception: dispensers which must be replaced due to damage resulting from an accident or vandalism may be replaced with the previously installed type of dispenser.

11 Gasoline Stations (GDF) Rank by Volume Fuel Dispensed

12 Cost Estimates to Convert Gilbarco to ORVR-compatible System under Existing Regulation* *provided by WSPA/CIOMA in January 2004 comments

13 Cost Estimates to Convert Gilbarco to ORVR-compatible System under Staff’s Proposal* *provided by WSPA/CIOMA in January 2004 comments

14 Cost-Effectiveness Assume 9,750 stations half assist and half balance For assist: assume half Gilbarco and half Wayne For assist: assume 40% “old 6- pack”, 45% “new 6-pack” and 15% unihose

15 Cost-Effectiveness Under Existing Regulation

16 Cost-Effectiveness Under Staff’s Proposal

17 Cost-Effectiveness Summary

18 Rulemaking Schedule June 4, Release staff proposal June 16, Workshop July 22, Board hearing If approved by Board: July Submit emergency reg August Finalize rulemaking

19 Contact Information Cindy Castronovo (916)