09/09/20151 ESKOM’S PROPOSED REVENUE APPLICATION MULTI-YEAR PRICE DETERMINATION 2010/11 TO 2012/13 (MYPD2) NERSA’s PUBLIC HEARING 19 January 2010 - Port.

Slides:



Advertisements
Similar presentations
Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
Advertisements

Current and Forthcoming Issues in the South African Electricity Sector Ioannis N. Kessides The World Bank.
BI Marketing Analyst input into report marketing Report TitleElectricity in South Africa Report Subtitle Country profile of power sector, market trends.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Promoting Energy Efficiency In Buildings in Developing countries.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
Response to the Eskom Revenue Application for the Multi Year Price Determination for the period 2010/11 to 2012/13 (MYPD 2) Presentation by Business Unity.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
Comments on Progress with regard to Solar Water Heater Rollout Select Committee on Economic Development 28 February 2012.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
Water Services Reform – the Durban experience : successes and challenges Neil Macleod Durban South Africa.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
Spain: Can we give up any of the primary energy sources? Alejo Vidal-Quadras Roca Vice-President of the European Parliament Member of the Industry, Energy.
Natural Gas Shortages in Developing Countries Natural gas: The bridging fuel in the next decades Bent Svensson World Bank ENERGY WEEK 2006.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
CITY OF CAPE TOWN’S SUBMISSION ON ESKOM’S MULTI-YEAR PRICE DETERMINATION – 2010/11 – 2012/13 (MYPD 2) City of Cape Town represented by : Alderman Ian Neilson.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
Willie de Beer, COO, EDI Holdings Potential Impacts of EDI Restructuring Potential generation and transmission impacts as a result of restructuring the.
1 Presentation By: Mr.O. Aphane Acting Deputy Director General: Electricity, Nuclear and Clean Energy (on behalf of the Director General, Ms N Magubane)
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 14 NOVEMBER 2012 IPAP 2012/10.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
The strategy for improved electricity distribution maintenance 9 June 2008.
Intermediation of Small-Scale Carbon-Financed Clean Infrastructure Projects – The Development Bank of Southern Africa’s Experience and Prospects Rob.
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
The Institute for Municipal Finance Excellence NERSA HEARINGS 20 JANUARY 2010 Eskom’s Revised Revenue Application MYPD 2010/11 – 2012/13.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
Green Connection - Southern African FAITH COMMUNITIES ENVIRONMENT INSTITUTE Liziwe McDaid.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Electricity Distribution Industry (EDI) South Africa Presentation to the Joint Parliamentary Portfolio Committees of ENERGY and COOPERATIVE GOVERNANCE.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Presentation to Select Committee on Economic Development
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
It’s now time for political decisions
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Michael Maphosa and Patrick Mabuza
NERSA presentation at the PPC meeting held on 24 May 2006
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
ELECTRICITY PRICING POLICY AND IMPACT ON THE MULTI YEAR PRICE DETERMINATION BY NERSA Matthews Bantsijang 7/6/2018.
EIUG Energy Intensive Users Group Comments on the Energy Bill
progress of the water reform in bulgaria
Electricity Price Increase 2008/9
Topic: Possible Restructuring of the Electricity Distribution Industry
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
The Electricity Distribution Industry
OUTLINE RE Programme Objectives Integrated Resource Plan
NUM WESTERN CAPE SUBMISSION ON IRP 2018
Isaac Sokopo Group Electrification Planning Manager
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Presentation transcript:

09/09/20151 ESKOM’S PROPOSED REVENUE APPLICATION MULTI-YEAR PRICE DETERMINATION 2010/11 TO 2012/13 (MYPD2) NERSA’s PUBLIC HEARING 19 January Port Elizabeth by Dr Wolsey Barnard and Mr George Ferreira Enbar consulting EnBar Consulting

09/09/20152 Overview of Submission EnBar Consulting  Generation history and Energy Policies  ESI Supply structure (1990 – 2010)  Key Energy Policies not implemented  Effect of not implementing Energy Policies  Reality of generation in SA  Actions required from various stakeholders in ESI  Way forward for NERSA  Conclusions

09/09/20153 HISTORY EnBar Consulting  Current generation constructed in the 70’s and 80’s.  Surplus capacity available until 2006 due to over capitalization in the 70’s and 80’s.  Tariffs in 90’s and early 2000’s were based on historic capacity cost and not adjusted to take into account for new capacity plant cost.  Cheap electricity of the 90’s and early 2000’s were never cost reflective and sustainable.  Long term coal contract prices were not sustainable and not based on international coal prices.  The South African economy benefited from the unsustainable low electricity prices over a period of two decades.  In December 1989 the White Paper on Energy (WPE) was published as Government's policy for the Energy sector, but only the social and no structural policies were implemented.

09/09/20154EnBar Consulting Industry/Mining Business Residential Physical Energy Flow Financial Flow Municipalities ESKOM Eskom Customers 46%, Sales 58% Municipalities (175) Customers 54%, Sales 42% Eskom:100% ~ MW installed Eskom: 98% Coal 89%, Nuclear 4% Gas 2% Hydro 1.5% Pump storage 3.5% Current Electricity Supply Industry Structure

09/09/20155 Key Energy Policies not implemented EnBar Consulting  Electricity market structure not restructured (7.1.6 WPE).  No change to the vertical integrated ESI structure.  Diversify supply options by utilize environmental friendlier generation options.  Introduction of Independent Power Producers (IPP).  Eskom not restructured ( WPE).  Separated Generation and Transmission.  Sell off Eskom generation to introduce competition – 30% was decided on by Government.  Increase competition to move away from Eskom been the supplier of last resort.  Not separating Systems Operator from Eskom Holdings ( WPE).  Government has not establish guidelines for Integrated Resource Planning (IRP) through new legislation with NERSA to oversee the implementation of it ( WPE).  Restructure the Distribution sector into RED’s (7.1.3 WPE).

09/09/20156 Effect of not Implementing Energy Policies EnBar Consulting  No change in Electricity market structure.  Kept ESI vertical integrated with no competition allowed.  As a result no IPPs could be established, since Eskom is in control of the System Operator and open excess of the Transmission lines is not practically possible.  No diversification of supply options – no Renewable Energy producers to date in country and might be so for a while until the market structure is sorted out.  Limited restructuring of Eskom.  Government propagated from 1999 – 2005 that Eskom will not have to build new power stations, since competition will be introduced with Eskom the supplier of last resort.  NERSA been faced from 2000 with challenge of not allowing Eskom a tariff increases wrt new capacity – result, unsustainable low annual Eskom tariff increases allowed until  IRP and shortages of generation capacity predicted in late 90’s and early 2000’s not taken seriously– country currently in dangerous territory wrt generation capacity.  Lack of restructure Distribution sector into RED’s.  No restructuring legislation from 2000 to 2008 – proposed Constitution Amendment in  Inefficiencies of EDI have escalating dramatically in last 8 years.  Non-payment of customers to municipalities and municipalities to Eskom are increasing at an alarming rate – financial viability for whole electricity sector in danger.

09/09/20157 Effect of not Implementing Energy Policies (cont.) EnBar Consulting  Eskom been asked at a very late stage to take up the responsibility as supplier of last resort.  No allowance has been made by Eskom nor Government for the capital cost to build two new mega coal fired power station such as Medupi and Kusile.  It does not take very clever financial calculations to work out that if a dramatic increase is not allowed now to finance these capital expenditures, the country has to face either a much higher increase (60 -70%) in two to three years time or to face massive rolling black-outs from 2015 onwards.  Irrespectively, the country is still facing serious generation shortages from 2011 onwards until the new generators are on line in 2014/5.  The additional challenge NERSA is facing in evaluating the Eskom application is that Eskom as a utility, shows serious managerial, financial and strategic shortcomings.  If the rapidly deteriorated EDI is not turned around urgently, the income stream of the ESI as a whole will decrease dramatically.

09/09/20158EnBar Consulting REALITY  The electricity industry must be sustainable on its own and can not expect major National fiscal support.  Conventional coal fired, nuclear and gas generation capacity must be rebuild and as such re-capitalised every 40 to 50 years.  Such re-capitalisation takes place at current international costs.  It is therefore unavoidable that international electricity generation prices will be largely reflected in new generation plant.  New coal contracts will also be reflective of international coal prices.  Electricity prices in other countries utilizing the same technologies than SA, are about 2 to 3 times higher than SA current tariffs.  The cost of electricity generation by newly constructed coal fired power stations will probably be about 85c per unit ( based on capacity cost of about R25mil per MW).  All stakeholders in the country will have to make a serious contribution to get through this very tough times..

09/09/20159EnBar Consulting Actions from National Government  Government needs to assist with funding capital generation expansion programme, through international loans and underwriting of Eskom borrowings.  Implement ESI and EDI restructuring as discussed above, as a matter of urgency.  Must developed regulatory policies that is sustainable and practically implementable by NERSA.  Promoting Energy Efficiency and DSM policies – increased subsidies for solar water heater good examples.  Subsidisation policies for basic electricity for indigent and poor customers.  Address the managerial, financial and strategic shortcomings within Eskom.  Ensuring that Government (National and Provincial) pay their respective electricity accounts promptly..

09/09/201510EnBar Consulting Eskom improvements required  Implement immediate actions to address managerial, financial and strategic shortcomings.  Look seriously to alternative funding- options and models.  Review all special deals based on historic low electricity prices.  Actively pursue the reduction of losses and programs to curb the theft of electricity – efficiency improvements.  Eskom to concentration more on their core business – allow IPP’s to play a more supportive capacity role.  Improvement of skills and the restoring of Eskom as a world class electricity utility.  Acting against all non-payment by Municipalities as well as direct customers promptly and without any external interference.

09/09/201511EnBar Consulting Actions from Municipalities  Eskom costs accounts for about 65% of the cost paid by Municipalities – as an example a 30% - 35% increase in the Eskom price will account for an increase of 24% to 28 % to Municipal customers, if all other increases are limited to 10% maximum.  Municipalities must implement and actively promotion EE and DSM measure/technologies.  Dramatically improve their revenue collection measures.  EDI restructuring process to be implemented by municipalities as a matter of urgency.  Manage their electricity asset in line with the income received through the sales of electricity.

09/09/201512EnBar Consulting Alternatives for customers  Free basic electricity for all poor and indigent household:  Level to be fixed nationally and be made transparent.  Non indigent residential customers can do the following:  Install solar water heaters – saving 25% on average on usage.  Introduced Energy efficient measures.  Change of customer behaviour.  Industrial and Commercial customers:  Strong drive on EE and DSM measures.  Energy switching.  Let Energy becomes a monthly reporting item.

09/09/201513EnBar Consulting Affect on Renewable Energy  No convincing needed that Renewable energy must become a major player in the future energy mix in South Africa.  Currently Eskom electricity prices:  Based on historic cost and not sustainable.  Based largely on “dirty” coal technology.  Not inclusive of the environmental cost associated with the type of generation – externalities not factored into price.  The attractiveness of renewable energy and energy efficiency sources are unfairly been compromised by comparing it to unsustainable tariffs based on historic costs.

09/09/201514EnBar Consulting Way forward for NERSA  Eskom needs huge amount of capital for current generation expansion programme:  If new generation stations is not build now, the country will be faced with a serious capacity shortage in the next 5-10 to years come.  The increase is mostly due to generation expansion programme, and not for Eskom  NERSA does not have a choice but to allow an Eskom increase that will ensure security of electricity supply to the country:  Need to interrogate the costs of the expansion programme.  To investigate very seriously to the current and future Eskom coal contacts.  Inefficiencies within Eskom been limited.  Allowance been made for improved implementation of EE and DSM measures – in light of capacity constrains from 2011 onwards.  Publish the contribution to the increase of each Eskom component separately.

09/09/201515EnBar Consulting  The current dramatic high increase requested by Eskom for the 2010 – 2013 period is mostly due to a lack of not implementing ESI and EDI restructuring policies, as well as managerial, financial and strategic shortcomings within Eskom – if this is not adhere to this industry is heading for self-destruction.  To oppose this application based on short term unrealistic cost consideration is not in the National interest - NERSA does not have a choice but to allow an increase that secure our supply of electricity in the most cost effective manner.  If all stakeholders (National government, municipalities, Eskom, NERSA and customers) are not playing its part, this dramatic tariff increase we debating today will again and again be debated for years to come.  More effort and funding need to be allocated for EE and DSM options and technologies.  Diversification of supply mix in the country needs to include Renewable Energy as a priory in the next few years to assist with the generation capacity challenges from 2011 onwards, as well as to contribute towards more greener energy supply option. Conclusion

09/09/ THE END EnBar Consulting