Crimson Consulting Cyclohexane Production Facility Analysis and Design.

Slides:



Advertisements
Similar presentations
Financial and Managerial Accounting
Advertisements

Engineering Economics Bo Hu John Nieber. Basics Financial reporting Journals, ledgers Balance sheets Income statements Financial ratios Costing of products.
Shell and Tube Heat Exchanger October 7, 2003 Cycle 2 Group 1A Frank Fadenholz Jennifer Fadenholz Christian Woods Angel Taylor.
EQUIPMENT CALCULATIONS SELECTION & SIZING. DETAIL REQUIRED FOR A PROJECT COMPONENTS NEEDED FOR EVALUATION M & E BALANCE DATA EQUIPMENT COSTS OPERATING.
Natural Gas Hydrate Transportation * David Mannel **, David Puckett **, and Miguel Bagajewicz University of Oklahoma- Chemical Engineering Abstract We.
Experiment #5: Protein Separation Project Michael Eatmon Sarah Katen Nell Keith Monica Sanders.
Blue-OX Energy Management TJ Chancellor Paul Cole Sara Habib Mira Kim Claudio Ramos Vicente Rosas.
Miscellaneous CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 17 – Equipment.
Project Analysis and Evaluation
CASH FLOW ANALYSIS PROFITABILITY. GENERAL CASH FLOW APPROACH CASH FLOW ANALYSIS PROVIDES A RIGOROUS METHOD TO COMPARE PROFITABILITY USES THE SAME COMPONENTS.
Kathryn Knopinski Kara Shelden Kim Fink Justin Sneed Mark Shreve
Proposal for Ethylene Glycol Distillation Tower Presenters: Demetrius Henry Tyler Ware Craig Staton.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 11 Project Analysis and Evaluation.
Raccoon Mountain Team Hydrogen Production Proposal
Equipments Design Production of Synthesis Gas from Natural Gas by Steam Reforming Supervised By: Prof. Mohamed A. Fahim Eng. Yusuf Ismail Ali Presented.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., 2006 Capital Budgeting and Managerial Decisions Chapter 25.
EPOH Inc. Consultants: Hope Baumgarner Tyler Gibson Wes Hudkins Joseph Nick Josh Stephens.
Chapter 22 (p ) CH EN 4253 Terry A. Ring
Business Unit Performance Measurement Chapter 14 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 11 Project Analysis and Evaluation.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
FOOD ENGINEERING DESIGN AND ECONOMICS
Kuliah Ekonomi Teknik JTK FT UGM Total product cost  Total product cost: costs for operating the plant and selling the products.  Total product.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Project Analysis and Evaluation Chapter Eleven.
Chapter McGraw-Hill Ryerson © 2013 McGraw-Hill Ryerson Limited Project Analysis and Evaluation Prepared by Anne Inglis 11.
Cyclohexane Production Unit
Heat Transfer in Small Sustainable Thermoelectric Power Sources Matthew Delaney, Nathan Coussens, Russell Austin, Peter Wills School of CBEE, CHE ,
Section 1 Dr.Hoda’s part Sheet 1: Calculating equipment cost Eng. Reda Zein.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Project Analysis and Evaluation Chapter Eleven Prepared by Anne Inglis, Ryerson University.
Ethylene Production From Tennessee Fracked Natural Gas University of Tennessee at Chattanooga ENGR 5910/ENCH /26/2012 Brandon Dodd Valentine Mbamalu.
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
CHEMICAL HEAT PUMP SAND TEAM
Written by: Pak S.I. Student of ЕП-09 м group Scientific supervisor: Candidate of Economic Sciences, Scientific supervisor: Candidate of Economic Sciences,
1 Process Analysis and Design Cost Accounting and Profitability Analysis.
Operating and Financial Leverage 5 Chapter Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
Chapter 11 Project Analysis and Evaluation McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Final Exam Review This Powerpoint is a list of what we covered in Design I. Anything from this coverage may be on your final exam. (Obviously, I will emphasize.
Team Yellow. Experiment 3 IRI Economics FCI and Annual Costs FCI is $4.63 million Annual product cost is $104 million Annual cash flow is -$77 million.
9-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 4e, by Ross, Thompson, Christensen, Westerfield & Jordan.
Profitability Analysis-II Chapter 8 & 9 ChEN 5253 Terry A. Ring.
1 Chapter 3 Appendix B Development of Objective Function.
Equipment Design Designed by Eman A. Khajah. Outline Design of Heater. Design of Stripper.
1. Introduction Basis of Design Process Structure Process Flow Diagram Equipment Design Process Control Waste, Environment, Safety Economy Conclusion.
Relevant Cash Flows. Kenny, Inc
Done by: Esraá Hajjeyah Supervised by: Prof. M.Fahim Eng. Yusuf Ismail.
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
Engineering Economy, Sixteenth Edition Sullivan | Wicks | Koelling Copyright ©2015, 2012, 2009 by Pearson Education, Inc. All rights reserved. EXAMPLE.
TOTAL CAPITAL INVESTMENT
Transfer Pricing & Utilizing Assets Employed
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
PROCESS DESIGN DEVELOPMENT
1 CHAPTER 8 Long-Term Producing Assets and Investments in Equity Securities.
04/06/2010 Production of Dimethyl Sulfoxide from Lignin Team Bravo is: Stan Das, Jeff Umbach, Russ Boyer, Krista Sutton, Mike Czepizak Project Lead: Jake.
Process Economics Factors that affect profitability
Nylon 6,6 from HMDA and Adipic Acid
Examples Example A: … Price 2 Units Costs 1,5 Total Income
Food Plant Design and Pilot Demonstration
CONTENTS DESIGN PROBLEM INTRODUCTION FLOW CHART OF DESIGN
Manajemen Industri Instructor: Rama Oktavian
Natural Gas Processing Plant
Equipment Costing CAPEX
Estimating Capital Costs
Financial Appraisal of Project
Total Cost of Plant Purchased cost – equipment f.o.b.
CHPE308 Chapter Seven (Textbook) Estimation Of Capital Cost
Production of Dimethyl Ether from Methanol ROLO Engineers Serge Boucher, MaKenzie Marshall, Jia Mo, Joseph Verro Chemical Engineering, University of New.
Miscellaneous CHEN 4470 – Process Design Practice
Presentation transcript:

Crimson Consulting Cyclohexane Production Facility Analysis and Design

Crimson Consulting “Service Worth Waiting For” Dynamic five-person team of Chemical Engineers Dynamic five-person team of Chemical Engineers Provider of quality engineering consulting services for companies in Oklahoma and the surrounding states Provider of quality engineering consulting services for companies in Oklahoma and the surrounding states Visit our company website for information on company members and projects Visit our company website for information on company members and projects

Independent Refineries, Inc. Cyclohexane Production Facility Overall Design and Analysis

Independent Refineries, Inc. Hydrogenation of benzene to form cyclohexane for industrial use Hydrogenation of benzene to form cyclohexane for industrial use 20-year project life 20-year project life Design new facility from ground-up Design new facility from ground-up Our company was contracted for process design and economic analysis of project Our company was contracted for process design and economic analysis of project

Process Flow Diagram

Initial Economic Analysis Initial Estimation of Total Capital Investment (TCI) Initial Estimation of Total Capital Investment (TCI) Determination of Annual Product Cost Determination of Annual Product Cost Determination Annual Cash Flow Determination Annual Cash Flow Profitability Analyses Profitability Analyses

Estimation of Delivered Equipment Cost Analyses based on percent of delivered equipment costs (Peters, Timmerhaus, and West) Analyses based on percent of delivered equipment costs (Peters, Timmerhaus, and West) Equipment sizing determined from provided process simulation reports Equipment sizing determined from provided process simulation reports Cost estimated based on existing equipment cost estimates as functions of size Cost estimated based on existing equipment cost estimates as functions of size Assumed 10% error from reading charts Assumed 10% error from reading charts

Estimation of TCI Estimation based on percentage of delivered equipment as outlined in PT&W Estimation based on percentage of delivered equipment as outlined in PT&W Assumed 20% error from inherent error in equipment pricing and estimated percentages Assumed 20% error from inherent error in equipment pricing and estimated percentages Fixed Capital Investment (FCI) of $1.6 million Fixed Capital Investment (FCI) of $1.6 million Total Capital Investment of $1.8 million Total Capital Investment of $1.8 million

Annual Product Cost and Cash Flow Annual product cost calculated as the sum of all costs of production; raw materials, utilities, depreciation (straight-line), etc. Annual product cost calculated as the sum of all costs of production; raw materials, utilities, depreciation (straight-line), etc. Income from sales calculated based on production data and product prices Income from sales calculated based on production data and product prices Cash flow defined as sales income minus annual product cost Cash flow defined as sales income minus annual product cost

Profitability Analyses Process found to have a return on investment (ROI) of -256%, significantly less than the 10% ROI required by IRI Process found to have a return on investment (ROI) of -256%, significantly less than the 10% ROI required by IRI Net Present worth for 2005 is -$370 million Net Present worth for 2005 is -$370 million Strauss Plots, Monte Carlo simulations, and propagation of error methods used for further profitability analyses Strauss Plots, Monte Carlo simulations, and propagation of error methods used for further profitability analyses 10% maximum probability of profitability 10% maximum probability of profitability

Pipe Network Design Network specifications provided by IRI Network specifications provided by IRI Stainless steel construction Stainless steel construction 2 in. fiberglass insulation 2 in. fiberglass insulation $822,000 installed piping, $197,000 additional annual production cost $822,000 installed piping, $197,000 additional annual production cost New plant FCI: $2,182,000 New plant FCI: $2,182,000 Additional product cost had less than 1% increase from previous estimates Additional product cost had less than 1% increase from previous estimates

Further Pipe Network Design Pressure drop analyses indicate that no additional pumps are needed in network Pressure drop analyses indicate that no additional pumps are needed in network All pipes are within bursting limitations All pipes are within bursting limitations Further size optimization calculations performed with given process data Further size optimization calculations performed with given process data Installation cost of optimized network: $87,400 Installation cost of optimized network: $87,400 FCI with optimized network: $1,450,000 FCI with optimized network: $1,450,000

Cyclohexane Production Facility Further Design and Analysis of Process Segments

Segment #1

Segment #1 Analysis Stainless steel construction Stainless steel construction 60 horsepower gear pump required to provide necessary pump work 60 horsepower gear pump required to provide necessary pump work Piping cost for segment of interest (includes stainless steel piping and valves): $4,250 Piping cost for segment of interest (includes stainless steel piping and valves): $4,250 FCI estimated from cost of installed equipment: $54,000 FCI estimated from cost of installed equipment: $54,000

Segment #1 Analysis As designed, system cannot provide required Available Net Positive Suction Head (NPSHA) greater than 2 m As designed, system cannot provide required Available Net Positive Suction Head (NPSHA) greater than 2 m Compressor must be installed before pump to provide necessary NPSHA Compressor must be installed before pump to provide necessary NPSHA Compressor must provide approximately 4 lb f /s Compressor must provide approximately 4 lb f /s

Segment #2

Segment #2 Analysis Heat exchanger design optimized in Pro/II simulations Heat exchanger design optimized in Pro/II simulations Stainless steel construction Stainless steel construction Tube diameter: 0.7 in. Tube diameter: 0.7 in. Shell diameter: 8 in. Exchanger Heat Transfer Areas: Exchanger Heat Transfer Areas: E1: 272 ft 2 E2: 240 ft 2 E3: 360 ft 2

Network Installation Cost Exchangers priced based on material and heat transfer area Exchangers priced based on material and heat transfer area Delivered equipment cost: $26,000 Delivered equipment cost: $26,000 FCI determined as percentage of delivered equipment cost FCI determined as percentage of delivered equipment cost FCI: $105,000 FCI: $105,000

Distillation Column Design Column designed in Pro/II simulation based on provided process data Column designed in Pro/II simulation based on provided process data Stainless steel construction Stainless steel construction Height determined from number of trays Height determined from number of trays Diameter determined by calculation of vapor velocity and assumed downcomer area Diameter determined by calculation of vapor velocity and assumed downcomer area Column specifications: Column specifications: height: 66 ft. diameter: 8 ft.

Conclusions and Recommendations At this time, current economic conditions are not favorable for this process At this time, current economic conditions are not favorable for this process At current benzene prices, cyclohexane price must increase to $3.04/gal for process to be profitable At current benzene prices, cyclohexane price must increase to $3.04/gal for process to be profitable Crimson Consulting does not recommend construction of this facility at this time Crimson Consulting does not recommend construction of this facility at this time

Questions? ? ? ? ? ? ? ?

References and Credits Peters, Max S., Klaus D Timmerhaus, and Ronald E. West. Plant Design and Economics for Chemical Engineers, 5th ed. New York: McGraw-Hill Companies, Inc., Peters, Max S., Klaus D Timmerhaus, and Ronald E. West. Plant Design and Economics for Chemical Engineers, 5th ed. New York: McGraw-Hill Companies, Inc., Welty, James R., Charles E. Wicks, Robert E. Wilson, and Gregory Rorrer. Fundamentals of Momentum, Mass, and Heat Transfer, 4th ed. New York: John Wiley & Sons, Inc., Welty, James R., Charles E. Wicks, Robert E. Wilson, and Gregory Rorrer. Fundamentals of Momentum, Mass, and Heat Transfer, 4th ed. New York: John Wiley & Sons, Inc., Crimson Consulting Staff: Crimson Consulting Staff: Sarah Katen, Group Manager Josef Dalaeli Nell Keith Kien Nguyen James Mansingh Special thanks to: Special thanks to: Inita Goodwin Helen Bedd Nosmo King John Bush George Kerry Perry O’Dontal Your mom Dr. PapaV